Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Construction Material
Eprocure
Opening Date27 Jul 2024
Closing Date13 Aug 2024
Tender Amount₹ 4,59,83,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KM 0/000 - 8/560 & KM 9/960 - 10/960

11906.63

-

-

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
KM 0/000 - 1/000

110.01

-

-

... More
KM 1/000 - 2/000

96.8

-

-

... More
KM 2/000 - 3/000

108.32

-

-

... More
KM 3/000 - 4/000

117.95

-

-

... More
KM 4/000 - 5/000

89.84

-

-

... More
KM 5/000 - 6/000

90.5

-

-

... More
KM 6/000 - 7/000

101.74

-

-

... More
KM 7/000 - 8/000

114.41

-

-

... More
KM 8/000 - 8/560

56.04

-

-

... More
KM 9/960 - 10/000

130.76

-

-

... More
KM 10/000 - 10/960

118.44

-

-

... More
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
KM 0/000 - 1/000

110.01

-

-

... More
KM 1/000 - 2/000

96.8

-

-

... More
KM 2/000 - 3/000

108.32

-

-

... More
KM 3/000 - 4/000

117.95

-

-

... More
KM 4/000 - 5/000

89.84

-

-

... More
KM 5/000 - 6/000

90.5

-

-

... More
KM 6/000 - 7/000

101.74

-

-

... More
KM 7/000 - 8/000

114.41

-

-

... More
KM 8/000 - 8/560

56.04

-

-

... More
KM 9/960 - 10/000

130.76

-

-

... More
KM 10/000 - 10/960

118.44

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth)

-

-

-

... More
KM 0/000 - 1/000

320.61

-

-

... More
KM 1/000 - 2/000

239.55

-

-

... More
KM 2/000 - 3/000

241.99

-

-

... More
KM 3/000 - 4/000

183.55

-

-

... More
KM 4/000 - 5/000

200.57

-

-

... More
KM 5/000 - 6/000

107.51

-

-

... More
KM 6/000 - 7/000

207.21

-

-

... More
KM 7/000 - 8/000

230.93

-

-

... More
KM 8/000 - 8/560

133.83

-

-

... More
KM 9/960 - 10/000

260.7

-

-

... More
KM 10/000 - 10/960

154.79

-

-

... More
Gravel Shoulder Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
KM 0/000 - 1/000

562.5

-

-

... More
KM 1/000 - 2/000

558.96

-

-

... More
KM 2/000 - 3/000

559.24

-

-

... More
KM 3/000 - 4/000

558.67

-

-

... More
KM 4/000 - 5/000

556.88

-

-

... More
KM 5/000 - 6/000

562.5

-

-

... More
KM 6/000 - 7/000

560.87

-

-

... More
KM 7/000 - 8/000

562.5

-

-

... More
KM 8/000 - 8/560

315

-

-

... More
KM 9/960 - 10/000

22.5

-

-

... More
KM 10/000 - 10/960

538.37

-

-

... More
WATER BOUND MACADAM - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.(Grading II)

-

-

-

... More
KM 0/000 - 0/100

36.56

-

-

... More
WATER BOUND MACADAM - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Grading III)

-

-

-

... More
KM 0/000 - 0/100

36.56

-

-

... More
PRIMER COAT Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
KM 0/000 - 0/100

487.5

-

-

... More
Construction of Stablized Gravel /aggregate Sub - Base & Base Grading B Construction of Sub base & Base by way of using blended material comprising of 60% Available soil of CBR 5; 40% GSB Material, Grade B; 3% Cement by weight of soil; 1kg of Terrasil or Equivalent per cum & 1kg of Zycobond or Equivalent per cum ; Mechanically blended using a Rotavator at Optimum Moisture Content; laid in Two layers of Equivalent Depth each and duly compacted with Static Roller Including Maintaining the Camber as per specifications. Complete job , finished work to be measured. (ref : MORD sl.no4.11-(i) page no.4-20)

-

-

-

... More
KM 0/100 - 1/000

349

-

-

... More
KM 1/000 - 2/000

383.42

-

-

... More
KM 2/000 - 3/000

387.16

-

-

... More
KM 3/000 - 4/000

382.86

-

-

... More
KM 4/000 - 5/000

376.68

-

-

... More
KM 5/000 - 6/000

375

-

-

... More
KM 6/000 - 7/000

383

-

-

... More
KM 7/000 - 8/000

382.35

-

-

... More
KM 8/000 - 8/560

215.34

-

-

... More
KM 9/960 - 10/000

15

-

-

... More
KM 10/000 - 10/960

377.47

-

-

... More
Prime Coat (High porosity) Providing and applying primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (?1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.

