Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date26 Jul 2024
Closing Date2 Aug 2024
Tender Amount₹ 8,04,000 
Notes
Download

Costs

Summary

Krishnagiri Dt_thally Block _ Jjm _ 2024 _ 25 _nabarad _ridf_ Xxixfund _ 1.construction Of 10000 Litres Capacity Oht _7.5m Stagging_ At Kakkadasam H_o Kakkadasam_gf_pack_01

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by departmental officers.

1.44

-

-

... More
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers.

2.17

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers For items 1.5m to 4.5m below GL

2.38

-

-

... More
For items 0 to 1.50m below GL

1.03

-

-

... More
For items 0m to 4.5m above GL

2.11

-

-

... More
For items 4.51m to 7.32m above GL

2.56

-

-

... More
For items 7.32m to 10.98m above GL

3.65

-

-

... More
For Roof Slab 10.93 M TO 11.08 M

1.07

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding PLANE SURFACES Below G.L. & Upto 3.30m ht

15.48

-

-

... More
3.31m to 4.30 m

5.78

-

-

... More
6.31 to 7.30m

22.25

-

-

... More
Curved Surface 0 to 3.30m

44.19

-

-

... More
Square column Below G.L.

21.84

-

-

... More
3.30 m to 3.375

3.6

-

-

... More
4.31 to 5.30m

4.8

-

-

... More
5.31 to 6.30m

4.8

-

-

... More
6.31 to 7.00m

3.36

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

72.3

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Departmental officers. Up to16 mm dia and above 16 mm dia rods

1.2

-

-

... More
Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c

1

-

-

... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete and as directed by departmental officers. (AS PER SUB ESTIMATE) R.C.C. 1:1/2:3 using 20mm HBG Stone

0.31

-

-

... More
Shuttering charges by using MS angle and MS sheet

4.48

-

-

... More
Steel fabrication, placing and fixing of steel including cost of steel and binding wire etc., complete

0.04

-

-

... More
Providing GI ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by departmental officers MOSQUITO PROOF

2

-

-

... More
Towards provision for pipes and specials to OHT including all cost and conveyance 65mm GI pipe for inlet connection

12

-

-

... More
65mm GI pipes for over flow & rain water harvesting pipe

12

-

-

... More
50mm dia GI scour pipe

12

-

-

... More
65mm dia GI pipe for delivery

12

-

-

... More
90mmX 80dia PVC threaded coupler

2

-

-

... More
65mm dia PVC threaded coupler X 50

2

-

-

... More
65mm dia GI tee

3

-

-

... More
65mm dia GI 90◦ bend

5

-

-

... More
65mm dia GI coupler

6

-

-

... More
65mm dia GI union

3

-

-

... More
65mm dia GI elbow

3

-

-

... More
75mm x63 mm PVC reducer

2

-

-

... More
75mm X 50 PVC threaded coupler

2

-

-

... More
75x90 PVC reducer

1

-

-

... More
65mm dia GM gate valve

2

-

-

... More
50 mm dia GM gate valve

1

-

-

... More
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete MAN HOLE COVER

1

-

-

... More
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total

22.8

-

-

... More
Provision for Fencing as per sub estimate Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete

0.94

-

-

... More
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour chagres for mixing, laying, cmpacting and curing etc., complete.

0.44

-

-

... More
Supply and erection of centering for sides and soffits including all labour charge

3.06

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

0.06

-

-

... More
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers

0.16

-

-

... More
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.)

4.86

-

-

... More
Supply & fixing of Barbed wire including all cost and conveyance etc., all complete

96

-

-

... More
Supply & fixing of CHAIN LINK 2"X2" USING GAUGE Galvanised Iron wire (of all sizes)all cost and conveyance etc., all complete M0408

24

-

-

... More
Provision for erection charges for Precast concrete vertical post including all labour charges etc complete.,

1

-

-

... More
Provision for Grill Gate including all cost and all labour charges Fabricating supplying and Erecting in position mild steel angle iron trusses /MS channels including all cost and conveyance of men and materials, complete complying with standard specification

72.62

-

-

... More
Provsion for Photo charges

1

-

-

... More
Provsion for Name Board.

1

-

-

... More
Provision for distribution line as per sub estimate Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete

119.7

-

-

... More
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick

119.7

-

-

... More
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete 63mm 4KSCPVC Pipe including laying and jointing,

190

-

-

... More
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete 63mm 4KSCPVC Pipe laying & jointing

190

-

-

... More
63mm PVC Elbow

2

-

-

... More
63mm PVC Tee

2

-

-

... More
63mm PVC End Cap

2

-

-

... More
63mmPVC Ball Valve

2

-

-

... More
Provision for PUMPING LINE as per sub estimate Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete

126

-

-

... More
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick

126

-

-

... More
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete 75mm 6KSC PVC Pipe including laying and jointing,

200

-

-

... More
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete 75mm 6KSCPVC Pipe laying & jointing

200

-

-

... More
75 mm 6ksc PVC Elbow

2

-

-

... More
75mm PVC Tee

2

-

-

... More
75mm PVC End Cap

2

-

-

... More
75 mmPVC Ball Valve

2

-

-

... More
Provision for chlorinator as per sub estimate Provision towards pipe line arrangements for FHTC including all cost and conveyance etc., all complete 90mm dia PVC pipe

0.6

-

-

... More
63mm dia PVC pipe

0.6

-

-

... More
32mm dia PVC pipe

0.6

-

-

... More
63 x20mm PVC saddle

1

-

-

... More
90 x63mm PVC reducer coupler

1

-

-

... More
63mm x 50mm PVC reducer coupler

1

-

-

... More
PVC gate valve 90mm dia

1

-

-

... More
PVC gate valve 63mm dia

1

-

-

... More
32mm PVC Elbow

3

-

-

... More
32mm PVC End cap

1

-

-

... More
90mm PVC End cap

1

-

-

... More
Cost of brackets for PVC pipes

2

-

-

... More
Labour charges for fixing the PVC pipes and specials including all charges

1

-

-

... More
Contingencies

1

-

-

... More
Provision for Soak pit as per sub estimate Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.

0.85

-

-

... More
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification

0.05

-

-

... More
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,

0.08

-

-

... More
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete

0.79

-

-

... More
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete

0.06

-

-

... More
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,

1.91

-

-

... More
Provision for cutstone

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.