Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date23 May 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,31,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_308346_27Bid Award Id
ViewTender No
ROC.No.R6/1332/2023Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
... More
Km 0/0-1/0
1247
-
-
... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms
-
-
-
... More
Km 0/0-1/0
359.14
-
-
... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0-1/0
119.71
-
-
... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
-
-
-
... More
Km 0/0-1/0
281.25
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 1/0-1/0
3750
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 1/0-1/0
3759
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-1/0
93.98
-
-
... More
Construction of Toe wall @ ch 0/190-0.242m & 0/310-0/368m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
44.55
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
9.9
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
14.85
-
-
... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
203.37
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
26.91
-
-
... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
200
-
-
... More
Providing and fixing of KM stones for standard specification
1
-
-
... More
Providing and fixing of HM stones for standard specification
4
-
-
... More
Providing and fixing of Sign board for standard specification
2
-
-
... More
Providing and fixing of Information board for standard specification
1
-
-
... More
Part II :Strengthening the road from Nainarkovil-P.Kodikulam road to Thavalaikulam road Km.0/0-1/825
-
-
-
... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
-
-
-
... More
Km 0/0-1/825
2190
-
-
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
... More
Km 0/0-1/825
2262.5
-
-
... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms
-
-
-
... More
Km 0/0-1/825
817.11
-
-
... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0-1/0
119.45
-
-
... More
Km 1/0-1/825
98.83
-
-
... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
-
-
-
... More
Km 0/0-1/0
280.01
-
-
... More
Km 1/0-1/825
232.57
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 1/0-1/0
3733.5
-
-
... More
Km 1/0-1/825
3100.88
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 1/0-1/0
3768
-
-
... More
Km 1/0-1/825
3111.75
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-1/0
94.2
-
-
... More
Km 1/0-1/825
77.79
-
-
... More
Construction of 3.00m span @ ch 8.00m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
94.57
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
7.88
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
7.88
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
83.43
-
-
... More
Cement Concrete 1:2:4 Using 20 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
3.9
-
-
... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
8.1
-
-
... More
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
-
-
-
... More
Below
151.16
-
-
... More
Above
40.7
-
-
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
8.1
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,
0.88
-
-
... More
Construction of 1.50m span @ ch 0/428m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
60.4
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
4.31
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
4.31
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
60.74
-
-
... More
Cement Concrete 1:2:4 Using 20 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
3.36
-
-
... More
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
-
-
-
... More
Below
115.79
-
-
... More
Above
18.16
-
-
... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
3.31
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.32
-
-
... More
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
4.5
-
-
... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
12
-
-
... More
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
22.2
-
-
... More
Construction of 1.50m span @ ch 0/780m
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
60.4
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
4.31
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
4.31
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
60.74
-
-
... More
Cement Concrete 1:2:4 Using 20 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
3.36
-
-
... More
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
-
-
-
... More
Below
115.79
-
-
... More
Above
18.16
-
-
... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
3.31
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
0.32
-
-
... More
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
4.5
-
-
... More
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
12
-
-
... More
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
22.2
-
-
... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
365
-
-
... More
Providing and fixing of KM stones for standard specification
1
-
-
... More
Providing and fixing of HM stones for standard specification
8
-
-
... More
Providing and fixing of Sign board for standard specification
2
-
-
... More
Providing and fixing of Information board for standard specification
1
-
-
... More
Maintance - Strengthening the road from Karadaranthakudi to Melakadaranthakudi road Km.0/0-1/0
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
1
-
-
... More
For the Second Year from the date of
completion of work
1
-
-
... More
For the Third Year from the date of
completion of work
1
-
-
... More
For the Fourth Year from the date of
completion of work
1
-
-
... More
For the Fifth Year from the date of
completion of work
1
-
-
... More
Maintance - Strengthening the road from Nainarkovil-P.Kodikulam road to Thavalaikulam road Km.0/0-1/825
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
1.83
-
-
... More
For the Second Year from the date of
completion of work
1.83
-
-
... More
For the Third Year from the date of
completion of work
1.83
-
-
... More
For the Fourth Year from the date of
completion of work
1.83
-
-
... More
For the Fifth Year from the date of
completion of work
1.83
-
-
... More
GST
-
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-