Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-1/000

337.5

-

-

... More
Km 1/0-2/000

337.5

-

-

... More
Km 2/0-3/000

337.5

-

-

... More
Km 3/0-4/000

335.54

-

-

... More
Km 4/0-4/250

84.38

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete

-

-

-

... More
Km 0/0-4/250

2392.05

-

-

... More
Applying of prime coat over WMM surface at 7.00kg of ss-1 Bitumen Emulsion /10 s.q.m including labour for spraying , hire charges for bitumen sprayer etc. complete

-

-

-

... More
Km 0/0-4/250

15947

-

-

... More
Providing and laying Tack coat over the primed surface using 2.5kg (Rs-1) of bituminous emulsion for 10sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT &H specification

-

-

-

... More
Km 0/0-4/250

15968.75

-

-

... More
Bituminious concrete to 25mm thick using CMP Gr III Providing and laying Bituminious concrete to 25mm thick 0.13cum of 19.00-9.50mm.IRC size HBG metal and 0.17cum of 9.5-2.36 .IRC size HBG metal with 50.3kgs of VG30/VG40 Bituminous per heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller and all other tools and plants employed therefore etc., complete

-

-

-

... More
Km 0/0-4/250

399.22

-

-

... More
Road marking with Hot Applied Thermoplastic compound with reflectorising glass beads on Bituminous surface

-

-

-

... More
km 0/0 - 4/250

848.84

-

-

... More
1.50M SPAN CULVERT @ Ch.3600m

-

-

-

... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stilff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all

41.89

-

-

... More
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,

4.19

-

-

... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

120.18

-

-

... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

18.16

-

-

... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203

28.67

-

-

... More
R Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.

28.36

-

-

... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.

0.35

-

-

... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab

3.31

-

-

... More
Tar Paper for bearing Bed block & Deckslab

4.5

-

-

... More
Weapholes with 100mm dia AC pipe

12

-

-

... More
1.50M SPAN CULVERT @ Ch.3850m

-

-

-

... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stilff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all

41.89

-

-

... More
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,

4.19

-

-

... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

120.18

-

-

... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

18.16

-

-

... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203

28.67

-

-

... More
R Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.

28.36

-

-

... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.

0.35

-

-

... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab

3.31

-

-

... More
Tar Paper for bearing Bed block & Deckslab

4.5

-

-

... More
Weapholes with 100mm dia AC pipe

12

-

-

... More
Retainig WALL @Ch.1250-1347m

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

559

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

55.9

-

-

... More
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

55.9

-

-

... More
Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete.

-

-

-

... More
Above Sill - Below GL

688

-

-

... More
Above GL Retaining wall side portion

1120.6

-

-

... More
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

503.1

-

-

... More
KM Stone

4

-

-

... More
Hecta metre stone

17

-

-

... More
60 cm Equilateral Triangle Cautionary Sign Board

7

-

-

... More
Providing For Name Board cum Citizen Board

1

-

-

... More
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

4.25

-

-

... More
For the Second Year from the date of completion of work

4.25

-

-

... More
For the Third Year from the date of completion of work

4.25

-

-

... More
For the Fourth Year from the date of completion of work

4.25

-

-

... More
For the Fifth Year from the date of completion of work

4.25

-

-

-

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.