Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date29 Jan 2025
Closing Date4 Feb 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

lockUnlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

lockUnlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Promotion Banner

BOQ Items

... More
DO_NOT_SHOW

-

-

-

lockView all details for FREE
... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/700

612

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

240

-

-

... More
KM 1/0-1/700

168

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/700

956.25

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/700

6375

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/700

6375

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/700

318.75

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/700

159.5

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/700

340

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

7

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

68

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

24

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

8

-

-

... More
Strengthening and Black Topping Road of Alagapuri Edayapatti Road KM 0/0-1/000 ( R- 26 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/000

720

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
KM 0/0-1/000

1250

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/000

360

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

360

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/000

562.5

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/000

3750

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/000

3750

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/000

187.5

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/000

150.2

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/000

200

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

66

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

10

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

5

-

-

... More
Strengthening and Black Topping Road of Muduvarpatti Irattaikulam to salvarpatti Road KM 0/0-1/545 ( R- 196 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/545

1112.4

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/545

556.2

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

360

-

-

... More
KM 1/0-1/545

196.2

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/545

869.06

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/545

5793.75

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/545

5793.75

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/545

289.69

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/545

231.95

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/545

309

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

6

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

8

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

3

-

-

... More
Strengthening and Black Topping Road of Muduvarpatti PH to Saranthangi Kiluvamalai Road KM 0/0-1/550 ( R- 197 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/550

1116

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/550

558

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

550

-

-

... More
KM 1/0-1/550

302.5

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/550

871.88

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/550

5812.5

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/550

5812.5

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/550

290.63

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/550

232.7

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/550

310

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

6

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

20

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

4

-

-

... More
Strengthening and Black Topping Road of Kumaram Thandalai Road KM 0/0-1/600 ( R- 17 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/600

1152

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
KM 0/0-1/600

2000

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/600

576

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

300

-

-

... More
KM 1/0-1/600

180

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/600

900

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/600

6000

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/600

6000

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/600

300

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/600

180.16

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/600

320

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

7

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

70

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

16

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

8

-

-

... More
Strengthening and Black Topping Road of Muduvarpatti to Salvarpatti Road KM 0/0-2/500 ( R- 48 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-2/500

1656

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-2/500

828

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

90

-

-

... More
KM 1/0-2/00

90

-

-

... More
KM 2/0-2/500

45

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal

-

-

-

... More
KM 0/0-1/0

2.74

-

-

... More
KM 1/0-2/0

3.56

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-2/500

8625

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-2/500

8625

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-2/500

431.25

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-2/500

258.91

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-2/500

460

-

-

... More
Supply and fixing of KM stone SI No. 44 A

2

-

-

... More
Supply and fixing of HM stone SI No. 44 A

10

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

18

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

7

-

-

... More
Strengthening and Black Topping Road of Kolinjipatti to Ramagoundanpatti Road KM 0/0-2/100 ( R- 59 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-2/100

1512

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-2/100

756

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

360

-

-

... More
KM 1/0-2/00

360

-

-

... More
KM 2/0-2/100

36

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
KM 0/0-1/0

12.7

-

-

... More
KM 1/0-2/0

7.19

-

-

... More
KM 2/0-3/0

6

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-2/100

56.25

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-2/100

7875

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-2/100

7875

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-2/100

393.75

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-2/100

236.41

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-2/100

420

-

-

... More
Supply and fixing of KM stone SI No. 44 A

2

-

-

... More
Supply and fixing of HM stone SI No. 44 A

8

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

30

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

20

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

7

-

-

... More
Strengthening and Black Topping Road of Kolinjipatti Gengamuthur Road KM 0/0-0/850 ( R- 97 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-0/850

612

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-0/850

306

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-0/850

306

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-0/850

478.13

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-0/850

3187.5

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-0/850

3187.5

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-0/850

159.38

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-0/850

127.7

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-0/850

170

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

15

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

12

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

4

-

-

... More
Strengthening and Black Topping Road of Palamedu road to Kolinjipatti Road KM 0/0-1/000 ( R- 164 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/000

720

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/000

360

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

500

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal

-

-

-

... More
KM 0/0-1/0

2.98

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/000

11.25

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/000

3750

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/000

3750

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/000

187.5

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/000

112.66

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/000

200

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

20

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

5

-

-

... More
Strengthening and Black Topping Road of Rajakkalpatti Usilampatti Road KM 0/0-1/530 ( R- 70 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/530

1101.6

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
KM 0/0-1/530

1912.5

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/530

550.8

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

550

-

-

... More
KM 1/0-1/530

291.5

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/530

860.63

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/530

5737.5

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/530

5737.5

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/530

286.88

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/530

229.7

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/530

306

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

6

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

16

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

6

-

-

... More
Strengthening and Black Topping Road of kodangipatti Parali road to kannati malai Road KM 0/0-0/900 ( R- 182 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-0/900

648

-

-

... More
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

-

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-0/900

324

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-0/900

405

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-0/900

506.25

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-0/900

3375

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-0/900

3375

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-0/900

168.75

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-0/900

135.2

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-0/900

180

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
Metal beam crash Barrier Type - A "W" Double guard

23

-

-

... More
Provision For Sign Boards

-

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

14

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

5

-

-

... More
Strengthening and Black Topping Road of Muduvarpatti GH to Saranthangi Road KM 0/0-1/080 ( R- 119 ) at Alanganallur Panchayat Union

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
KM 0/0-1/080

777.6

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
KM 0/0-1/080

388.8

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.

-

-

-

... More
KM 0/0-1/0

500

-

-

... More
KM 1/0-1/080

40

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2

-

-

-

... More
KM 0/0-1/080

607.5

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/080

4050

-

-

... More
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
KM 0/0-1/080

4050

-

-

... More
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete

-

-

-

... More
KM 0/0-1/080

202.5

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0-1/080

162.2

-

-

... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
KM 0/0-1/080

216

-

-

... More
Supply and fixing of KM stone SI No. 44 A

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Povision for Name Board Cum Citizen Board

1

-

-

... More
(ii) Road Marker/ Road stud with lens Reflector

12

-

-

... More
(iv)a. 60 cm Equilateral triangle cautionary signboard

8

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.