Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date23 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
Km 0/0-1/620

2025

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
Km 0/0-1/620

484.26

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-1/000

120

-

-

... More
Km 1/0-1/620

73.7

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm

-

-

-

... More
Km 0/0-1/000

285.93

-

-

... More
Km 1/0-1/620

172.74

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/620

6115.65

-

-

... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/620

6137.4

-

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/000

95.31

-

-

... More
Km 1/0-1/620

58.13

-

-

... More
Construction of 1.5m span culvert @ ch 1070m

-

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B

60.65

-

-

... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.

4.33

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

4.31

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

60.74

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

3.36

-

-

... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete

-

-

-

... More
Below Basement

115.79

-

-

... More
Above Basement

18.16

-

-

... More
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

3.31

-

-

... More
Supply and fabricating and placing in position MS steel of Ribbed T or steel for all Reinorced Cement Concrete works as per the design given incluing cost of steel and binding wire in all floors etc, Complete complying with standard specification.(MS rod or RTS bar will be supplied departmently at section stores and cost will be recovered at issue rate) the binding wire shall supplied by the contractor

0.32

-

-

... More
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..

4.5

-

-

... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification

12

-

-

... More
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.

22.2

-

-

... More
Construction of 1.5m span culvert @ ch 1250m

-

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B

60.65

-

-

... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.

4.33

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

4.31

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

60.74

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

3.36

-

-

... More
Supply and erecting centering for CC works including cost and conveyance of all materials to site etc..Complete

-

-

-

... More
Below Basement

115.79

-

-

... More
Above Basement

18.16

-

-

... More
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete

3.31

-

-

... More
Supply and fabricating and placing in position MS steel of Ribbed T or steel for all Reinorced Cement Concrete works as per the design given incluing cost of steel and binding wire in all floors etc, Complete complying with standard specification.(MS rod or RTS bar will be supplied departmently at section stores and cost will be recovered at issue rate) the binding wire shall supplied by the contractor

0.32

-

-

... More
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..

4.5

-

-

... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification

12

-

-

... More
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.

22.2

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

324

-

-

... More
Providing and fixing of KM stones for standard specification

1

-

-

... More
Providing and fixing of HM stones for standard specification

7

-

-

... More
Providing and fixing of Sign board for standard specification

6

-

-

... More
Providing and fixing of Information board for standard specification

1

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.62

-

-

... More
For the Second Year from the date of completion of work

1.62

-

-

... More
For the Third Year from the date of completion of work

1.62

-

-

... More
For the Fourth Year from the date of completion of work

1.62

-

-

... More
For the Fifth Year from the date of completion of work

1.62

-

-

... More
Part II : Renewal tyhe road from NH 49 to Vethalai (Via) Kuncharvalasai Km 0/0-1/620 (Using Plastic Waste)

-

-

-

... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,

-

-

-

... More
Km 0/0-1/620

874.8

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
Km 0/0-1/620

243

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-1/000

30

-

-

... More
Km 1/0-1/620

18.6

-

-

... More
Advance Patch work for making up the undulation in the existing BT surface to an average thickiness of 25mm using 13.20mm IRC size HBG Metal

-

-

-

... More
Km 0/0-1/000

5

-

-

... More
Km 1/0-1/620

2.9

-

-

... More
Applying TACK COAT over BT surface (Not Treated with Primer) using 3.0 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/620

6075

-

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) (Using Plastic Waste) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/000

93.75

-

-

... More
Km 1/0-1/620

58.13

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

324

-

-

... More
Providing and fixing of KM stones for standard specification

1

-

-

... More
Providing and fixing of HM stones for standard specification

7

-

-

... More
Providing and fixing of Sign board for standard specification

10

-

-

... More
Providing and fixing of Information board for standard specification

1

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.62

-

-

... More
For the Second Year from the date of completion of work

1.62

-

-

... More
For the Third Year from the date of completion of work

1.62

-

-

... More
For the Fourth Year from the date of completion of work

1.62

-

-

... More
For the Fifth Year from the date of completion of work

1.62

-

-

... More
Part III : Strengthening the road from Nh 49 to Velavankudiyiruppu (Via) Pattaniyappa dharga Km 0/0 - 0/930 (Using Plastic Waste)

-

-

-

... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,

-

-

-

... More
Km 0/0-0/930

502.2

-

-

... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
Km 0/0-0/930

1162.5

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
Km 0/0-0/930

139.5

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-0/930

55.8

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Km 0/0-0/930

46.88

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0-0/930

263.77

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm

-

-

-

... More
Km 0/0-0/930

263.77

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-0/930

3516.98

-

-

... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-0/930

3516.98

-

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) (Using Plastic waste) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-0/930

87.92

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

186

-

-

... More
Providing and fixing of HM stones for standard specification

4

-

-

... More
Providing and fixing of Sign board for standard specification

12

-

-

... More
Providing and fixing of Information board for standard specification

1

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

0.93

-

-

... More
For the Second Year from the date of completion of work

0.93

-

-

... More
For the Third Year from the date of completion of work

0.93

-

-

... More
For the Fourth Year from the date of completion of work

0.93

-

-

... More
For the Fifth Year from the date of completion of work

0.93

-

-

-

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.