Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Jun 2024
Closing Date12 Jul 2024
Tender Amount₹ 95,04,000
Costs
EMD
₹ 1,90,080Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_135003_1Bid Award Id
ViewTender No
DIPR/1942/Tender/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Km 1/0 - 2/0
179.48
-
-
... More
Km 2/0 - 3/0
180
-
-
... More
Km 3/0 - 4/0
180
-
-
... More
Km 4/0 - 4/500
89.39
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 25mm IRC size HBG metal
-
-
-
... More
Km 0/0 - 1/0
5.54
-
-
... More
Km 1/0 - 2/0
10.15
-
-
... More
Km 2/0 - 3/0
3.73
-
-
... More
Km 3/0 - 4/0
3.9
-
-
... More
Km 4/0 - 4/500
0.52
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 50mm IRC size HBG metal
-
-
-
... More
Km 2/0 - 3/0
1.04
-
-
... More
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat etc
16051.12
-
-
... More
Providing and laying Bituminous Concrete (BC) of 25 - 45 mm thick based on Job Mix Formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving CRMB 55 penetration grade3 (IS:73) and aggregates conforming to grading 2 of Table 500 - 5 of MORT & H specifications and BC shall be laid using sensor paver finisher to the required level, grade and compacting to atleast 98% of laboratory Marshall desnity as per clause 509 complete
401.26
-
-
... More
Road Marking-Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
856
-
-
... More
Providing and fixing reflective road studs of ‘category A’ Raised pavement markers made out of poly carbonate / methyl methercrylate /ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/ 10/ 97-DO.III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 +/ - 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/ - 2mm arid height not less than 30+/ - 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D428O and confirming to IRC 35 - 2015 guidelines and MORT&H specification 804 etc., complete
840
-
-
... More
Provision for Rumble Stirrups
4.69
-
-
... More
Providing HM Stone- Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC 8 fixing in position including painting and printing etc., as per technical specification clause 1703
18
-
-
... More
Providing KM Stone- Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC 8 fixing in position including painting and printing etc., as per technical specification clause 1703
4
-
-
... More
Provision for Mandatory Sign board
10
-
-
... More
Repainting for Citizen information Board cum Name Board
1
-
-
... More
Repainting for Name board
1
-
-
... More
Repainting for Sign Board
1
-
-
... More
Repaintig for Logo Board
1
-
-
... More
Maintenance Towards the charges for routline maintenance of the bridge work executed under PMGSY as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of completion of work
1
-
-
... More
For the Second Year from the date of cpmpletion of work
1
-
-
... More
For the Third Year from the date of completion of work
1
-
-
... More
For the Fourth Year from the date of completion of work
1
-
-
... More
For the Fifth Year from the date of completion of work
1
-
-
... More
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements