Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Dec 2024
Closing Soon21 Jan 2025
Tender Amount₹ 1,40,51,000
Costs
EMD
₹ 1,41,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_515210_1Tender No
PDKT/DRDA/NABARD/27Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
1083
-
-
... More
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
7220
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
7220
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
180.5
-
-
... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
-
-
-
... More
KM 0/0-1/0
45
-
-
... More
KM 1/0-2/0
45
-
-
... More
KM 2/0-2/100
18
-
-
... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
480
-
-
... More
Provision for Hecta metre stone
10
-
-
... More
Provision for Kilo metre stone
2
-
-
... More
Provision for 60 cm Equilateral triangle cautionary
4
-
-
... More
Providing and fixing Name board Cum Citizen Board
1
-
-
... More
Contruction of single row pipe culvert @ Ch-5
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Contruction of single row pipe culvert @ Ch-110
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Contruction of single row pipe culvert @ Ch-150
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Contruction of single row pipe culvert @ Ch-240
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Contruction of single row pipe culvert @ Ch-540
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Contruction of single row pipe culvert @ Ch-1000
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
27.1
-
-
... More
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
1.44
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
3.58
-
-
... More
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
53.35
-
-
... More
Provision for 0.900M pipe NP3
7.5
-
-
... More
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
6.86
-
-
... More
Retaining wall 567m - 667m and 680m-770m
-
-
-
... More
Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil,hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
205.2
-
-
... More
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete
25.65
-
-
... More
PCC 1:4:8 mix using 40mm ISS metal including all labour charges for mixing, laying and curing etc complete
51.3
-
-
... More
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
864.5
-
-
... More
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
359.1
-
-
... More
Retaining wall 1900m -1930m
-
-
-
... More
Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil,hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
32.4
-
-
... More
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete
4.05
-
-
... More
PCC 1:4:8 mix using 40mm ISS metal including all labour charges for mixing, laying and curing etc complete
8.1
-
-
... More
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
136.5
-
-
... More
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
56.7
-
-
... More
Maintenance of the road
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
2.4
-
-
... More
For the Second Year from the date of
completion of work
2.4
-
-
... More
For the Third Year from the date of
completion of work
2.4
-
-
... More
For the Fourth Year from the date of
completion of work
2.4
-
-
... More
For the Fifth Year from the date of
completion of work
2.4
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%