Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Building Construction
Eprocure
Opening Date8 Jul 2023
Closing Date14 Jul 2023
Tender Amount₹ 9,77,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Re Filling the Basement with Exvated Earth rammed watered and not compacted complete complying with standard specification.

18.82

-

-

... More
Brick work in following Cement Mortar using best quality Country bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.

1

-

-

... More
Foundation

9.03

-

-

... More
Super Structure

19.12

-

-

... More
Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete.

1.3

-

-

... More
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete.

1

-

-

... More
Column upto Ground level

10.16

-

-

... More
Rate for column post

65.25

-

-

... More
Rate for roof slab, lintel, beam

109.25

-

-

... More
Rate for sunshade

8.44

-

-

... More
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.

1

-

-

... More
Foundationand Basement

10.56

-

-

... More
For superstructure in ground floor

3.89

-

-

... More
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facial, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete complying with standard specifications.

86.69

-

-

... More
Plastering with CM 1:5,12mm thick. over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.

223.09

-

-

... More
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labor charges etc complete.

58.99

-

-

... More
Distempering two coats with best approved oil bound distemper including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labor charges

177.7

-

-

... More
Interior / Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete.

133.1

-

-

... More
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved color over the existing priming coat etc., complete

30.43

-

-

... More
Supplying and fabrication of the following steel doors ,and windows including cost and conveyance and all charges etc complete.

1

-

-

... More
Rolling Shutter

3.78

-

-

1

-

-

... More
Window (0.90 x 1.30 )m

1

-

-

... More
Window 1 (0.75 x 0.90 )m

1

-

-

... More
Ventilator - V (0.90 x 0.45 )m

3

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.