Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Eprocure
Opening Date6 Feb 2021
Closing Date17 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building III

4.77

-

5.8

... More
Building IV

3.42

-

5.8

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

-

-

-

... More
Building I

6.7

-

5.8

... More
Building II

7.47

-

5.8

... More
Building III

7.95

-

5.8

... More
Building IV

4.85

-

5.8

... More
Plastering with cement mortar 1:3 (One cement and Three sand) 10 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

3.42

-

229.04

... More
Building III

4.77

-

229.04

... More
Building IV

3.42

-

229.04

... More
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

6.7

-

200.89

... More
Building II

7.47

-

200.89

... More
Building III

7.95

-

200.89

... More
Building IV

4.85

-

200.89

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

111.55

-

26.03

... More
Building II

90.96

-

26.03

... More
Building III

164.23

-

26.03

... More
Building IV

115.72

-

26.03

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

80.73

-

154.93

... More
Building II

109.41

-

154.93

... More
Building III

248.09

-

154.93

... More
Building IV

154.83

-

154.93

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

-

-

-

... More
Building I

144.39

-

193.25

... More
Building II

118.69

-

193.25

... More
Building III

215.11

-

193.25

... More
Building IV

157.83

-

193.25

... More
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

-

-

-

... More
Building I

27.48

-

109.84

... More
Building II

26.52

-

109.84

... More
Building III

45.96

-

109.84

... More
Building IV

35.34

-

109.84

... More
Paiting two coats over Wall Black Board Using ready mixed enamel paint incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

37.85

-

74.21

... More
Building II

5.4

-

74.21

... More
Building IV

5.4

-

74.21

... More
Provision for Rain water Harvesting incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

1

-

1000

... More
Building I

1

-

1000

... More
Building III

1

-

1000

... More
Building IV

1

-

1000

... More
Provision for Repair Door and Window incuilding cost and Conveyance of paint and all labour charges etc complete

1

-

4000

... More
Provision for Name Board.

1

-

1000

... More
School Building Renovation I, II, & III,@ Kunnathoor in Vilathurai Village Panchayat

-

-

-

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Ceiling)

-

-

-

... More
Building I

3.42

-

5.8

... More
Building II

5.6

-

5.8

... More
Building III

8.1

-

5.8

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

-

-

-

... More
Building I

6.7

-

5.8

... More
Building II

4.95

-

5.8

... More
Building III

15.62

-

5.8

... More
Plastering with cement mortar 1:3 (One cement and Three sand) 10 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

3.42

-

228.42

... More
Building II

5.6

-

228.42

... More
Building III

8.1

-

228.42

... More
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

6.7

-

200.03

... More
Building II

4.95

-

200.03

... More
Building III

15.62

-

200.03

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

103.48

-

26.03

... More
Building II

73

-

26.03

... More
Building III

73

-

26.03

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

73.68

-

154.93

... More
Building II

87.36

-

154.93

... More
Building III

62.7

-

154.93

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

-

-

-

... More
Building I

112.28

-

193.25

... More
Building II

149.58

-

193.25

... More
Building III

151.84

-

193.25

... More
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

-

-

-

... More
Building I

25.68

-

109.84

... More
Building II

25.68

-

109.84

... More
Building III

25.68

-

109.84

... More
Paiting two coats over Wall Black Board Using ready mixed enamel paint incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

16.68

-

74.21

... More
Building II

3

-

74.21

... More
Building III

27.66

-

74.21

... More
Dismanteling One cout Presssed tiles Roof finish in Cement morter including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building III

66.25

-

17.4

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete.

-

-

-

... More
Building III

6.54

-

27.6

... More
Finishing the top of the roof with one course of Pressed Tiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement use

-

-

-

... More
Building III Pressed Tiles 60%

41.7

-

977.39

... More
Building III Pressed Tiles 40%

27.8

-

693.34

... More
Cement concrete 1:2:4 (one cement, Two M. M.Sand, and Four hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete

-

-

-

... More
Building III

0.33

-

5439.15

... More
Provision for Rain water Harvesting incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

1

-

1500

... More
Building I

1

-

1500

... More
Building III

1

-

1500

... More
Provision for Repair Door and Window incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

1

-

1500

... More
Building II

1

-

1500

... More
Provision for Name Board.

1

-

1000

... More
Renovation Govt. Primary School Akkavilai Building I, & II @ Adaikkakuzhi Village Panchayat.

-

-

-

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Ceiling)

-

-

-

... More
Building I

4.1

-

5.8

... More
Building III

3.42

-

5.8

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

-

-

-

... More
Building I

4.85

-

5.8

... More
Building II

8.76

-

5.8

... More
Plastering with cement mortar 1:3 (One cement and Three sand) 10 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

4.1

-

228.65

... More
Building II

3.42

-

228.65

... More
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Building I

4.85

-

200.35

... More
Building II

8.76

-

200.35

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

102

-

26.03

... More
Building II

78

-

26.03

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Building I

126.3

-

154.93

... More
Building II

120.02

-

154.93

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

-

-

-

... More
Building I

180.15

-

193.25

... More
Building II

157.62

-

193.25

... More
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

-

-

-

... More
Building I

24.12

-

109.84

... More
Building II

14.4

-

109.84

... More
Paiting two coats over Wall Black Board Using ready mixed enamel paint incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

15.12

-

74.21

... More
Building II

15.12

-

74.21

... More
Provision for Rain water Harvesting incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

1

-

1000

... More
Building I

1

-

1000

... More
Provision for Repair Door and Window incuilding cost and Conveyance of paint and all labour charges etc complete

-

-

-

... More
Building I

1

-

1000

... More
Building I

1

-

1000

... More
Provision for Name Board.

1

-

1000

... More
School Building Renovation Govt. Primary School Building Neerodi in Kollencode Town Panchayat in Munchirai Union.

-

-

-

... More
Removing and readjusting the mangalore tiled roofing including cost and conveyance of all materials to site and all labour charges etc cmplete

105.37

-

66.18

... More
Supply the Mangalore tiles class AA for Roofing including cost and conveyance of all materials to site and all labour charges etc cmplete

300

-

10.5

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

3.06

-

5.8

... More
Dismanteling the existing flooring by chipping roughening the Concrete surface including cost and conveyance of all materials to site and all labour charges etc cmplete

67.89

-

27.6

... More
Plastering with cement mortar 1:3 (One cement and Three sand) 10 mm thick in all floors including cost of scafolding, finishing, curing etc.

3.06

-

200.89

... More
Painting two coats over Old WOOD WORK using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete

23.64

-

125.82

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

75.11

-

142.2

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

126.08

-

193.25

... More
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

59.91

-

109.84

... More
Paiting two coats over Wall Black Board Using ready mixed enamel paint incuilding cost and Conveyance of paint and all labour charges etc complete

36.02

-

111.94

... More
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.

67.89

-

106.01

... More
Provision for Repair Door and Window incuilding cost and Conveyance of paint and all labour charges etc complete

1

-

1500

... More
Provision for Name Board.

1

-

1000

... More
Renovation of Kitchen shed in Govt. Middle School Akkavilai in Adaikkakuzhi village panchayat in Munchirai Union.

-

-

-

... More
Distmantling, Clearing away and carefully stacking materials useful for re use for Dismantling RCC etc Completed complying with standard specification.

2.18

-

5045

... More
Distmantling, materials useful for re use for any thickness of brick/ stone masonry in cement mortar walls under 3 m height Completed complying with standard specification.

1.4

-

193

... More
Distmantling, Doors and Window including cost and conveyance of all materials to site and all labour charges Completed complying with standard specification.

4.05

-

104.7

... More
Fabrication and supply and Delivery of mild steel Doors of the following sizes including cost and conveyance of all materials to site and all labour charges Completed complying with standard specification.

1

-

3020

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

22.05

-

27.6

... More
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.

22.05

-

105.98

... More
Fabrication and supply and Delivery of mild steel Window of the following sizes including cost and conveyance of all materials to site and all labour charges Completed complying with standard specification.

2

-

2740

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

25.57

-

26.03

... More
Brick work in cement Mortor 1:5 (One cement and live M.Sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement

2.09

-

5615.48

... More
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet etc., complete.

25.57

-

752

... More
Supplying, fabricating and placing in position M.S. or R.T.S. reinforcement grill for RCC works as per the design given including cost of steel and binding wire etc., complete complying with standard specification. (The contractor will have to make his own arrangements for the supply of M.S. plain rods / RTS rods and binding wire)

0.26

-

68782.5

... More
Reinforced Cement Concrete of mix 1:11/2:3 (One cement, one and half sand and three aggregate) with water proofing compound of 2% by weight of cement used and using 20mm size machine crushed granite stone jelly etc., complete.

3.02

-

7335.01

... More
Plastering with cement mortar 1:3 (One cement and Three sand) 10 mm thick in all floors including cost of scafolding, finishing, curing etc.

27.77

-

228.65

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

46.88

-

154.93

... More
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

18.29

-

200.35

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

58.97

-

193.25

... More
Painting two coats over New iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

8.1

-

117.2

... More
Labour charges for fixing steel Doors etc along with frames in compsition etc cmplete ( finished Work)

1.89

-

171.3

... More
Labour charges for fixing steel Window, and Ventilators etc along with frames in compsition etc cmplete ( finished Work)

2.16

-

215

... More
Provision for Name Board.

1

-

1000

... More
Renovation of Kitchen shed in Govt. Primary School Kollencode in Kollencode Town panchayat in Munchirai Union.

-

-

-

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

1.06

-

5.8

... More
Plastering with cement mortar 1:5 (One cement and five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

1.06

-

200.89

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

15

-

26.03

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

43.41

-

154.93

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

41.84

-

193.25

... More
Painting two coats over Old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

11.88

-

109.84

... More
Provision for Repair Door and Window incuilding cost and Conveyance of paint and all labour charges etc complete

1

-

1500

... More
Provision for Name Board.

1

-

1000

... More
School Building Renovation I, II, III, & IV @ Kollen code Town Panchayat

-

-

-

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Pointing )

-

-

-

... More
Gents toilet

2.45

-

5.8

... More
Chipping the existing damaged plastering surface including cost and conveyance of all materials to site and all labour charges etc cmplete ( Wall Patches)

-

-

-

... More
Gents toilet

4.85

-

5.8

... More
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

-

-

-

... More
Gents toilet

2.45

-

224.9

... More
Plastering with cement mortar 1:5 (One cement and Five sand) 12 mm thick in all floors including cost of scafolding, finishing, curing etc.

-

-

-

... More
Gents toilet

4.85

-

200.89

... More
Fabrication and supply and Delivery of mild steel Doors of the following sizes including cost and conveyance of all materials to site and all labour charges Completed complying with standard specification.

-

-

-

... More
Ladies toilet

4.05

-

1275

... More
Labour charges for fixing steel Doors etc along with frames in compsition etc cmplete ( finished Work)

-

-

-

... More
Ladies toilet

4.05

-

171.3

... More
White washing two coat with best approved shell lime including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Gents toilet

2.24

-

26.03

... More
Distmantling, Doors and Window including cost and conveyance of all materials to site and all labour charges Completed complying with standard specification.

-

-

-

... More
Ladies toilet

4.05

-

104.7

... More
Distembering two coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc cmplete

-

-

-

... More
Gents toilet

33.02

-

154.93

... More
Ladies toilet

23.96

-

154.93

... More
Plastic emulsion painting two coats using best plastic emulsion in all exposed faces including cost and conveyance etc complete

-

-

-

... More
Gents toilet

29.68

-

193.25

... More
Ladies toilet

31.51

-

193.25

... More
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

-

-

-

... More
Gents toilet

8.8

-

109.84

... More
Ladies toilet

3

-

109.84

... More
Painting two coats over New iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete complying with standard

-

-

-

... More
Ladies toilet

8.1

-

111.94

... More
Provision for Toilet cleaning Tiles and Closet incuilding cost and Conveyance of paint and all labour charges etc complete

1

-

2500

... More
Provision for Name Board.

1

-

1000

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

102278



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.