Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Soon10 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 2,15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_516127_3Tender No
DIPR/5603/Tender/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
km 0/0 -1/0
223.7
-
-
... More
km 1/0-2/0
223.7
-
-
... More
km 2/0-3/0
225
-
-
... More
km 3/0-3/15
33.75
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
km 0/0 -1/0
560.7
-
-
... More
km 1/0-2/0
557.61
-
-
... More
km 2/0-3/0
562.5
-
-
... More
km 3/0-3/15
84.38
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
... More
km 0/0 -3/150
11767.88
-
-
... More
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
-
-
-
... More
km 0/0 -3/150
11822.25
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
km 0/0 -1/0
93.99
-
-
... More
km 1/0-2/0
93.75
-
-
... More
km 2/0-3/0
93.75
-
-
... More
km 3/0-3/15
14.06
-
-
... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface Km 0/0-3/150
628.55
-
-
... More
60 cm Equilateral Traingle cautionary Sign board
10
-
-
... More
60 cm Circle Manadary Sign Board
5
-
-
... More
Cheron Sign 90cm Octagan (culvert)
4
-
-
... More
Reflector
30
-
-
... More
Hecta metre stone
12
-
-
... More
Kilo metre stone
3
-
-
... More
Providing for Name board Charges
1
-
-
... More
1.50M SPAN CULVERT @ Ch.5m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
109.62
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
4.87
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
-
-
-
... More
Below G.L
135.59
-
-
... More
Above G.L
18.16
-
-
... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
33.53
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
3.36
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
28.2
-
-
... More
RCC 1:1:5:3 mix using 20mm iss HbG Metal Including all the Labour Charge Etc Complet
3.31
-
-
... More
Supply and Fabrication charge for Steel including cost and Conveyenc all the labour charge
0.34
-
-
... More
Provision For Bitumen Pad
3.15
-
-
... More
Provision For Wheep Hole
12
-
-
... More
1.50M SPAN CULVERT @ Ch.460m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
109.62
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
4.87
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
-
-
-
... More
Below G.L
135.59
-
-
... More
Above G.L
18.16
-
-
... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
33.53
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
3.36
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
28.2
-
-
... More
RCC 1:1:5:3 mix using 20mm iss HbG Metal Including all the Labour Charge Etc Complet
3.31
-
-
... More
Supply and Fabrication charge for Steel including cost and Conveyenc all the labour charge
0.34
-
-
... More
Provision For Bitumen Pad
3.15
-
-
... More
Provision For Wheep Hole
12
-
-
... More
1.50M SPAN CULVERT @ Ch.1300m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
109.62
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
4.87
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
-
-
-
... More
Below G.L
135.59
-
-
... More
Above G.L
18.16
-
-
... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
33.53
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
3.36
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
28.2
-
-
... More
RCC 1:1:5:3 mix using 20mm iss HbG Metal Including all the Labour Charge Etc Complet
3.31
-
-
... More
Supply and Fabrication charge for Steel including cost and Conveyenc all the labour charge
0.34
-
-
... More
Provision For Bitumen Pad
12
-
-
... More
Provision For Wheep Hole
3.15
-
-
... More
1.50M SPAN CULVERT @ Ch.1375m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
109.62
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
4.87
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
-
-
-
... More
Below G.L
135.59
-
-
... More
Above G.L
18.16
-
-
... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
33.53
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
3.36
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
28.2
-
-
... More
RCC 1:1:5:3 mix using 20mm iss HbG Metal Including all the Labour Charge Etc Complet
3.31
-
-
... More
Supply and Fabrication charge for Steel including cost and Conveyenc all the labour charge
0.34
-
-
... More
Provision For Bitumen Pad
12
-
-
... More
Provision For Wheep Hole
3.15
-
-
... More
1.50M SPAN CULVERT @ Ch.1995m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
109.62
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
4.87
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
-
-
-
... More
Below G.L
135.59
-
-
... More
Above G.L
18.16
-
-
... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
33.53
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
3.36
-
-
... More
CC1:2:4 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
28.2
-
-
... More
RCC 1:1:5:3 mix using 20mm iss HbG Metal Including all the Labour Charge Etc Complet
3.31
-
-
... More
Supply and Fabrication charge for Steel including cost and Conveyenc all the labour charge
0.34
-
-
... More
Provision For Bitumen Pad
12
-
-
... More
Provision For Wheep Hole
3.15
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under NABARD including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
3.15
-
-
... More
For the Second Year from the date of
completion of work
3.15
-
-
... More
For the Third Year from the date of
completion of work
3.15
-
-
... More
For the Fourth Year from the date of
completion of work
3.15
-
-
... More
For the Fifth Year from the date of
completion of work
3.15
-
-
... More
GST
-
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%