Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jul 2024
Closing Date12 Jul 2024
Tender Amount₹ 79,12,878
Costs
EMD
₹ 81,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_459831_1Bid Award Id
ViewTender No
DIPR/2074/TENDER/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
KM 1/000 - 1/700
187.38
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete KM 0/000 - 1/700
794.7
-
-
... More
Providing and laying PRIME COAT using slow setting emulsion bitumen Grade I at the rate of 7kg/10sqm over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/700
6357.62
-
-
... More
Providing and laying TACK COAT over WMM surface (treated with primer) using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., KM 0/000 - 1/700
6390.25
-
-
... More
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 1/700
159.76
-
-
... More
Providing and erecting single sided Double Guard Metal Beam Crash Barrier System 1.70m High, Comprising of 3mm thick wall "w" beams posts and spacer channels shall be made by cold roll forming using HR Conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm. minimum 950mm above road ground level fixed on ISMC series channel to center 312mm x 83mm flange width x 3mm thick 4318mm long post directly embedded in the concrete (M15) pit size 350 x 350 x 800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming ti IS: 1367 clause 4.60 all Complete as per Technical Specification and as directed by the Engineer in charges
80
-
-
... More
Provision for HM Stone charges etc complete
7
-
-
... More
Provision for KM Stone charges etc complete
1
-
-
... More
Provision for sign board 60cm Triangle Cautionary Board
4
-
-
... More
Road Marking with Hot Applied thermoplastic compound with reflectorising Glass beeds on bituminous surface providing and laying of hot applied thermoplastic compound 2.5mm thick including reflecctorising Glass beeds at 250gms per sqm area ,thickness of 2.50mm is exclusive of surface applied glass beeds as per IRC 35 . The finished surface to level uniform and free from streeks and holes extra complete as per MORTH specification no 803.KM 0/0-1/700
340
-
-
... More
Construction of 1.50M RCC slab Culvert @ Ch 250m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
41.89
-
-
... More
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
4.19
-
-
... More
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
28.67
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Superstructure
25
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Bed Block
3.36
-
-
... More
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
3.31
-
-
... More
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
42
-
-
... More
Above Sill level
96.34
-
-
... More
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
0.35
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck Slab
3
-
-
... More
Providing and fixing Tar Paper for bearing between Bed Block and Deck slab
4.5
-
-
... More
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
12
-
-
... More
Filling the Well gravel including cost and conveyance of materials to worksote etc complete.
6.14
-
-
... More
Construction of 1.50M RCC slab Culvert @ Ch 660m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
41.89
-
-
... More
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
4.19
-
-
... More
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
28.67
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Superstructure
25
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Bed Block
3.36
-
-
... More
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
3.31
-
-
... More
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
42
-
-
... More
Above Sill level
96.34
-
-
... More
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
0.35
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck Slab
3
-
-
... More
Providing and fixing Tar Paper for bearing between Bed Block and Deck slab
4.5
-
-
... More
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
12
-
-
... More
Filling the Well gravel including cost and conveyance of materials to worksote etc complete.
6.14
-
-
... More
Construction of 1.50M RCC slab Culvert @ Ch 1690m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
41.89
-
-
... More
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
4.19
-
-
... More
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
28.67
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Superstructure
25
-
-
... More
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Bed Block
3.36
-
-
... More
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
3.31
-
-
... More
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
42
-
-
... More
Above Sill level
96.34
-
-
... More
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
0.35
-
-
... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck Slab
3
-
-
... More
Providing and fixing Tar Paper for bearing between Bed Block and Deck slab
4.5
-
-
... More
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
12
-
-
... More
Filling the Well gravel including cost and conveyance of materials to worksote etc complete.
6.14
-
-
... More
Provision for Name Board Cum Citizen Board
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements