Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Eprocure
Opening Date18 Feb 2021
Closing Date23 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 0/0 - 0/500

225

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 0/500

45

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/500

112.5

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/500

112.5

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 0/500

1500

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 0/500

1500

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

118.22

-

-

... More
Retainingwall @ Ch-05m

114.21

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

9.85

-

-

... More
Retainingwall @ Ch-05m

14.28

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

9.85

-

-

... More
Retainingwall @ Ch-05m

14.28

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

89.18

-

-

... More
Retainingwall @ Ch-05m

157.04

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

192.54

-

-

... More
Retainingwall @ Ch-05m

384.68

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

25.67

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

0.85

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

10.26

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

3.72

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

15

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
3.00 M RCC slab Culvert @ Ch-10m

15

-

-

... More
Cost and supply of 63mm 4 KSC PVC pipe including all labour charges etc complete

-

-

-

... More
Retainingwall @ Ch-05m

70

-

-

... More
Cost and supply of Guard stone (0.23x0.23x0.90m) including all labour charges etc complete

-

-

-

... More
Retainingwall @ Ch-05m

35

-

-

... More
Filling with well gravel including cost and conveyance of all materials to site and all labour charges etc complete

-

-

-

... More
Retainingwall @ Ch-05m

84.6

-

-

... More
Provision for HM Stone

2

-

-

... More
Provision for Name board

1

-

-

... More
2.Upgradation of the road from Ayyanarkovil to T.C road Km 0/0 - 0/280 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

120

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 0/280

12.46

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/280

77.12

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/280

77.12

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 0/280

1050

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 0/280

1050

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

64.83

-

-

... More
Drainage @ Ch-50m

291.69

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6.08

-

-

... More
Drainage @ Ch-50m

48.62

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
Drainage @ Ch-50m

48.62

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

55.37

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

46.86

-

-

... More
Drainage @ Ch-50m

1111.2

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

101.68

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

0.35

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

3.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

2.52

-

-

... More
Drainage @ Ch-50m

127.79

-

-

... More
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance to site and all labour charges etc complete

-

-

-

... More
Drainage @ Ch-50m

208.35

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of all materials to site and all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

21.03

-

-

... More
Provision for Name board

1

-

-

... More
3.Upgradation of the road from Arungal Colony Mayanam road Km 0/0 - 0/993 in Arungal Panchayat Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

505.44

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

126.36

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Km 0/0 - 0/993

370.58

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 0/993

59.29

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/993

222.35

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/993

222.89

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 0/993

2979

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 0/993

2979

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

62.81

-

-

... More
Drainage @ Ch-50m

111.51

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6.08

-

-

... More
Drainage @ Ch-50m

24.78

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6.08

-

-

... More
Drainage @ Ch-50m

24.78

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

56.77

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

46.86

-

-

... More
Drainage @ Ch-50m

566.4

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

95.53

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

0.32

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

3.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

2.52

-

-

... More
Drainage @ Ch-50m

65.14

-

-

... More
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance to site and all labour charges etc complete

-

-

-

... More
Drainage @ Ch-50m

106.2

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of all materials to site and all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

21.03

-

-

... More
Provision for HM Stone

4

-

-

... More
Provision for Name board

1

-

-

... More
4.Upgradation of the road from Pappankulam Mayanam road Km 0/350 - 0/500 in Arungal Panchayat Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

180

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

40.5

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Km 0/350 - 0/500

67.5

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/350 - 0/500

13.5

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/350 - 0/500

33.75

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/350 - 0/500

33.75

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/350 - 0/500

450

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/350 - 0/500

450

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

72.94

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

72.94

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6.08

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

6.08

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

8.1

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

59.8

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

59.8

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

56.07

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

56.07

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

101.68

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

101.68

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

0.35

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

0.35

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

3.62

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

3.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

2.52

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

2.52

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

15

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

6

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

12

-

-

... More
1.50 M RCC slab Culvert @ Ch-120m

12

-

-

... More
Provision for Name board

1

-

-

... More
5.Upgradation of the road from Velipiringiyam Colony Mayanam road Km 0/0 - 0/710 in Pudupalayam Panchayat Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

552

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

186.3

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 0/710

63.64

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/710

158.44

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/710

158.44

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 0/710

2130

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 0/710

2130

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

72.94

-

-

... More
Drainage @ Ch-65m

48.51

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
Drainage @ Ch-65m

8.09

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
Drainage @ Ch-65m

8.09

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

55.37

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

46.86

-

-

... More
Drainage @ Ch-65m

184.8

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

101.68

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

0.32

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

3.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

2.52

-

-

... More
Drainage @ Ch-65m

21.25

-

-

... More
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance to site and all labour charges etc complete

-

-

-

... More
Drainage @ Ch-65m

34.65

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

12

-

-

... More
Provision for HM stone board

3

-

-

... More
Provision for Name board

1

-

-

... More
6.Upgradation of the road from Velipiringiyam BC Mayanam road Km 0/0 - 0/703 in Pudupalayam Panchayat Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

651.24

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

244.22

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 0/703

42.01

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/703

196.09

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 0/703

196.09

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 0/703

2636.25

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 0/703

2636.25

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

72.94

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

8.1

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

55.37

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

46.86

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

101.68

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

0.35

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

3.62

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

2.52

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

6

-

-

... More
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /rainforced concrete for abutment including cost and conveyance of all labour charges etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch-05m

12

-

-

... More
Provision for HM stone board

3

-

-

... More
Provision for Name board

1

-

-

... More
7.Upgradation of the road from Pudupalayam BC Mayanam road Km 0/300 - 0/815 in Pudupalayam Panchayat Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

680.4

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

255.15

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Km 0/300 - 0/815

153.18

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/300 - 0/815

45.95

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/300 - 0/815

114.89

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/300 - 0/815

114.89

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/300 - 0/815

1545

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/300 - 0/815

1545

-

-

... More
Provision for HM stone board

3

-

-

... More
Provision for Name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.