-

-

-

... More
KM 0/100 - 1/000

3489.98

-

-

... More
KM 1/000 - 2/000

3834.16

-

-

... More
KM 2/000 - 3/000

3871.65

-

-

... More
KM 3/000 - 4/000

3828.64

-

-

... More
KM 4/000 - 5/000

3766.8

-

-

... More
KM 5/000 - 6/000

3750

-

-

... More
KM 6/000 - 7/000

3830.03

-

-

... More
KM 7/000 - 8/000

3823.5

-

-

... More
KM 8/000 - 8/560

2153.4

-

-

... More
KM 9/960 - 10/000

150

-

-

... More
KM 10/000 - 10/960

3774.69

-

-

... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503

-

-

-

... More
KM 0/000 - 1/000

3977.48

-

-

... More
KM 1/000 - 2/000

3857.79

-

-

... More
KM 2/000 - 3/000

3893.4

-

-

... More
KM 3/000 - 4/000

3854.14

-

-

... More
KM 4/000 - 5/000

3766.8

-

-

... More
KM 5/000 - 6/000

3750

-

-

... More
KM 6/000 - 7/000

3840.9

-

-

... More
KM 7/000 - 8/000

3823.5

-

-

... More
KM 8/000 - 8/560

2153.4

-

-

... More
KM 9/960 - 10/000

150

-

-

... More
KM 10/000 - 10/960

3785.56

-

-

... More
Mix Seal Surface 25mm thick using Waste Plastic Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
KM 0/100 - 1/000

3977.48

-

-

... More
KM 1/000 - 2/000

3857.79

-

-

... More
KM 2/000 - 3/000

3893.4

-

-

... More
KM 3/000 - 4/000

3854.14

-

-

... More
KM 4/000 - 5/000

3766.8

-

-

... More
KM 5/000 - 6/000

3750

-

-

... More
KM 6/000 - 7/000

3840.9

-

-

... More
KM 7/000 - 8/000

3823.5

-

-

... More
KM 8/000 - 8/560

2153.4

-

-

... More
KM 9/960 - 10/000

150

-

-

... More
KM 10/000 - 10/960

3785.56

-

-

... More
ZYDEX WATERPROOFING (SHOULDER) Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job

-

-

-

... More
KM 0/100 - 1/000

3375

-

-

... More
KM 1/000 - 2/000

3726.38

-

-

... More
KM 2/000 - 3/000

3728.25

-

-

... More
KM 3/000 - 4/000

3724.5

-

-

... More
KM 4/000 - 5/000

3712.5

-

-

... More
KM 5/000 - 6/000

3750

-

-

... More
KM 6/000 - 7/000

3739.13

-

-

... More
KM 7/000 - 8/000

3750

-

-

... More
KM 8/000 - 8/560

2100

-

-

... More
KM 9/960 - 10/000

150

-

-

... More
KM 10/000 - 10/960

3514.13

-

-

... More
Provision of Rumble strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
KM 0/000 - 1/000

5.62

-

-

... More
KM 1/000 - 2/000

5.62

-

-

... More
KM 2/000 - 3/000

5.62

-

-

... More
KM 3/000 - 4/000

5.62

-

-

... More
KM 4/000 - 5/000

5.62

-

-

... More
KM 5/000 - 6/000

5.62

-

-

... More
KM 6/000 - 7/000

5.62

-

-

... More
KM 7/000 - 8/000

5.62

-

-

... More
KM 8/000 - 8/560

5.62

-

-

... More
KM 9/960 - 10/000

2.81

-

-

... More
KM 10/000 - 10/960

5.62

-

-

... More
Providing and fixing Name board

2

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

7

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

2

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

2

-

-

... More
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801)

-

-

-

... More
60 Cm Equilateral triangle (Cautionary) sign Board

50

-

-

... More
60 Cm Circular (Mandatory) sign Board

27

-

-

... More
Chevron Signs 90 cm

10

-

-

... More
Reflector

52

-

-

... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface

-

-

-

... More
KM 0/000 - 8/560 & KM 9/960 - 10/960

1912

-

-

... More
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
(ii) Ordinary Kilometer Stone (Precast)

10

-

-

... More
(iii) 200 m stone (precast)

38

-

-

... More
(iv) Guard Stone(precast)

175

-

-

... More
Construction of 1 Row Pipe Culvert at Ch. 8

-

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

19.55

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

3.26

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

5.94

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

6

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

13.77

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.65

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

7.5

-

-

... More
Construction of 2 m Span RCC Slab Culvert At Chainage : 1737

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.74

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.37

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.37

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.27

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.82

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.54

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

4.68

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.48

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert At Chainage : 264

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert At Chainage : 2794

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 2 m Span RCC Slab Culvert At Chainage : 3574

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.74

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.37

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.37

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.27

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.82

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.54

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

4.68

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.48

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1 Row Pipe Culvert at Ch. 3889

-

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

19.55

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

3.26

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

5.94

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

6

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

13.77

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.65

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

7.5

-

-

... More
Construction of 1 Row Pipe Culvert at Ch. 4095

-

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

19.55

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

3.26

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

5.94

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

6

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

13.77

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.65

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

7.5

-

-

... More
Construction of 1 Row Pipe Culvert at Ch. 4225

-

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

19.55

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

3.26

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

5.94

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)

6

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)

13.77

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.65

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

7.5

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert At Chainage : 6329

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert At Chainage : 10940

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Maintenance of the road

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

9.56

-

-

... More
For the Second Year from the date of completion of work

9.56

-

-

... More
For the Third Year from the date of completion of work

9.56

-

-

... More
For the Fourth Year from the date of completion of work

9.56

-

-

... More
For the Fifth Year from the date of completion of work

9.56

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.