Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Jul 2022
Closing Date2 Aug 2022
Tender Amount₹ 85,00,000
Costs
EMD
₹ 85,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tnrris 2021-22 - Cgf 80 - Pack 2 - Ponnamaravathi Block - Pudukkottai District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_243253_1Bid Award Id
ViewTender No
TNRRIS 21-22 , CGF 80 - Pack 2 - Pudukkottai DtTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
2030.25
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km 0/0-1/0
375.9
-
-
... More
Km 1/0-1/620
233.18
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
6090.75
-
-
... More
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
6090.75
-
-
... More
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
-
-
-
... More
Km 0/0-1/0
3759
-
-
... More
Km 1/0-1/620
2331.75
-
-
... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
-
-
-
... More
Km 0/0-1/0
120
-
-
... More
Km 1/0-1/620
74.4
-
-
... More
Provision of Construction for NP3 Pipe Culvert at CH 1130m
-
-
-
... More
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
23.13
-
-
... More
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
2.16
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
3.58
-
-
... More
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
19.19
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
53.32
-
-
... More
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
6.78
-
-
... More
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
7
-
-
... More
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
1
-
-
... More
Provision for Sign board for Information
1
-
-
... More
Provision for Lettering the Name Board for Information
1
-
-
... More
2. Upgradation of the road from Venthanpatti to Surakodangivalavur road KM 0/0-1/120 in Venthanpatti Panchayat
-
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201.
820.8
-
-
... More
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
410.4
-
-
... More
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmental officers
487.5
-
-
... More
Construction of Granular Sub base by providing well graded material(25mm to 4.75mm IRC HBG @35%,65%, 4.75mm to 2.36mm IRC HBG metal @ 20% & 2.36 mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% respectively) spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method)
-
-
-
... More
Km 0/0-1/0
247.05
-
-
... More
Km 1/0-1/120
48.6
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km 0/0-1/0
489.38
-
-
... More
Km 1/0-1/120
67.5
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
4200
-
-
... More
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
4200
-
-
... More
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
-
-
-
... More
Km 0/0-1/0
3750
-
-
... More
Km 1/0-1/120
450
-
-
... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
-
-
-
... More
Km 0/0-1/0
135
-
-
... More
Km 1/0-1/170
16.2
-
-
... More
Provision of Construction for NP3 Pipe Culvert at CH 100m
-
-
-
... More
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
22.83
-
-
... More
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
1.74
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
5.92
-
-
... More
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
23.56
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
63.08
-
-
... More
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
6.78
-
-
... More
Provision of Construction for NP3 Pipe Culvert at CH 530m
-
-
-
... More
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
22.83
-
-
... More
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
1.74
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
5.92
-
-
... More
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
23.56
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
63.08
-
-
... More
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
6.78
-
-
... More
Provision of Construction for NP3 Pipe Culvert at CH 688m
-
-
-
... More
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
22.83
-
-
... More
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
1.74
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
5.92
-
-
... More
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
23.56
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
63.08
-
-
... More
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
6.78
-
-
... More
Provision of Construction for NP3 Pipe Culvert at CH 845m
-
-
-
... More
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
22.83
-
-
... More
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
1.74
-
-
... More
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
5.92
-
-
... More
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
23.56
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
63.08
-
-
... More
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
6.78
-
-
... More
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
4
-
-
... More
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
1
-
-
... More
Provision for Sign board for Information
3
-
-
... More
Provision for Lettering the Name Board for Information
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements