Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Aug 2024
Closing Date30 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 18,420Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_477098_1Bid Award Id
ViewTender No
2079/2024/B1Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and filling with Good Quality M.sand including Cost and conveyance, labour charges etc, Complete.
8.75
-
-
... More
C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete.
4.37
-
-
... More
Cement concrete ( M 30 ) mix using 10mm & 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
-
-
-
... More
a) Below 1.5m from GL column Footing
13.52
-
-
... More
a) For raft below GL ( 0 m to 1.50 m) below GL
1.75
-
-
... More
a) For raft below GL ( 1.50- 4.50 ) below GL
2.83
-
-
... More
a) For raft below GL ( 4.50- 7.32 m ) below GL
2.23
-
-
... More
a) For raft below GL ( 7.32 m to 10.98 m ) above GL
2.53
-
-
... More
a)For raft below GL ( 10.98 m to 14.64 m ) above GL
11.41
-
-
... More
a)For raft below GL ( 14.64 m to 18.30 m ) above GL
3.09
-
-
... More
Supplying and and erection of steel centering using mild steel sheets including Cost and conveyance, labour charges etc, Complete.,
-
-
-
... More
a. Below GL
19.94
-
-
... More
b. From GL to 3.30 m
25.92
-
-
... More
c. From 5.30 m to 6.30 m Above GL
11.91
-
-
... More
d. From 8.30 m to 9.30 m above GL
11.91
-
-
... More
From 11.30 m to 12.30 m above GL
40.04
-
-
... More
SQUARE COLUMN II
-
-
-
... More
Square column Below GL and upto 3.30 m Above GL
21.42
-
-
... More
3.31 m to 4.30 m ht
4.08
-
-
... More
For coloumn 4.31m to 5.30 m
4.8
-
-
... More
For coloumn 5.31 m to 6.30 m
3.99
-
-
... More
For coloumn 6.31 m to 7.30 m
4.8
-
-
... More
For coloumn 7.31 m to 8.30 m
4.8
-
-
... More
For coloumn 8.31m to 9.30 m
3.99
-
-
... More
For coloumn 9.31 m to 10.30 m
4.8
-
-
... More
For coloumn 10.31 m to 11.30 m
4.8
-
-
... More
For coloumn 11.31m to 12.30 m
0.72
-
-
... More
curved surface -upto 3.30 m ht
-
-
-
... More
For coloumn 11.30 m to 12.30 m
2.48
-
-
... More
For coloumn 12.30 m to 13.30 m
26.2
-
-
... More
For coloumn 13.30 m to 14.30 m
26.2
-
-
... More
For coloumn 14.30 m to 15.30 m
26.86
-
-
... More
Steel - supply , fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming reinfore=ced concrete works etc
45.8
-
-
... More
Exterior Emulsion two coats of approved colour with two coats of including rubbing and labour charges etc.
166.57
-
-
... More
fabrication , supply delivery and fixing of outside MS ladder of 45 cm wide 50*50*6mm MS Angle for side stepsin 16 mm MS plain rods fixed at 30 mm c/c weltwd and joined etc.
1
-
-
... More
providing and fixing of RCC ccess ladder in RCC 1:1.5:3 mix using 20 mm HBG metal including cost and conveyance etc.
1
-
-
... More
Providing and PVC ventilating arrangement , mosquito proof nylon net with 110 mm PVC pipes and cowl etc complete .
2
-
-
... More
Providing cut stone of size 0.30*0.30m*0.15 m Cm 1:3 service reservoir as directed by TWAD board Officer
1
-
-
... More
Providing manhole cover of size 0.60*0.60m in RCC 1:1.5: 3 mix with suitable reinforcement and 50*50*6 mm MS along edges etc . Complte
1
-
-
... More
65 mm dia GI pipes for tank connection
18
-
-
... More
65mm dia GI pipe for over floe & rain water harvesting pipe
16
-
-
... More
50 mm diaGI pipe scour pipe
13
-
-
... More
65 mm GI pipe for delivery pipe
13
-
-
... More
90 mm PVC threaded coupler
1
-
-
... More
63 mm PVC threaded coupler
2
-
-
... More
63 mm dia GI Tee
2
-
-
... More
65 mm dia GI bend
5
-
-
... More
55 mm dia gi bend (Short )
1
-
-
... More
55 mm dia Gi coupler
5
-
-
... More
50 mm dia Gi Union
2
-
-
... More
50 mm GI elbow
1
-
-
... More
65 mm Gi Tee
2
-
-
... More
65 *50 mm GI reducer
1
-
-
... More
75 mm GI Tee
2
-
-
... More
GI Reducer
1
-
-
... More
75 mm *63 mm PVC Reducer
2
-
-
... More
65 mm GM gate valve
2
-
-
... More
50 mm GM gate valve
1
-
-
... More
63 mm PVC 4ksc pipe
6
-
-
... More
63 mm PVC 4ksc pipe
43.54
-
-
... More
Pump Room
-
-
-
... More
Earth work excavation for Foundation as per SS 20 B etc. complete
6.55
-
-
... More
Sand filling with good river sand including cost and conveyance etc., complete
1.01
-
-
... More
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance etc., complete
0.92
-
-
... More
Providing gronolithic pattern flooring in CC 1:2:4 MIX using 10-12mm chips of 20mm thick including all charges ect
2.25
-
-
... More
Re filling with good river sand including cost and conveyance etc., complete
0.39
-
-
... More
Brick work in cm 1:5 mix using normal country Bricks including cost and conveyance etc., complete
-
-
-
... More
Below Basement
3.84
-
-
... More
Above Basement
3.42
-
-
... More
Reinforced in cement concrete 1:1.5:3 mix using 20mm HBG metal including cost and conveyance etc., complete
0.75
-
-
... More
Supplying & Erecting centering for sides & soffits including necessary supports & strtting upto 3.29m height for Plane Surfaces in all floors with all cross bracings using mild steel dheets of size 25x25x3 for lintel, beam and slab etc.,complete
5.88
-
-
... More
Plastering in cm 1:3 mix using 10mm thick including cost and conveyance etc., complete
36.11
-
-
... More
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance etc., complete
4.42
-
-
... More
Supply and Fabrication of steelincluding cost and conveyance etc., complete
0.06
-
-
... More
Steel Door size 1.00*2.10
1
-
-
... More
Rcc Jolly 0.60m *0.45 m
1
-
-
... More
White washing two coats using lime including cost and conveyance etc,.
4.42
-
-
... More
Exterier Emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
34.9
-
-
... More
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
4.2
-
-
... More
Distribution main -63mm
-
-
-
... More
Distribution main -63mm laying and jointing of PVC /GI Pipes
1
-
-
... More
GI Pipe connection arrangements charges
1
-
-
... More
Provision for water meter
1
-
-
... More
Provision for chlorinator
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements