Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Eprocure
Opening Date16 May 2024
Closing DateCancelled
Tender Amount₹ 2,88,94,000 
Notes
Download

Costs

Summary

Tiruvarur District - Pmgsy Iii Batch- I 2023-24 Mannargudi Block Road Work Package No- Tn21 378

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km. 0/0 - 3/831

4093.97

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Km. 0/0 - 3/831

4034.14

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
Km. 0/0 - 3/831

3694.85

-

-

... More
Construction embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification (Carted Earth borrow bits)

-

-

-

... More
Km. 0/0 - 3/831

1919.02

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km 0/0-1/0

336.52

-

-

... More
Km 1/0-1/170

54.07

-

-

... More
Km 1/0-2/0

279.15

-

-

... More
Km 2/0-3/0

336.52

-

-

... More
Km 3/0-3/831

278.5

-

-

... More
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using fly ash obtained from industries with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using Fly Ash to improve CBR 7 to 9))

-

-

-

... More
Km 1/170-2/0

282.62

-

-

... More
Km 2/0-3/0

349.97

-

-

... More
3/0-3/831

278.21

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading III

-

-

-

... More
Km 1/170-2/0

117.76

-

-

... More
Km 2/0-3/0

145.82

-

-

... More
3/0-3/831

115.92

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)

-

-

-

... More
Km 0/0-1/0

292.78

-

-

... More
Km 1/0-1/170

48.58

-

-

... More
Km 1/170-2/0

238.14

-

-

... More
Km 2/0-3/0

289.4

-

-

... More
3/0-3/831

236.66

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)

-

-

-

... More
Km 0/0-1/0

292.78

-

-

... More
Km 1/0-1/170

48.58

-

-

... More
Km 1/170-2/0

238.14

-

-

... More
Km 2/0-3/0

289.4

-

-

... More
3/0-3/831

236.66

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km. 0/0 - 3/831

14741.04

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km. 0/0 - 3/831

14832.18

-

-

... More
Mix Seal Surfacing 25mm thick (Using Waste Plastic) Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
Km 0/0-1/0

3914.72

-

-

... More
Km 1/0-1/170

684.6

-

-

... More
Km 1/170-2/0

3186.1

-

-

... More
Km 2/0-3/0

3869.61

-

-

... More
3/0-3/831

3177.15

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801

-

-

-

... More
logo board

3

-

-

... More
sign board

42

-

-

... More
Circular board

2

-

-

... More
Octagonal board

1

-

-

... More
Citizen board

1

-

-

... More
Name board

1

-

-

... More
Maintanance board

1

-

-

... More
Provision for kilometre stones

3

-

-

... More
Provision for Hectametre stones

16

-

-

... More
Construction of 1.5 m RCC Slab culvert @ Ch.0.852, 1.793, 2.213, 3.325

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch.0.852

72.73

-

-

... More
Culvert @ Ch.1.793

72.73

-

-

... More
Culvert @ Ch.2.213

72.73

-

-

... More
Culvert @ Ch.3/325

72.73

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch.0.852

14.08

-

-

... More
Culvert @ Ch.1.793

14.08

-

-

... More
Culvert @ Ch.2.213

14.08

-

-

... More
Culvert @ Ch.3/325

14.08

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.0.852

9.38

-

-

... More
Culvert @ Ch.1.793

9.38

-

-

... More
Culvert @ Ch.2.213

9.38

-

-

... More
Culvert @ Ch.3/325

9.38

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.0.852 Below sill

29.93

-

-

... More
Culvert @ Ch.1.793 Below sill

29.93

-

-

... More
Culvert @ Ch.2.213 Below sill

29.93

-

-

... More
Culvert @ Ch.3/325 Below sill

29.93

-

-

... More
Culvert @ Ch.0.852 Above sill

33.93

-

-

... More
Culvert @ Ch.1.793 Above sill

33.93

-

-

... More
Culvert @ Ch.2.213 Above sill

33.93

-

-

... More
Culvert @ Ch.3/325 Above sill

33.93

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch.0.852

3.36

-

-

... More
Culvert @ Ch.1.793

3.36

-

-

... More
Culvert @ Ch.2.213

3.36

-

-

... More
Culvert @ Ch.3/325

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch.0.852

3.31

-

-

... More
Culvert @ Ch.1.793

3.31

-

-

... More
Culvert @ Ch.2.213

3.31

-

-

... More
Culvert @ Ch.3/325

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch.0.852

0.35

-

-

... More
Culvert @ Ch.1.793

0.35

-

-

... More
Culvert @ Ch.2.213

0.35

-

-

... More
Culvert @ Ch.3/325

0.35

-

-

... More
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
Culvert @ Ch.0.852

15

-

-

... More
Culvert @ Ch.1.793

15

-

-

... More
Culvert @ Ch.2.213

15

-

-

... More
Culvert @ Ch.3/325

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Culvert @ Ch.0.852

4.5

-

-

... More
Culvert @ Ch.1.793

4.5

-

-

... More
Culvert @ Ch.2.213

4.5

-

-

... More
Culvert @ Ch.3/325

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch.0.852

12

-

-

... More
Culvert @ Ch.1.793

12

-

-

... More
Culvert @ Ch.2.213

12

-

-

... More
Culvert @ Ch.3/325

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch.0.852

7.08

-

-

... More
Culvert @ Ch.1.793

7.08

-

-

... More
Culvert @ Ch.2.213

7.08

-

-

... More
Culvert @ Ch.3/325

7.08

-

-

... More
Construction of Pipe culvert @ Ch.0/225, 0/700

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

47.4

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

6.04

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

8.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

12.34

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

19.34

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

15

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Pipe Culvert @ Ch. 0/225, 0/700

17.62

-

-

... More
Construction of Pipe culvert @ Ch.2/261, 2/996

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

47.4

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

6.04

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

8.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

12.34

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

19.34

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

15

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Pipe Culvert @ Ch. 2/261, 2/996

17.62

-

-

... More
Construction of Pipe culvert @ Ch.3/200, 3/530

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

47.4

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

6.04

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

8.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

12.34

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

19.34

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry

-

-

-

... More
Ch.3/076

15

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Pipe Culvert @ Ch. 3/200, 3/530

17.62

-

-

... More
Construction of Protective work @ Km. 1/800 - 1/900 RHS

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

196

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

42

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

28

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

92.25

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

79.56

-

-

... More
Providing weepholes in brick masonry / stone masonry , plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(v) : 20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709,1024.3.7

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

100

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

-

-

-

... More
Protective works @ Km. 1/800 - 1/900 RHS

4.38

-

-

... More
Dismantling Existing CD works @ Ch Km. 1/793, 2/213, 3/325 , 0/852 , 0/225, 0/700,2/261, 2/996, 3/200,3/530

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Foundation Km. 1/793, 2/213, 3/325 , 0/852 , 0/225, 0/700,2/261, 2/996, 3/200,3/530

38.5

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Body wall,Parapet wall Concrete @ Km.1/793, 2/213, 3/325 , 0/852 , 0/225, 0/700,2/261, 2/996, 3/200,3/530

65.64

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete

-

-

-

... More
Deck slab @ Ch.1/793, 2/213, 3/325

6.6

-

-

... More
Dismantling, Clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs

-

-

-

... More
Body wall,Parapet wall Concrete @ Km. 0/852

1.5

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

3.83

-

-

... More
For the Second Year from the date of cpmpletion of work

3.83

-

-

... More
For the Third Year from the date of completion of work

3.83

-

-

... More
For the Fourth Year from the date of completion of work

3.83

-

-

... More
For the Fifth Year from the date of completion of work

3.83

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.