Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Nov 2022
Closing Date28 Nov 2022
Tender AmountRefer Documents
Costs
EMD
₹ 14,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Vellore District Improvements To Agaram
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_266050_1Bid Award Id
ViewTender No
A8/2565/2021Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
EEarth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
6762.6
-
-
Provision for Civil Work ( SUB ESTIMATE)
-
-
-
Earthwork excavation in all classes of soil and hard rock requiring blasting with initial lead and lift including all labour charges etc complete
63.47
-
-
Filling with river sand including all charges
22.45
-
-
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
17.18
-
-
Supplying and erecting centering shuttering including necessary supports for planeBroken Granite surface in foundation and basement and in all floors for R C C column footing laying, watering column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
164.69
-
-
Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
78.44
-
-
Plain Cement Concrete 1:2:4 ( One Cement Two sand and Four Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
4.5
-
-
Provision for Reverment Work ( SUB ESTIMATE)
-
-
-
Earth work excavation for foundation in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel, stoney earth and earth mixed with 50% fair sized boulders and hard gravelly soil inclusive of shoring, strutting and baling out water wherever necessary including refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and an initial lift of 2m and clearing and levelling the site etc., complete complying with standard specifications. sized boulders and hard gravelly soil inclusive of shoring, strutting and baling out water wherever necessary including refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and an initial lift of 2m and clearing and levelling the site etc., complete complying with standard specifications.
16.65
-
-
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if
3.33
-
-
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel
33.3
-
-
Cement concrete in 1:3:6 mix using ( one cement three sand and six aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication for etc Complete
14.01
-
-
Gravel backing for revetments including cost and Convenyance for all charges etc Complete
13.32
-
-
Rough Stone dry packing for revertement and aproan using including all Cost and Convenyance for etc Complete
20.42
-
-
Provision of Information Nameboard Charges
1
-
-
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-