Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date5 Nov 2024
Closing Date12 Nov 2024
Tender Amount₹ 6,84,000
Costs
EMD
₹ 6,840Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Salem Block - Sids 2024-25- Renovation Of The North Facing Rcc Building No.3 In Pums At Andipatty H/o Andipatty
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_498887_1Bid Award Id
ViewTender No
2199-2024-A2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
105.17
-
-
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
66.95
-
-
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
35.15
-
-
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
204.2
-
-
Distembering two coats with best approved oil bound distember including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labour charges
287.88
-
-
Painting two coats with approved Plastic Emulsion over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc.
353.21
-
-
Painting two coats over Old iron works using Synthetic enamel paint including cost and conveyance of paint and all labour charges etc complete
28.86
-
-
Provision for Bala painting ( for 2 class room)
1
-
-
Provision for Magnetic Green fiber Board
3
-
-
Provision for Chappal Rack(AS Per sub estimate)
-
-
-
Brick work in cement mortar 1:5 using country bricks of size 83/4"x41/4"x23/4" etc., complete
0.66
-
-
Supplying and fixing following thickness of cuddapah slab for cupboard
21.6
-
-
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
8.25
-
-
Provision for Construction of Rainwater Harvesting Structure(AS Per sub estimate)
-
-
-
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
6.04
-
-
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
0.28
-
-
Brick work in cement mortar 1:5 using country bricks of size 83/4"x41/4"x23/4" etc., complete
1
-
-
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
1.3
-
-
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
1.3
-
-
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
1.08
-
-
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
9.6
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements