Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Excavation
Water Storage And Supply
Eprocure
Opening Date8 Jul 2022
Closing Date28 Jul 2022
Tender Amount₹ 1,00,16,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Surplus weir Inlet

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B

46.51

-

-

... More
Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.

3.99

-

-

... More
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete

66.37

-

-

... More
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)

45.12

-

-

... More
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)

90.08

-

-

... More
Plain Cement concrete 1:2::4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.

2.88

-

-

... More
Surplus weir Outlet

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B

46.51

-

-

... More
Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.

3.99

-

-

... More
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete

66.37

-

-

... More
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)

45.12

-

-

... More
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)

90.08

-

-

... More
Plain Cement concrete 1:2::4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.

2.88

-

-

... More
Construction of Retain Wall @Main Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

10.33

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

3.44

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

31.27

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

59.4

-

-

... More
Rejuvenation of mayandikovil oorani(Deepening of baby pond, lining wall, bathing Ghat) in Aligudi Panchayat

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

96

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

900

-

-

... More
Lead Channel

40

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

167.17

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

19.18

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

341.04

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

113.28

-

-

... More
Formation of Pillaiyarkovil new Oorani ( Baby pond, lining wall, Bathing Ghat) in Ayyanarkulampatti

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

300

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

2420

-

-

... More
Lead Channel

20

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

35.25

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

5.29

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

65.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

60.35

-

-

... More
Construction of Bathing ghat

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

109.62

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

19.18

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

377.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

129.72

-

-

... More
Formation of new oorani in Poramboku land in serakulam

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

2160

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

2000

-

-

... More
Lead Channel

40

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

155.75

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

16.03

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

295.22

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

102.31

-

-

... More
Construction of Bathing ghat

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

35.25

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

3.53

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

65.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

60.35

-

-

... More
Construction of Retaining Wall @Main Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

54.44

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

1.48

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

26.32

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

8.74

-

-

... More
Rejuvenation of Udayankulam oorani in V.Kovilpathu Deepening of baby pond, lining wall, bathing Ghat)

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

96

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

675

-

-

... More
Lead Channel

160

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

186.35

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

19.18

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

377.58

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

129.72

-

-

... More
Construction of Bathing ghat

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

41.55

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

6.87

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

96.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

71

-

-

... More
Rejuvenation of Sivankovil Oorani (Desilting , Lighting, Sitting Bench Arrangement ) in V.Kovilpathu

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

96

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

405

-

-

... More
Lead Channel

100

-

-

... More
Construction of Bathing ghat

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

35.25

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

5.29

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

65.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

60.35

-

-

... More
Construction of Retaining Wall @Main Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

4.41

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

1.1

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

21.7

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

7.46

-

-

... More
Sitting arrangement

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

0.54

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

0.54

-

-

... More
Pre Cast Slab using Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. - 50mm thick - for Sitting bench -(1.8 x 0.45 x 0.05m) including cost of steel etc. complete

16.2

-

-

... More
cost of granite tiles - (Sperfine polished with machine cut edges ) of size 2'0" x 1'0" or 1'0" x1'0" or 1'0" x 0'6", of 10mm thick - Ruby red, Raw silk etc.

8.1

-

-

... More
Providing Paver Block arrangement

-

-

-

... More
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B

3.2

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

3.2

-

-

... More
Centering charges for PCC works including all cost and conveyance all materials to site etc., complete.

60.8

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

13.98

-

-

... More
Collection and supply of10-12mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

9.6

-

-

... More
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.

192

-

-

... More
Street light Arrangements

-

-

-

... More
6mtr length Double Bracket pole with Base plate (250x250x6mm) 76.10mmOD x3.65mmThickx6000mm length

1

-

-

... More
Formation of Oorani (Deepening, baby pond, Bathing Ghat and lining wall) in Vallakulam Poromboku land in Vallakulam Panchayat

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

2160

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

2000

-

-

... More
Lead Channel

40

-

-

... More
Construction of Bathing ghate

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

31.73

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

3.53

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

58.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

58.91

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

155.75

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

16.03

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

295.22

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

102.31

-

-

... More
Construction of Retaining Wall @Main Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

54.73

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

1.58

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

9.3

-

-

... More
Formation of Oorani Baby pond, Bathing Ghat and lining wall in Thathankualm Poraboku land

-

-

-

... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m

2160

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.

2000

-

-

... More
Lead Channel

40

-

-

... More
Construction of Lining Wall @Baby Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

112.27

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

12.88

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

229.04

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

76.08

-

-

... More
Construction of Bathing ghat

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

35.25

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

3.45

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

65.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

60.35

-

-

... More
Construction of Retaining Wall @Main Pond

-

-

-

... More
Earthwork excavation for foundation in all clauses of soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel, hard rock not requiring blasting etc, complete, for foundation

56.93

-

-

... More
Cement concrete 1:4:8 mix, using 40mm ISS,HBG metal including cost and conveyance of materials and labour charges for laying, compacting, curing etc,complete,

1.73

-

-

... More
Supply and erection of centering for sides and soffits of concrete works including necessary supports and strutting for plane surfaces such as RCC slab, lintel, beam, column, sunshade etc, complete

34.1

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

11.72

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.