Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Jul 2024
Closing Date19 Jul 2024
Tender AmountRefer Documents
Costs
EMD
₹ 98,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tiruvarur District - Mgsmt (2024-25) Road Work - Thiruthuraipoondi Block - Package - 56
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_460354_1Bid Award Id
ViewTender No
DIPR.2074/TENDER /2024 DATED.26.06.2024 pack56.rTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
-
-
-
... More
Ch 0/0 - 2/710
2710
-
-
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
... More
Ch 0/0 - 2/710
376.5
-
-
... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
-
-
-
... More
Ch 0/0 - 1/0
59.83
-
-
... More
Ch 1/0 - 2/0
60
-
-
... More
Ch 2/0 - 2/7.1
42.28
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Ch 0/0 - 1/0
375.47
-
-
... More
Ch 1/0 - 2/0
375
-
-
... More
Ch 2/0 - 2/7.1
264.23
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
... More
Ch 0/0 - 2/710
8117.6
-
-
... More
Applying tack coat over WMM surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
-
-
-
... More
Ch 0/0 - 2/710
8117.6
-
-
... More
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Ch 0/0 - 2/710
202.94
-
-
... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint.
Rumble Strips = 3 X 5.50 X 0.25 = 4.125
5.62
-
-
... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
-
-
-
... More
Ch 0/0 - 2/710
542
-
-
... More
provision for km stone
2
-
-
... More
Provision for HM stone
11
-
-
... More
Provision for Name board & Citizen information Board
1
-
-
... More
Provision for sign Boards
4
-
-
... More
Provision for Octogon curves
1
-
-
... More
Construction of Pipe culvet culvert
-
-
-
... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
-
-
-
... More
km 0/0-1/0 at ch 336
22.26
-
-
... More
km 1/0-2/0 at 1535
22.26
-
-
... More
km 1/0-2/0 at 1730
22.26
-
-
... More
collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
-
-
-
... More
km 0/0-1/0 at ch 336
2.88
-
-
... More
km 1/0-2/0 at 1535
2.88
-
-
... More
km 1/0-2/0 at 1730
2.88
-
-
... More
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges
-
-
-
... More
km 0/0-1/0 at ch 336
3.83
-
-
... More
km 1/0-2/0 at 1535
3.83
-
-
... More
km 1/0-2/0 at 1730
3.83
-
-
... More
C.C. 1:3:6 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
-
-
-
... More
km 0/0-1/0 at ch 336
16.09
-
-
... More
km 1/0-2/0 at 1535
16.09
-
-
... More
km 1/0-2/0 at 1730
16.09
-
-
... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
-
-
-
... More
km 0/0-1/0 at ch 336
44.72
-
-
... More
km 1/0-2/0 at 1535
44.72
-
-
... More
km 1/0-2/0 at 1730
44.72
-
-
... More
providing and laying reinforced cement concert pipe np3 for culverts
-
-
-
... More
km 0/0-1/0 at ch 336
7.5
-
-
... More
km 1/0-2/0 at 1535
7.5
-
-
... More
km 1/0-2/0 at 1730
7.5
-
-
... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
-
-
-
... More
km 0/0-1/0 at ch 336
8.81
-
-
... More
km 1/0-2/0 at 1535
8.81
-
-
... More
km 1/0-2/0 at 1730
8.81
-
-
... More
Towards the charges for routline maintenance of the road work executed under MGSMT Scheme including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of completion of work
2.71
-
-
... More
For the Second Year from the date of cpmpletion of work
2.71
-
-
... More
For the Third Year from the date of completion of work
2.71
-
-
... More
For the Fourth Year from the date of completion of work
2.71
-
-
... More
For the Fifth Year from the date of completion of work
2.71
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements