Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Dec 2024
Closing Date27 Jan 2025
Tender Amount₹ 67,43,000
Costs
EMD
₹ 67,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514924_1Tender No
DIPR/5603/Tender/2024 dated.26.12.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Thanjavur District - NABARD RIDF XXX - 2024-25- Tender Notice.
BOQ Items
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
-
-
-
... More
KM 0/0-1/570
422.98
-
-
... More
Picking the existing B.T surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
-
-
-
... More
KM 0/0-1/570
1497.77
-
-
... More
Construction of Subgrade for 300 mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of deflict materials by using stone dust obtained from industries with all lifts and leads transporting to site, spreading and grading to required slope and compacted to meet requirement table 300.2 with lead upto 1000 m as per technical Specification clause 303.1.(Subgrade using Stone dust to improve CBR 7 to 9)
-
-
-
... More
KM 1/500-1/570
63
-
-
... More
Granular Sub-Base with Close Graded Material (Plant Mix Method) - Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
-
-
-
... More
KM 1/500-1/570
63
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
KM 0/0-1/0
299.33
-
-
... More
KM 1/0-1/570
181.5
-
-
... More
Providing and applying Prime coat over WMM surface using 7 Kg of bitumen emulsion SS-1 for 10sqm preparatory to another bituminous construction over it including cost of material, labour charges and all other incidental charges etc., .
-
-
-
... More
KM 0/0-1/0
2993.3
-
-
... More
KM 1/0-1/570
1710
-
-
... More
Providing and applying Tack coat over WMM surface (treated with primer) using 2.5 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
-
-
-
... More
KM 0/0-1/0
3003.5
-
-
... More
KM 1/0-1/570
1710
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING CMP (Grade-II) - Providing and laying Bituminous concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
-
-
-
... More
KM 0/0-1/0
90.11
-
-
... More
KM 1/0-1/570
51.3
-
-
... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
KM 0/0-1/0
59.8
-
-
... More
KM 1/0-1/570
34.2
-
-
... More
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
-
-
-
... More
KM 0/0-1/570
314
-
-
... More
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete.
1
-
-
... More
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
6
-
-
... More
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
1
-
-
... More
Construction of 2.00 m RCC slab culvert @ Chainage 326 m.
-
-
-
... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
49.27
-
-
... More
Supplying and Filling foundation and basement with filling M-sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with standard specification.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
4.48
-
-
... More
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
4.48
-
-
... More
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. For Founadtion.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
29.97
-
-
... More
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. For Superstructure
-
-
-
... More
RCC slab Culvert at Chainage 326 m
22.66
-
-
... More
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. For Bed block
-
-
-
... More
RCC slab Culvert at Chainage 326 m
3.54
-
-
... More
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. (Below Basement)
-
-
-
... More
RCC slab Culvert at Chainage 326 m
42.12
-
-
... More
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. (Above Basement)
-
-
-
... More
RCC slab Culvert at Chainage 326 m
95.19
-
-
... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
4.68
-
-
... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
0.48
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
-
-
-
... More
RCC slab Culvert at Chainage 326 m
15
-
-
... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
4.5
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
-
-
-
... More
RCC slab Culvert at Chainage 326 m
12
-
-
... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
-
-
-
... More
RCC slab Culvert at Chainage 326 m
5.54
-
-
... More
Towards the charges for routline maintenance of the road work executed under NABARD RIDF including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
-
-
-
... More
For the First Year from the date of completion of work
1.57
-
-
... More
For the Second Year from the date of completion of work
1.57
-
-
... More
For the Third Year from the date of completion of work
1.57
-
-
... More
For the Fourth Year from the date of completion of work
1.57
-
-
... More
For the Fifth Year from the date of completion of work
1.57
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
1
-
-