Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2024
Closing Soon10 Jan 2025
Tender Amount₹ 1,95,79,000 
Notes
Download

Costs

Summary

Karur District - Kadavur Block- Nabard - Ridf Xxx - 2024-2025 - Tn-07-36

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking 5cm to 10cm old metalled surface and sectioning - 1sqm

5154.89

-

-

... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS

771.65

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

1933.04

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.

15464.37

-

-

... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,

15518.75

-

-

... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

387.97

-

-

... More
Construction of 1.5m Culvert @ Ch. 3337m, 3775m & 4150m in the road from from Kondappanai kanur - Ponnaniyar Dam road

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5m Culvert @ Ch. 3337m

79.99

-

-

... More
1.5m Culvert @ Ch. 3775m

79.99

-

-

... More
1.5mCulvert @ Ch. 4150m

79.99

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 3337m

10.32

-

-

... More
1.5m Culvert @ Ch. 3775m

10.32

-

-

... More
1.5mCulvert @ Ch. 4150m

10.32

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5m Culvert @ Ch. 3337m

76.13

-

-

... More
1.5m Culvert @ Ch. 3775m

76.13

-

-

... More
1.5mCulvert @ Ch. 4150m

76.13

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface for concrete works

-

-

-

... More
Below Sill

-

-

-

... More
1.5m Culvert @ Ch. 3337m

72.68

-

-

... More
1.5m Culvert @ Ch. 3775m

72.68

-

-

... More
1.5mCulvert @ Ch. 4150m

72.68

-

-

... More
Above Sill

-

-

-

... More
1.5m Culvert @ Ch. 3337m

113.9

-

-

... More
1.5m Culvert @ Ch. 3775m

113.9

-

-

... More
1.5mCulvert @ Ch. 4150m

113.9

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Culvert @ Ch. 3337m

0.3

-

-

... More
1.5m Culvert @ Ch. 3775m

0.3

-

-

... More
1.5mCulvert @ Ch. 4150m

0.3

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 3337m

3.36

-

-

... More
1.5m Culvert @ Ch. 3775m

3.36

-

-

... More
1.5mCulvert @ Ch. 4150m

3.36

-

-

... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5m Culvert @ Ch. 3337m

3.31

-

-

... More
1.5m Culvert @ Ch. 3775m

3.31

-

-

... More
1.5mCulvert @ Ch. 4150m

3.31

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

826

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

120

-

-

... More
Name Board

1

-

-

... More
Sign Board -60Cm circle manditory

2

-

-

... More
Sign Board -90Cm Octagen Board

2

-

-

... More
Sign Board -60Cm Tirangle Board

4

-

-

... More
Km Stone

4

-

-

... More
HM Stone

13

-

-

... More
Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years.

-

-

-

... More
For 1st Year

4.2

-

-

... More
For 2nd Year

4.2

-

-

... More
For 3rd Year

4.2

-

-

... More
For 4th Year

4.2

-

-

... More
For 5th Year

4.2

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.