Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date31 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 1,62,82,000
Costs
EMD
₹ 1,62,820Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514956_24Tender No
DIPR/5603/TENDER/2024 Dt 26.12.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking the existing old metal for the B.T. surface and sectioning the undulations and all compacting charges etc., complete
3359
-
-
... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
39.38
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 1
-
-
-
... More
0/0 - 1/0 km
382.79
-
-
... More
1/0 - 2/0 km
468.75
-
-
... More
2/0 - 3/0 km
292.97
-
-
... More
3/0 - 3/150 km
71.07
-
-
... More
Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
0/0 - 1/0 km
144.47
-
-
... More
1/0 - 2/0 km
180
-
-
... More
2/0 - 3/0 km
112.5
-
-
... More
3/0 - 3/150 km
26.39
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
9672
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
9697.5
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5
242.45
-
-
... More
Providing and fixing of KM stones for standard specification
3
-
-
... More
Providing and fixing of HM stones for standard specification
12
-
-
... More
Provision for Road Marker Road / Stud with lens Reflector
15
-
-
... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
516.2
-
-
... More
Provision for Caution Board
14
-
-
... More
Constrution of CC Pavement ch 92 m to 200m R/S
-
-
-
... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
28.55
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
84.11
-
-
... More
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
126.9
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
121.5
-
-
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base,
19.04
-
-
... More
Provision for Retaining wall AT Ch92m
-
-
-
... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
123.75
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
22.5
-
-
... More
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
360
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
158.63
-
-
... More
Construction of deck slab culvert 2.00mspan @ CH 830 M
-
-
-
... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
94.57
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
10.51
-
-
... More
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
148.95
-
-
... More
Above GL
29.44
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
82.69
-
-
... More
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
3.54
-
-
... More
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
0.48
-
-
... More
RCC 1:11/2:3 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
4.68
-
-
... More
Constrution of Retaining wall ch 1148 m to 1198 m
-
-
-
... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
89.87
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
14.62
-
-
... More
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
283.8
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
149.32
-
-
... More
Constrution of Retaining wall ch 1210 m to 1240 m
-
-
-
... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
62.7
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
10.2
-
-
... More
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
198
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
104.18
-
-
... More
Provision for Name Board
1
-
-
... More
Part-B:- Maintenance work
-
-
-
... More
Maintenance Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of completion of work
1
-
-
... More
For the Second Year from the date of cpmpletion of work
1
-
-
... More
For the Third Year from the date of completion of work
1
-
-
... More
For the Fourth Year from the date of completion of work
1
-
-
... More
For the Fifth Year from the date of completion of work
1
-
-
... More
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements