Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Sep 2022
Closing Date14 Sep 2022
Tender Amount₹ 2,49,000
Costs
EMD
₹ 2,490Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repairs To Kitchen Shed Building 5 Nos Pacage No 1 Sids 2021-22
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_250463_1Bid Award Id
ViewTender No
2433/2022/a2/18.08.2022Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
0.6
-
-
... More
Paving the floor with Anti kids slab of size 305x305x6mm / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
15.21
-
-
... More
Replacement of window
2
-
-
... More
Replacement of door
2
-
-
... More
Provision od chiilah
1
-
-
... More
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
19.35
-
-
... More
Interior Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
50.22
-
-
... More
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
60.62
-
-
... More
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
16.56
-
-
... More
Provision for Nameboard charges
1
-
-
... More
2.Repairs to Kitchen shed at PUE school at Pamani in Karnavur Panchayat
-
-
-
... More
Dismantling the execting wall Plastering including cost and conveyance and all labour charges etc., completed
0.5
-
-
... More
Chipping the existing damaged tiles flooring inculding cost and conveyance of all materials to site and labour charges for curing etc
15.75
-
-
... More
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
0.5
-
-
... More
Paving the floor with Anti kids slab of size 305x305x6mm / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
17.25
-
-
... More
Replacement of window
2
-
-
... More
Replacement of door
2
-
-
... More
chullah
1
-
-
... More
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
18.15
-
-
... More
Interior Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
49.86
-
-
... More
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
65.3
-
-
... More
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
10.8
-
-
... More
Provision for Nameboard charges
1
-
-
... More
3.Repairs to Kitchen shed at PUE school Vengaramperayur in Bharathimooolangudi Panchayat
-
-
-
... More
Dismantling the execting wall Plastering including cost and conveyance and all labour charges etc., completed
0.5
-
-
... More
Chipping the existing damaged tiles flooring inculding cost and conveyance of all materials to site and labour charges for curing etc
15.75
-
-
... More
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
0.5
-
-
... More
Paving the floor with Anti kids slab of size 305x305x6mm / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
17.25
-
-
... More
Replacement of window
2
-
-
... More
Replacement of door
2
-
-
... More
chullah
1
-
-
... More
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
18.15
-
-
... More
Interior Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
49.86
-
-
... More
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
65.3
-
-
... More
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
10.8
-
-
... More
Provision for Nameboard charges
1
-
-
... More
4.Repairs to Kitchen shed at PUE school at sathanur in palayanur Panchayat
-
-
-
... More
Dismantling the execting wall Plastering including cost and conveyance and all labour charges etc., completed
6.45
-
-
... More
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
6.45
-
-
... More
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
12.98
-
-
... More
Interior Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
29.84
-
-
... More
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
31.89
-
-
... More
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
3.42
-
-
... More
Provision for Nameboard charges
1
-
-
... More
5.Repairs to Kitchen shed at PUE school at uchivadi in south facing vadapathimangalam Panchayat
-
-
-
... More
Dismantling the execting wall Plastering including cost and conveyance and all labour charges etc., completed
6.48
-
-
... More
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
6.48
-
-
... More
supplying cudappa slab 4o mm thick including
5.88
-
-
... More
Pointing with CM 1;3 MIX full depth of tiles including in cost and conveyence
29
-
-
... More
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
23.59
-
-
... More
Interior Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
102.48
-
-
... More
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
73.43
-
-
... More
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
13.92
-
-
... More
Replacement window charges
2
-
-
... More
Provision for Nameboard charges
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements