Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date7 Feb 2025
Closing Date14 Feb 2025
Tender Amount₹ 10,01,000
Costs
EMD
₹ 11,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_523612_1Tender No
Rocno_2119_2024_A6Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and filling of conveyed earth with a lead of 5Km for basement filling
2.93
-
-
... More
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
8.39
-
-
... More
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
20.44
-
-
... More
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
-
-
-
... More
Column,Grade Beam
18.34
-
-
... More
Lintel,Beam,Column,Roof Slab
87.62
-
-
... More
Sunshade
3.47
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
1.6
-
-
... More
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
13.65
-
-
... More
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.. complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work.
29.29
-
-
... More
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
6.34
-
-
... More
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
52
-
-
... More
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
2.34
-
-
... More
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
35.71
-
-
... More
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
201.97
-
-
... More
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
119.29
-
-
... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
114.96
-
-
... More
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
20.45
-
-
... More
Supply of Steel door of size 0.90m x 2.10m with standard specification including all charges etc complete.
2
-
-
... More
Supply of Steel window of size 1.20m x 1.30m with standard specification including all charges etc complete.
4
-
-
... More
Supply of Steel ventilator of size 0.90m x 0.45m with standard specification including all charges etc complete.
1
-
-
... More
Supplying and fixing following thickness of cuddapah slab for cupboard 25mm thick
9.67
-
-
... More
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
4.15
-
-
... More
Towards Fixing of steel door along with frames in position including cost and conveyace of allmaterials to site complete
3.78
-
-
... More
Towards Fixing of steel windows & ventilators in position including cost and conveyace of allmaterials to site complete
6.65
-
-
... More
Electrical Arrangements
-
-
-
... More
Light & Fan Point SD.no.20
8
-
-
... More
Supply&Fixing of Tube Light SD.no.88
3
-
-
... More
CFL SD.no.80
3
-
-
... More
BHF with CFL SD.no.83
1
-
-
... More
Plug Point SD.no.36
5
-
-
... More
Power Plug Point SD.no.39
2
-
-
... More
S & Fixing DP Main swetch SD.no.142
1
-
-
... More
S & FixingTNEB Meter board SD.no.125
1
-
-
... More
Service pipe SD.no.73
3
-
-
... More
Service Connection SD.no.68
15
-
-
... More
Service Charge to EB
1
-
-
... More
exhaust fan SD114 (including holes)
1
-
-
... More
Provision of Water Supply arangment
-
-
-
... More
1000 Ltr Tank
1000
-
-
... More
50mm PVC Pipe
30
-
-
... More
50mm PVC Bend
10
-
-
... More
25mm PVC Pipe
20
-
-
... More
25mm PVC Elbow
7
-
-
... More
25mm PVC Tee
3
-
-
... More
Brass chromium plated screw down tap 15/12mm
4
-
-
... More
Provision towards construction of Rain water structure
-
-
-
... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
1.7
-
-
... More
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charges.
0.34
-
-
... More
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
0.31
-
-
... More
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.40mm Metal
1.02
-
-
... More
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.20mm Metal
0.34
-
-
... More
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
1.56
-
-
... More
Provisions for supply and fixing of precast RCC cover slab including cost and conveyance of materials and all labour charges
1
-
-
... More
Provision towards charges for writing name board
1
-
-
... More
Provision for Photography Charges
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements