Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date23 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 8,04,000
Costs
EMD
₹ 8,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_465192_1Bid Award Id
ViewTender No
TYM/JJM/Work-2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Second depth of 1m
1.73
-
-
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
1.18
-
-
PCC 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement and labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
1.75
-
-
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete.
-
-
-
A) 1.5m to 4.50m Below GL
2.45
-
-
B) 0m to 1.50m Below G.L
1.03
-
-
C) Column above upto 4.5m from GL
2.11
-
-
D) Column 4.51m to 7.32m above GL
2.63
-
-
E) Roof slab 7.33m to 10.98m from GL
4.72
-
-
STEEL CENTERING: Centering for sides and soffits includig necessary supports and strutting to the required height for the folllowing RCC items using MS sheets of suitable size of B.G. 10 stiffened with welded MS angles of size 25mmx25mmx3mm for boarding, laid over silver oak (country wood) joist of size 10cmx6.5cm spaced at 90m C/C and supported by causrina props of 10cm to 13cm dia spaced at 75cm C/C complying wth standard specification etc., completed as directed by TWAD board officers.
-
-
-
A. PLANE SURFACE
-
-
-
i. Below GL
10.58
-
-
ii) G.L and at 3.30m from Above G.L
6.1
-
-
iii) 3.31m to 4.30m from above GL
5.78
-
-
iv) 6.31m to 7.30m from above GL
17.85
-
-
B) CURVED SURFACE
-
-
-
i) Upto 3.30m ht
43.69
-
-
ii) Floor Slab Sides (6.30 to 7.30m)
1.5
-
-
C. SQUARE COLUMN
-
-
-
i) Below GL
6
-
-
ii) Column 0m to 3.30m above GL
15.84
-
-
iii) Column from 3.31m to 4.30m above GL
3.6
-
-
iv) Column from 4.31m to 5.30m above GL
4.8
-
-
v) Column from 5.31m to 6.30m above GL
4.8
-
-
vi) Column from 6.31m to 7.30m above GL
3.36
-
-
Painting two coats of Emulsion paint with approved cement paint over one coat of priming coat over cement plastered exposed surface of the reservoid including cleaning preparing the surface and curing etc., complete
78.4
-
-
Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel including cost of electrodes and power for wilding typing wires, space bars cover blocks and all other incidental charges etc., completed and as directed by TWAD board officers.
13.25
-
-
Supply and Delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for sides and steps in 16 mm MS plain rods fixed at 30cm C/C welded jointed etc ., providing with suitable side supports, clamps and locking arrangements provided with two coats of approved enamel paint over one coat of redoxide paint , for providing access to roof top of OHT of suitable inclined length , including bottom anchorage and transportation and as directed by TWAD Board officers. The rate includes concrete bed block in CC 1:2:4 using 20mm HBGS at top and bottom of suitable size with necessry anchor bolts.
1
-
-
Providing and fixing of RCC inner access ladder in R.C.C. 1:1.5:3 mix using 20mm and 10 mm size hard granite broken stone (machine crushed) inside access ladder 0.60m wide made with steps at 45 cm interval from roof slab to floor slab level of the S.R including cost of reinforcement, fabrication, labour charges, centering charges colour washing with cement paint of approved colour and quality in two coats etc. complete and as directed by the TWAD Board Officers.
1
-
-
Providing 65 mm GI ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers
2
-
-
Supplying and fixing of cut stone of size 0.45m x 0.45m x 0.15 set in CM 1:3 (One cement and three sand) below the inlet pipe inside the service reservoir and as directed by the TWAD Board Officers.
0.03
-
-
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
1
-
-
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes specials, value, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality etc., complete.
-
-
-
65mm GI pipes for inlet connection
13.5
-
-
65mm GI pipes for over flow & rain water harvesting pipe
11.5
-
-
50mm GI pipes for scour pipe
8.5
-
-
65mm GI pipe for delivery pipe
11.5
-
-
90mm PVC Threaded coupler
1
-
-
63mm PVC Threaded coupler
2
-
-
65mm dia GI Tee
2
-
-
65mm dia GI bend 90
5
-
-
65mm dia GI bend (short)
1
-
-
65mm GI coupler
5
-
-
65mm GI union
2
-
-
65mm GI Elbow
1
-
-
50mm GI union
2
-
-
50mm GI Elbow
1
-
-
65x50mm GI reducer
1
-
-
75mmx63mm PVC reducer
2
-
-
65mm GM gate valve
2
-
-
50mm GM gate valve
1
-
-
63 mm PVC 4Ksc Pipe
6
-
-
Refilling foundation with excavated earth
19.74
-
-
Labour charges for GI pipe connection
1
-
-
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
0.77
-
-
Supply and fixing of cutstone pillar including cost and conveyance of all materials to work site and all labour charges etc., complete.
27
-
-
Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x10 gauge of best approved quality including cost of GI wire and labour charges for fixing in position etc., complete
55.5
-
-
RAIN WATER HARVESTING FOR OHT
-
-
-
Earthwork excavation and depositing on bank with initial lead and lift in cll clauses of soils such as hard stiff clay stiff black cotton soil hard red earth, sharles, murrams, gravel, stoney earth and mixed with 50% of fair sized boulders etc. complete.
2.57
-
-
Sand Filling with good river sand including cost and conveyance of all materials to site including all labour charges for filling etc complete
0.56
-
-
Supply and fixing of 20mm Broken stone including cost and conveyance of all materials to site including filling etc complete
0.13
-
-
Supply and fixing of 40mm Broken Stone including cost and conveyance of all materials to site including filling etc complete
0.29
-
-
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
0.83
-
-
Brickwork in CM 1:5 mix using country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including cost and conveyance of all materials of all materials to site and labour charges etc. complete
0.38
-
-
Cement Concrete 1:2:4 mix using 40mm metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
0.79
-
-
Plastering with cement mortor 1:5 mix to 12mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete
3.67
-
-
Supply and fixing of 4"PVC Pipe etc., complete
7.5
-
-
Supply and fixing of 900mm dia RCC Collar
3
-
-
Pipeline for Pumping Main
-
-
-
Earth work excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
49.14
-
-
Supply and delivery of following PVC Pipes 90mm OD PVC 6KSC Pips
78
-
-
Conveyance of the following rigid PVC Pipes, Lowering to trenches and laying to proper grade and alignment 90mm OD PVC 6KSC Pips
78
-
-
Refiiling the excaveted soil charges
49.14
-
-
Providing for Supply and fixing of Water Meter with Dirt Box etc., complete
1
-
-
Providing for Erection charges for Water Meter etc., complete. (Includes earth work excavation,labour charges, cutting and threading, conveyance,welding and hire charges for tools and plants etc., complete)
1
-
-
Pipeline for Delivery line
-
-
-
Earth work excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
120.96
-
-
Supply and delivery of following PVC Pipes 63mm OD PVC 4KSC Pips
192
-
-
Conveyance of the following rigid PVC Pipes, Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4KSC Pips
192
-
-
Refiiling the excaveted soil charges
120.96
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements