Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Excavation
Eprocure
Opening Date2 Jul 2024
Closing Date18 Jul 2024
Tender Amount₹ 1,55,74,079 This is an estimated amount, exact amount may vary.
Costs
EMD
0Document Cost
₹ 1,59,000Tender Fee
Refer Documents
Summary
Strengthening Of 2 Roads At Vedaranyam Block- Package No-11
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_459000_1Bid Award Id
ViewTender No
MGSMT-Ngt/2024-25/NGT/Pkg-11Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.inPackage Tenders
MGSMT-Ngt/2024-25/NGT/Pkg-04MGSMT-Ngt/2024-25/NGT/Pkg-03MGSMT-Ngt/2024-25/NGT/Pkg-07...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
in Km. 0/0 - 1/200
119.71
-
-
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
-
-
-
in Km. 0/0 - 1/200
1197.1
-
-
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
in Km. 0/0 - 1/0
299.88
-
-
in Km. 1/0 - 1/200
60
-
-
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
in Km. 0/0 - 1/200
3598.8
-
-
Providing and laying Tack coat over BT surface using 2.5Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
-
-
-
in Km. 0/0 - 1/200
3607.5
-
-
Providing and laying 50mm Consolidated Thickness Bituminious Macadam to 0.20cum for 26.50-13.20mm, 0.43 cum of 13.20-2.35mm and 0.80cum of 2.36mm and below sizeIRC Metalwith 37kgs of VG30/VG40 heating the bitumen for premixing per 10 sq.mte including cost and conveyance of all materials to CMP site. heating the bitumen and agreegate to required and mixing them ,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification .
-
-
-
in Km. 0/0 - 1/0
150.38
-
-
in Km. 1/0 - 1/200
30
-
-
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
in Km. 0/0 - 1/0
75.19
-
-
in Km. 1/0 - 1/200
15
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
in Km. 0/0 - 1/0
74.89
-
-
in Km. 1/0 - 1/200
15
-
-
Providing and Laying Thermoplastic Road Marking Painting Line Including Materials and Labouur Charges Etc., Complete
-
-
-
in Km. 1/0 - 1/200
240
-
-
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
5
-
-
Provision for Kilometer Stones Size 1.65m x 0.45m x 0.15m
1
-
-
Provision for Sign Board
7
-
-
Provision for Name board
1
-
-
Construction of 1.5m RCC Slab Culvert @ Ch. 525 Senbagarayanallur Rice Mill to School salai
-
-
-
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
-
-
-
Culvert @ Ch. 525
81.43
-
-
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
-
-
-
Culvert @ Ch.
10.51
-
-
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
-
-
-
Culvert @ Ch. 525
38.37
-
-
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
-
-
-
Culvert @ Ch. 525
27.7
-
-
Plain Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works @
-
-
-
Culvert @ Ch. 525
3.36
-
-
Reinforced Cement Concrete 1:1 1/2:3 mix using graded ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for concrete for deck slab concrete @ C.D. works
-
-
-
Culvert @ Ch. 525
3.31
-
-
Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km
-
-
-
Culvert @ Ch. 525
0.35
-
-
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
-
-
-
Culvert @ Ch. 525
142
-
-
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Centering
-
-
-
Culvert @ Ch. 525
12.13
-
-
Providing and Fixixng 6mm Bitumen felt for expansion Joint Dirt wall & Deck Slab
15
-
-
Providing and Fixixng of Tar Papper for for bearing between bed block & Deck Slab
4.5
-
-
Providing weepholes in palin cement concrete abubment wing wall return wall with 100 mm dia AC pipe extending through the full width of structure with slope
12
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
-
-
-
Culvert @ Ch. 525
8
-
-
02. Strengthenning of Maruthur South Vasathikulam to Pillaiyiar kovil Salai Km 0/0-2/100 at Vedaranyam Block
-
-
-
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
-
-
-
in Km. 0/0 - 2/100
2835
-
-
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
in Km. 0/0 - 2/100
472.5
-
-
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
-
-
-
in Km. 0/0 - 2/100
2625
-
-
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
in Km. 0/0 - 1/0
563.35
-
-
in Km. 1/0 - 2/0
562.5
-
-
in Km. 2/0 - 2/100
56.25
-
-
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
in Km. 0/0 - 2/100
7880.63
-
-
Providing and laying Tack coat over BT surface using 2.5Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
-
-
-
in Km. 0/0 - 2/100
7880.63
-
-
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
in Km. 0/0 - 1/0
93.89
-
-
in Km. 1/0 - 2/0
93.75
-
-
in Km. 2/0 - 2/100
9.38
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
in Km. 0/0 - 1/0
225
-
-
in Km. 1/0 - 2/0
225
-
-
in Km. 2/0 - 2/100
22.5
-
-
Providing and Laying Thermoplastic Road Marking Painting Line Including Materials and Labouur Charges Etc., Complete
-
-
-
in Km. 0/0 - 2/100
420
-
-
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
8
-
-
Provision for Kilometer Stones Size 1.65m x 0.45m x 0.15m
2
-
-
Provision for Sign Board
10
-
-
Provision for Name board
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements