Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date24 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 18,42,000
Costs
EMD
₹ 18,420Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_465486_1Bid Award Id
ViewTender No
ILY-NABARD XXIX JJM - OHT 24-25 SALAIGRAMAMTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Second depth of 0.35m
13.12
-
-
Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers
8.75
-
-
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers.
4.37
-
-
RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing
-
-
-
Below 1.50m from GL
13.52
-
-
Upto GL
1.75
-
-
Above Gl and Upto 4.50m Height
2.83
-
-
Above 4.50m and upto 7.32m Ht from GL
2.23
-
-
Above 7.32m and upto 10.98m Ht from GL
2.53
-
-
From 10.98m upto 14.64m ht above GL
11.41
-
-
column 14.64m to 18.63m ht above G.L
3.1
-
-
Provinding steel centering using MS plates of size 90cmx60cm 13 grade to 10 grade thick welded with 25mmx25mmx3mm MS angles supported with country wood stantling of size 10cmx6.5cm at 90 cm C/C strutting with casurina props of 100m to 13cm dia as directed by Board Officers.
-
-
-
Square Column Below GL and upto 3.30m above GL
21.42
-
-
Ground level to 3.30 m
4.08
-
-
Columns above 4.30m upto 5.30m ht from GL
4.8
-
-
Columns above 5.30m upto 6.30m ht from GL
3.99
-
-
Columns above 6.30m upto 7.30m ht from GL
4.8
-
-
From 7.30m to 8.30m ht
4.8
-
-
Columns above 8.30m upto 9.30m ht from GL
3.99
-
-
Columns above 9.30m upto 10.30m ht from GL
4.8
-
-
Columns above 10.30m upto 10.90m ht from GL
4.8
-
-
From 11.30m to 12.30m ht above GL
0.72
-
-
Plane Surface
-
-
-
Below G.L and upto 3.30m ht above GL
20.41
-
-
From 3.30m to 4.30m ht above GL
25.91
-
-
From 5.30m . to 6.30m
11.91
-
-
From 8.31m . to 9.30m
11.91
-
-
From 11.30m to 12.30m ht above GL
40.02
-
-
Curved Surface
-
-
-
11.30m to 12.30m Height
2.48
-
-
12.30m to 13.30m
26.19
-
-
13.30m to 14.30m
26.19
-
-
14.30m to 15.30m
26.84
-
-
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by Board officers.
45.8
-
-
Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat including cost and conveyance of all materials to site and all labour charges etc complete
166.54
-
-
Provision for pipe connection arrangements for inlet outlet, scour and overflow etc., includeing cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below.
-
-
-
For Inlet and Outlet Arrangements
-
-
-
65mm GI pipes for inlet connection
18
-
-
65mm GI pipes for over flow & rain water harvesting pipe
16
-
-
50mm GI pipes for scour pipe
13
-
-
65mm GI pipe for delivery pipe
13
-
-
90mm PVC Threaded coupler
1
-
-
63mm PVC Threaded coupler
2
-
-
65mm dia GI Tee
2
-
-
65mm dia GI bend 90
5
-
-
65mm dia GI bend (short)
1
-
-
65mm GI coupler
5
-
-
65mm GI union
2
-
-
65mm GI Elbow
1
-
-
50mm GI union
2
-
-
50mm GI Elbow
1
-
-
65mm GI Tee
2
-
-
65x50mm GI reducer
1
-
-
75mmx63mm PVC reducer
2
-
-
65mm GM gate valve
2
-
-
50mm GM gate valve
1
-
-
63 mm PVC 4Ksc Pipe
6
-
-
Fabrication,supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6m MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint for providing access to roof top of 10,000 lit. capacity OHT of suitable inclined length, including bottom anchorage and 6transportation and as directed by Board officers.
1
-
-
Supply and delivery and fixing position of CI man hole cover and frame of Size 60x60cm on roof slab and as directed by the officers The manhole frame and cover should be of light duty and conforming to ISI 1726/1974
1
-
-
Refilling the Foundation for Service reservoir with excavated earth (other than sand) in layers of 15cm thick well rammed,watering and consoildating etc Complete complying with standard Specification as directed by the officers
90.33
-
-
Providing and fixing of RCC inner access ladder in RCC 1:1:5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm x 15cm and step slab of 25mm x25mm etc., complete and as directed by Board officers.
1
-
-
Providing Pumping Main Line
-
-
-
Supply,delivery, laying and jointing of 63mm6 KSC PVC pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
100
-
-
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.HARD SOIL
2.03
-
-
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
0.34
-
-
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
3.56
-
-
Supplying and erecting centering shuttering including necessary supports for plane
14.64
-
-
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.55
-
-
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.56
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}