Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Eprocure
Opening Date26 Jul 2018
Closing Date24 Aug 2018
Tender Amount₹ 3,52,19,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Construction of Embankment using dozer with Material Obtained from Roadway Cutting)(Filling with Cut Earth)

755.75

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using Carted Earth)

5083.06

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km 0/200 - 1/0

448.09

-

-

... More
Km 1/0 - 2/0

560.02

-

-

... More
Km 2/0 - 3/0

544.05

-

-

... More
Km 3/0 - 4/0

560.59

-

-

... More
Km 4/0 - 5/0

561.26

-

-

... More
Km 5/0 - 6/0

561.15

-

-

... More
Km 6/0 - 7/0

558.9

-

-

... More
Km 7/0 - 8/0

559.24

-

-

... More
Km 8/0 - 8/900

501.64

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)

-

-

-

... More
Km 0/200 - 1/0

224.91

-

-

... More
Km 1/0 - 2/0

292.55

-

-

... More
Km 2/0 - 3/0

277.78

-

-

... More
Km 3/0 - 4/0

291.28

-

-

... More
Km 4/0 - 5/0

285.42

-

-

... More
Km 5/0 - 6/0

289.77

-

-

... More
Km 6/0 - 7/0

284.83

-

-

... More
Km 7/0 - 8/0

295.09

-

-

... More
Km 8/0 - 8/900

261.58

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)

-

-

-

... More
Km 0/200 - 1/0

224.91

-

-

... More
Km 1/0 - 2/0

292.55

-

-

... More
Km 2/0 - 3/0

277.78

-

-

... More
Km 3/0 - 4/0

291.28

-

-

... More
Km 4/0 - 5/0

285.41

-

-

... More
Km 5/0 - 6/0

289.77

-

-

... More
Km 6/0 - 7/0

284.83

-

-

... More
Km 7/0 - 8/0

295.09

-

-

... More
Km 8/0 - 8/900

261.58

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km 0/200 - 1/0

2998.86

-

-

... More
Km 1/0 - 2/0

3900.73

-

-

... More
Km 2/0 - 3/0

3703.73

-

-

... More
Km 3/0 - 4/0

3883.83

-

-

... More
Km 4/0 - 5/0

3805.54

-

-

... More
Km 5/0 - 6/0

3863.63

-

-

... More
Km 6/0 - 7/0

3797.79

-

-

... More
Km 7/0 - 8/0

3934.51

-

-

... More
Km 8/0 - 8/900

3487.75

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km 0/200 - 1/0

3011.61

-

-

... More
Km 1/0 - 2/0

3917.23

-

-

... More
Km 2/0 - 3/0

3732.98

-

-

... More
Km 3/0 - 4/0

3896.58

-

-

... More
Km 4/0 - 5/0

3822.04

-

-

... More
Km 5/0 - 6/0

3872.63

-

-

... More
Km 6/0 - 7/0

3821.79

-

-

... More
Km 7/0 - 8/0

3956.26

-

-

... More
Km 8/0 - 8/900

3518.5

-

-

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.

-

-

-

... More
Km 0/200 - 1/0

3011.61

-

-

... More
Km 1/0 - 2/0

3917.23

-

-

... More
Km 2/0 - 3/0

3732.98

-

-

... More
Km 3/0 - 4/0

3896.58

-

-

... More
Km 4/0 - 5/0

3822.04

-

-

... More
Km 5/0 - 6/0

3872.63

-

-

... More
Km 6/0 - 7/0

3821.79

-

-

... More
Km 7/0 - 8/0

3956.26

-

-

... More
Km 8/0 - 8/900

3518.5

-

-

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Km 0/200 - 1/0

3011.61

-

-

... More
Km 1/0 - 2/0

3917.23

-

-

... More
Km 2/0 - 3/0

3732.98

-

-

... More
Km 3/0 - 4/0

3896.58

-

-

... More
Km 4/0 - 5/0

3822.04

-

-

... More
Km 5/0 - 6/0

3872.63

-

-

... More
Km 6/0 - 7/0

3821.79

-

-

... More
Km 7/0 - 8/0

3956.26

-

-

... More
Km 8/0 - 8/900

3518.5

-

-

... More
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km 0/200 - 1/0

5.62

-

-

... More
Km 1/0 - 2/0

5.62

-

-

... More
Km 2/0 - 3/0

5.62

-

-

... More
Km 3/0 - 4/0

5.62

-

-

... More
Km 4/0 - 5/0

5.62

-

-

... More
Km 5/0 - 6/0

5.62

-

-

... More
Km 6/0 - 7/0

5.62

-

-

... More
Km 7/0 - 8/0

5.62

-

-

... More
Km 8/0 - 8/900

5.62

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(Foundation Concrete)

