Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2024
Closing Date23 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 99,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514280_1Tender No
54951/2023/RB1.2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in Soil using Hydralic Excavator and Tippers with disposal upto 1000m for roadwork in soil and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Tecnical Specification Clause 302.3
-
-
-
... More
KM 0/0-1/000
65.9
-
-
... More
KM 0/0-1/950
23.12
-
-
... More
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth )
-
-
-
... More
KM 0/0-1/000
632.88
-
-
... More
KM 0/0-1/950
196.3
-
-
... More
Gravel Shoulder Collectiona and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
KM 0/0-1/000
554.35
-
-
... More
KM 0/0-1/950
188.44
-
-
... More
WET MIX MECADAM Providing and laying spreading and compacting graded stone aggregate to wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges
-
-
-
... More
KM 0/0-1/000
581.67
-
-
... More
KM 0/0-1/950
209.65
-
-
... More
PRIMER COAT Applying PRIMECOAT over WMB/WMB surface at 7.00kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying hire charges for bitumen sprayer etc., complete
-
-
-
... More
KM 0/0-1/000
3877.79
-
-
... More
KM 0/0-1/950
1397.68
-
-
... More
TACK COAT Applying TACK COAT over Primed WMM surface at 2.5kg of Rs-1 Bitumen Emulsion / 10sq.m including labour for spraying hire charfes for bitumen sprayer etc., complete
-
-
-
... More
KM 0/0-1/000
3932.16
-
-
... More
KM 0/0-1/950
1397.68
-
-
... More
Bituminous Concrete Providing and laying bituminious concrete to 40mm thick using 0.13 cum of 19.00-9.50mm. 0.17 cum of 9.5-2.36 and below with 50.3kgs of BG30/BG40 heating the bitumen and aggregates to required temperature and mixing then in required temperature in central hot mix plant 20-30 ton capacity,carrying the mix by tipper trucks to paver site ,spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tons vibratery / phenumatic
-
-
-
... More
KM 0/0-1/000
98.31
-
-
... More
KM 0/0-1/950
34.94
-
-
... More
Provision for Name Board
1
-
-
... More
Road Marking with hot applied thermoplastic compound with Reflectorising Glass Beads on Bituminous Surface KM 0/000-6/450S
267
-
-
... More
Providing and Fixing of Cautionary, mandatory And Informatory sign Board Providing and fixing of Retro Reflectorisedn Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09, Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm X 25mm X 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm X 6mmfirmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm X 45cm X 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec No.801)
-
-
-
... More
Provision for K.M. stone
2
-
-
... More
Provision for H.M. stone
8
-
-
... More
Provision for Guard. stone
20
-
-
... More
90CM Equilateral triangale Cautionary Signboard
5
-
-
... More
Provision for 60 cm Circle(MANDATORY SIGN)
2
-
-
... More
Provision for Chevron
3
-
-
... More
Provision for Road Marker/ Road stud with lens Reflector
24
-
-
... More
Provision for Photo
1
-
-
... More
Construction of 1.50m Span Culvert at Ch. 270
-
-
-
... More
Earth work excavation for foundation soil as per SS 20 B for foundation.
90.63
-
-
... More
Filling with M.sand including including all labour charges for filling etc complete.
7.77
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
10.36
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
85.24
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
71.82
-
-
... More
Above sill
94.27
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
15
-
-
... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
4.5
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
12
-
-
... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
8.78
-
-
... More
Construction of 1.50m Span Culvert at Ch. 525
-
-
-
... More
Earth work excavation for foundation soil as per SS 20 B for foundation.
90.63
-
-
... More
Filling with M.sand including including all labour charges for filling etc complete.
7.77
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
10.36
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
85.24
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
71.82
-
-
... More
Above sill
94.27
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
15
-
-
... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
4.5
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
12
-
-
... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
8.78
-
-
... More
Construction of 1.50m Span Culvert at Ch. 840
-
-
-
... More
Earth work excavation for foundation soil as per SS 20 B for foundation.
90.63
-
-
... More
Filling with M.sand including including all labour charges for filling etc complete.
7.77
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
10.36
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
85.24
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
71.82
-
-
... More
Above sill
94.27
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
15
-
-
... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
4.5
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
12
-
-
... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
8.78
-
-
... More
Construction of 1.50m Span Culvert at Ch. 875
-
-
-
... More
Earth work excavation for foundation soil as per SS 20 B for foundation.
90.63
-
-
... More
Filling with M.sand including including all labour charges for filling etc complete.
7.77
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
10.36
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
85.24
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
71.82
-
-
... More
Above sill
94.27
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
15
-
-
... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
4.5
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
12
-
-
... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
8.78
-
-
... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
-
-
-
... More
For the First Year from the date of completion of work
1.34
-
-
... More
For the Second Year from the date of cpmpletion of work
1.34
-
-
... More
For the Third Year from the date of completion of work
1.34
-
-
... More
For the Fourth Year from the date of completion of work
1.34
-
-
... More
For the Fifth Year from the date of completion of work
1.34
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%