Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date21 Dec 2024
Closing Date9 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 2,63,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_513114_2Tender No
DIPR/5540/tender/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork excavation in Medium Rock & Dense Medium rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. (For Bridge Portion)
131.78
-
-
... More
Vibrated Cement Concrete of grade M 15 using 40mm, 20mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS.
8.24
-
-
... More
Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT and Returns AND PIERS
108.19
-
-
... More
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC abutment /Pier/ Wing wall below sill level
29.12
-
-
... More
Vibrated RCC of grade M 30 grade using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Abutment and returns wall above sill
55.46
-
-
... More
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC dirtwall and bedblock
4.47
-
-
... More
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
24
-
-
... More
Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.
13.12
-
-
... More
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Deckslab & Kerb
48.49
-
-
... More
Vibrated reinforced cement concrete M 30 Grade, using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APPROACH SLAB.
12.9
-
-
... More
Vibrated reinforced Cement Concrete of grade M 40 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Crashbarrier
7.01
-
-
... More
Vibrated Cement Concrete M20 grade using 20mm & 12 mm mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for parapet over Wing Wall.
6.3
-
-
... More
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 2000, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
22
-
-
... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
39.8
-
-
... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
66.46
-
-
... More
Provinding and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.
12.8
-
-
... More
Whitewashing for Abutment and Pier Substructure using two coats of freshly burnt Shell lime
176.75
-
-
... More
Plastic emulsion painting for handrail using two coat of enamel paint
61.9
-
-
... More
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASECOURSE BELOW APPROACH SLAB.
5.28
-
-
... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
98.89
-
-
... More
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
4
-
-
... More
Provision for Approach Road (Sub Estimate)
-
-
-
... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 2km for formation of Approach Road.
-
-
-
... More
98% COMPACTION
2808
-
-
... More
100% COMPACTION
594
-
-
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
153.56
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
143.44
-
-
... More
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
95.64
-
-
... More
KERB WALL
-
-
-
... More
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side
43.2
-
-
... More
Providing concrete for Plain/reinforced concrete in open foundations & Sub structure Nominal Mix 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers., compacting etc., complete complying with standard specifications as per drawings and technical specififcations clause 802, 803, 1202 & 1203 and as directed. Below Ground Level Footing:-
108
-
-
... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation.
144.9
-
-
... More
Provision for Retaining Wall (Sub Estimate)
-
-
-
... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
964.8
-
-
... More
Vibrated Cement Concrete of Grade M 15 grade, using 40mm,20mm &10mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.
120.6
-
-
... More
Vibrated Cement Concrete Grade M 20 , using 40mm,20mm & 10mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.
219.6
-
-
... More
Vibrated Cement Concrete of Grade M 20 using 40 mm, 20 mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -
944.12
-
-
... More
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete
720
-
-
... More
Provision for River Side Retaining Wall
-
-
-
... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
165.6
-
-
... More
Vibrated Cement Concrete of Grade M 15 grade, using 40mm,20mm &10mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.
20.7
-
-
... More
Vibrated Cement Concrete Grade M 20 , using 40mm,20mm & 10mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.
37.8
-
-
... More
Vibrated Cement Concrete of Grade M 20 using 40 mm, 20 mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -
179.4
-
-
... More
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete
120
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%