-

-

-

... More
Culvert @ Ch 1060m, 8622m, 2950m

14

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(Superstructure)

-

-

-

... More
Culvert @ Ch 1060m, 8622m

14

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202..(Deckslab)

-

-

-

... More
Culvert @ Ch 1060m, 8622m

4.4

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.(Upto 600 mm dia Hume pipe)

-

-

-

... More
Culvert @ Ch 2354m, 4520m, 6700m, 7094m, 7120m

25

-

-

... More
Earthwork in excavation for foundation of structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

96.63

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

98.35

-

-

... More
Hard Bed @ Ch 2950m

59.03

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

96.63

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

224.19

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

90.3

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

90.3

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

96.63

-

-

... More
Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick, wellrammed, watered and compacted complete complying as per Technical Specification Clause 305.3.9

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

11.05

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

11.24

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

11.05

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

28.03

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

10.31

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

10.31

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

11.05

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

11.04

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

11.24

-

-

... More
Hard Bed @ Ch 2950m

12.34

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

11.04

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

18.68

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

10.32

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

10.32

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

11.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203 ( Below sill level)

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

54.38

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

53.36

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

54.38

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

120.94

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

50.64

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

50.64

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

54.38

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203. (Above Sill)

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

40.38

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

43.15

-

-

... More
Hard Bed @ Ch 2950m

40.88

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

40.38

-

-

... More
Parapet wall of Existing Culvert @ Ch 5597m

0.49

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

106.69

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

27.76

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

27.76

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

40.38

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203.(Bed Block)

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

3.9

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

3.9

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

4.04

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

3.36

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

3.36

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

3.54

-

-

... More
Cement concrete 1 : 1.5 : 3 using 20mm ISS HBG metal for all RCC item of works excluding the cost of reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. (Bed Block)

-

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

3.77

-

-

... More
Cement concrete 1 : 1.5 : 3 using 20mm ISS HBG metal for all RCC item of works excluding the cost of reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. (Deck Slab)

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

8.1

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

13.32

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

8.1

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

18.71

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

3.31

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

3.31

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

4.68

-

-

... More
Supplying and fabricating and placing in position of MS steel or Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors, etc., complete complying with standard specification.

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

0.88

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

1.28

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

0.88

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

2

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

0.35

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

0.35

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

0.48

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint between Dirt wall and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

15

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

15

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

15

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

15

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

15

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

15

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

4.5

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

6

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

4.5

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

6

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

4.5

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

4.5

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

4.5

-

-

... More
Providing weepholes in Brick Masonry / Stone Masonry, Plain / Reinforced concrete Abutment, Wing wall, Return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V) : 20 (H) towards drawing face complete as per drawing and technical specifications clauses 614, 709, 1204.3.7

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

12

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

12

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

12

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

12

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

12

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

12

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

12

-

-

... More
Gravel filling between bodywall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete with standard specifications and as directed by the departmental officers.

-

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 1060m

8.81

-

-

... More
4.00 M Span RCC slab Culvert @ Ch 2354m

9.14

-

-

... More
3.00 M Span RCC slab Culvert @ Ch 4520m

8.81

-

-

... More
5.00 M Span RCC slab Culvert @ Ch 6700m

93.41

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7094m

7.7

-

-

... More
1.50 M Span RCC slab Culvert @ Ch 7120m

7.7

-

-

... More
2.00 M Span RCC slab Culvert @ Ch 8622m

8.81

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 Grading III

-

-

-

... More
Hard Bed @ Ch 2950m

23.86

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)

-

-

-

... More
Hard Bed @ Ch 2950m

11.93

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)

-

-

-

... More
Hard Bed @ Ch 2950m

11.93

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

-

-

-

... More
Hard Bed @ Ch 2950m

37.5

-

-

... More
Providing and fixing logo board

5

-

-

... More
Providing and fixing Citizen board

1

-

-

... More
Providing and fixing Maintenance information board

1

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and fixing 90 CM Equilateral Triangle Cautionary Sign board

16

-

-

... More
Providing and fixing 60 CM Circularl Madatory Sign board

1

-

-

... More
Providing and fixing Chevron Signs 90 CM Octagon (Curves)

20

-

-

... More
Providing and fixing Reflector

10

-

-

... More
Providing and fixing KM Stone

8

-

-

... More
Providing and fixing HM Stone

36

-

-

... More
Providing and fixing Guard stone

45

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1

-

-

... More
For the Second Year from the date of completion of work

1

-

-

... More
For the Third Year from the date of completion of work

1

-

-

... More
For the Fourth Year from the date of completion of work

1

-

-

... More
For the Fifth Year from the date of completion of work

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.