Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Excavation
Eprocure
Opening Date22 Sep 2022
Closing Date28 Sep 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Mandapam/agamt Oorani

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. Bundside

6570

-

-

... More
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)

3300

-

-

... More
Toe Wall

-

-

-

... More
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification

87.3

-

-

... More
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges

17.46

-

-

... More
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed

17.46

-

-

... More
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed

104.76

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane

349.2

-

-

... More
Bathing Ghat-I

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

6.5

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications

5.26

-

-

... More
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.

5.26

-

-

... More
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation

1.93

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane

48.46

-

-

... More
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position

580.5

-

-

... More
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost

9.32

-

-

... More
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed

3.15

-

-

... More
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour

63.24

-

-

... More
Exterior Colour wash painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance

71.36

-

-

... More
Bathing Ghat-II

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

6.5

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications

5.26

-

-

... More
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.

5.26

-

-

... More
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation

1.93

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane

48.46

-

-

... More
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position

580.5

-

-

... More
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost

9.32

-

-

... More
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed

3.15

-

-

... More
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour

63.24

-

-

... More
Exterior Colour wash painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance

71.36

-

-

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

31.03

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications

1.64

-

-

... More
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.

2

-

-

... More
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation

7.69

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane

28.54

-

-

... More
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete

7.5

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.