Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date23 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking Charges 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
KM 0/0 - 2/450

3055.25

-

-

... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.

-

-

-

... More
KM 0/0- 2/450

1979.8

-

-

... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0 - 1/0

225

-

-

... More
KM 1/0 - 2/0

223.69

-

-

... More
KM 2/0- 2/450

101.25

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for

-

-

-

... More
KM 0/0 - 1/0

282.85

-

-

... More
KM 1/0 - 2/0

279.62

-

-

... More
KM 2/0- 2/450

128.16

-

-

... More
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
KM 0/0 - 2/450

9230.1

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading

-

-

-

... More
KM 0/0 - 1/0

3771.3

-

-

... More
KM 1/0 - 2/0

3750

-

-

... More
KM 2/0- 2/450

1708.8

-

-

... More
Provision For HM Stone

10

-

-

... More
Provision For KM Stone

2

-

-

... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface

490

-

-

... More
60cm Equilqteral Traiangle Sing Board

3

-

-

... More
1.5 m Span Culvert @ CH - 1255 m

-

-

-

... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all

60.65

-

-

... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete

4.33

-

-

... More
Cement concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

4.31

-

-

... More
Below Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

115.79

-

-

... More
Above Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

18.16

-

-

... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

60.74

-

-

... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.

3.36

-

-

... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.

315

-

-

... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance

3.31

-

-

... More
Provision for Abutment PVC Pipe at weep Holes

12

-

-

... More
Tar Paper for Full Width Deck Slab

4.5

-

-

... More
1.5 m Span Culvert @ CH - 1460 m

-

-

-

... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all

60.65

-

-

... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete

4.33

-

-

... More
Cement concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

4.31

-

-

... More
Below Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

115.79

-

-

... More
Above Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

18.16

-

-

... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

60.74

-

-

... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.

3.36

-

-

... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.

315

-

-

... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance

3.31

-

-

... More
Provision for Abutment PVC Pipe at weep Holes

12

-

-

... More
Tar Paper for Full Width Deck Slab

4.5

-

-

... More
Provision For Citizition Information Board

1

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

2.45

-

-

... More
For the Second Year from the date of completion of work

2.45

-

-

... More
For the Third Year from the date of completion of work

2.45

-

-

... More
For the Fourth Year from the date of completion of work

2.45

-

-

... More
For the Fifth Year from the date of completion of work

2.45

-

-

... More
Part II-Strengthening the Road From Pallivasal Padaiyachi Road to Bus Stand in Devipattinam Panchayat 0/0-0/690 KM (Using Plastic Waste)

-

-

-

... More
Picking Charges 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
KM 0/0 - 0/690

862.5

-

-

... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.

-

-

-

... More
KM 0/0 - 0/690

291.6

-

-

... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0 - 0/690

82.8

-

-

... More
Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for

-

-

-

... More
KM 0/0 - 0/690

194.06

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for

-

-

-

... More
KM 0/0 - 0/690

194.06

-

-

... More
Applying TACK COAT over WBM/WMM surface at 7.5 Kg /of SS 1 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
KM 0/0 - 0/690

2587.5

-

-

... More
Applying TACK COAT over WBM/WMM surface at 2.5 Kg /of RS 1 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
KM 0/0 - 0/690

2587.5

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/0 - 0/690

64.69

-

-

... More
1.5 m Span Culvert @ CH - 5 m

-

-

-

... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all

94.56

-

-

... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete

5.25

-

-

... More
Cement concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

10.51

-

-

... More
Below Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

152.75

-

-

... More
Above Ground Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.

25.33

-

-

... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause

81.93

-

-

... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.

3.36

-

-

... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.

300

-

-

... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance

3.31

-

-

... More
Provision For HM Stone

3

-

-

... More
60cm Equilateral Traiangale Sign Board

2

-

-

... More
Provision For Citizition Information Board

1

-

-

... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface

138

-

-

... More
Road Reflector Including all the laabour Charge

60

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

0.69

-

-

... More
For the Second Year from the date of completion of work

0.69

-

-

... More
For the Third Year from the date of completion of work

0.69

-

-

... More
For the Fourth Year from the date of completion of work

0.69

-

-

... More
For the Fifth Year from the date of completion of work

0.69

-

-

-

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.