Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date6 Nov 2024
Closing Date12 Nov 2024
Tender Amount₹ 8,60,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.

9.35

-

-

... More
Filling with Excavated Earth including watering & Ramming etc., complete.

12.81

-

-

... More
Supplying and filling with sand including all cost and conveyance and labour charges for watering & Ramming etc., complete.

0.9

-

-

... More
Random Rubble Masonry in cm 1:5 mix using required bond stone with simultaneous pointing including all labour charges.

7.02

-

-

... More
Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete.

3.58

-

-

... More
Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete.

-

-

-

... More
Upto Basement

16.59

-

-

... More
Above Basement

44

-

-

... More
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.

716.3

-

-

... More
RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.

6.45

-

-

... More
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.

44

-

-

... More
Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete.

18.55

-

-

... More
Finishing the top of roof with one course of machine pressed tiles of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound and top pointing with same oiled mortar including all cost and conveyance of all materials and labour charges etc. complete

22.4

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.

3.35

-

-

... More
Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.

27.82

-

-

... More
Exterior Emulsion using best quality and approved cement paint over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.

37.76

-

-

... More
Supplying & fixing with RCC Precast Slabs 50mm thick for chimney cover slab etc., complete.

1.05

-

-

... More
Water Tub

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

3.18

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

5.21

-

-

... More
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete

4.98

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum

2.12

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.

38.25

-

-

... More
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.

38.25

-

-

... More
Cement Concrete Approach Road

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

3.06

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

15.66

-

-

... More
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT

3.52

-

-

... More
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

14.13

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum

11.48

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.

15.3

-

-

... More
Supplying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.

2.7

-

-

... More
Hand Pump Arrangements

-

-

-

... More
Drilling of 180 mm Dia Deep Borewell in Hard Rock Area including all charges etc, complete

18

-

-

... More
Drilling of 150 mm Dia Deep Borewell in Hard Rock Area including all charges etc, complete

75

-

-

... More
Supply and Delivery of 180 mm Dia 6 KSC PVC Pipe

18

-

-

... More
Conveyance (20 to 40 kms) of Hand Pumps and its accessories from divisional stores to site of works

1

-

-

... More
Erection of deep well hand pumps Above 40 m

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.