Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date21 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 1,66,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_516127_8Tender No
DIPR/5603/Tender/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
... More
Km 1/0-3/100
2615.75
-
-
... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms
-
-
-
... More
Km 1/0-3/100
501.53
-
-
... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 1/0-2/00
223.34
-
-
... More
Km 2/0-3/00
225
-
-
... More
Km 3/0-3/100
21.85
-
-
... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 1/0-2/00
558.34
-
-
... More
Km 2/0-3/00
562.5
-
-
... More
Km 3/0-3/100
54.62
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-3/100
7836.38
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-3/100
7875
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 1/0-2/00
93.75
-
-
... More
Km 2/0-3/00
93.75
-
-
... More
Km 3/0-3/100
9.38
-
-
... More
Construction of Toe wall
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
121.5
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
20.25
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
39.83
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
116.44
-
-
... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete
414.86
-
-
... More
Construction of Toe Retaining wall
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
93.6
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
15.6
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
15.6
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
148.34
-
-
... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete
464.07
-
-
... More
Construction of 6.00m span culvert @ ch 1470 m
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
99.48
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
6.63
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
6.63
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
-
-
-
... More
Abutment
64.82
-
-
... More
Wing
50.61
-
-
... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete
-
-
-
... More
Below Basement
74.99
-
-
... More
Above Basement
196.03
-
-
... More
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
-
-
-
... More
Bed block
4.26
-
-
... More
Deck Slab
24.48
-
-
... More
Supply and fabricating and placing in position MS steel of Ribbed T or steel for all Reinorced Cement Concrete works as per the design given incluing cost of steel and binding wire in all floors etc, Complete complying with standard specification.(MS rod or RTS bar will be supplied departmently at section stores and cost will be recovered at issue rate) the binding wire shall supplied by the contractor
3.21
-
-
... More
Supply and Fixing of Kraft Paper for full width of seting of Deck slab including all labour charges etc complete..
6
-
-
... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
12
-
-
... More
Supply and fixing of PVC or compressible fibre board expension joints in Between deck slab and Dird wall
7.2
-
-
... More
Construction of 1.5m span culvert @ ch 3090 m
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
109.62
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
4.87
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
4.87
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
-
-
-
... More
Abutment
33.53
-
-
... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
3.36
-
-
... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete
-
-
-
... More
Below Basement
135.59
-
-
... More
Above Basement
18.16
-
-
... More
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
28.2
-
-
... More
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
3.31
-
-
... More
Supply and fabricating and placing in position MS steel of Ribbed T or steel for all Reinorced Cement Concrete works as per the design given incluing cost of steel and binding wire in all floors etc, Complete complying with standard specification.(MS rod or RTS bar will be supplied departmently at section stores and cost will be recovered at issue rate) the binding wire shall supplied by the contractor
0.35
-
-
... More
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
6
-
-
... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
12
-
-
... More
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.
18
-
-
... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
420
-
-
... More
Providing and fixing of KM stones for standard specification
2
-
-
... More
Providing and fixing of HM stones for standard specification
8
-
-
... More
Providing and fixing of Sign board for standard specification
5
-
-
... More
Providing and fixing of Information board for standard specification
1
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under NABARD including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
2.1
-
-
... More
For the Second Year from the date of
completion of work
2.1
-
-
... More
For the Third Year from the date of
completion of work
2.1
-
-
... More
For the Fourth Year from the date of
completion of work
2.1
-
-
... More
For the Fifth Year from the date of
completion of work
2.1
-
-
... More
GST
-
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%