Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Building Construction
Eprocure
Opening Date6 Jan 2021
Closing Date20 Jan 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Tiruvarur District - Scpar 2019-20 Road Work - Kottur Block - Package No.1/ktr/scpar/2020-21

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using fly ash obtained from industries with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using Stone Dust to improve CBR 7 to 9))

-

-

-

... More
Chanage 0/0 -1/0

990

-

-

... More
Chanage 1/0 -2/0

990

-

-

... More
Chanage 2/0 -2/014

13.86

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Chanage 0/0 -1/0

375

-

-

... More
Chanage 1/0 -2/0

375

-

-

... More
Chanage 2/0 -2/014

5.25

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material pa

-

-

-

... More
Chanage 0/0 -1/0

225

-

-

... More
Chanage 1/0 -2/0

225

-

-

... More
Chanage 2/0 -2/014

3.15

-

-

... More
Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre of gravel blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compact watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power roller water sprinkler and all other tools and plants employed barrcating etc., completed as per clause 404 of M.O.S.T. specification.

-

-

-

... More
Chanage 0/0 -1/0

225

-

-

... More
Chanage 1/0 -2/0

225

-

-

... More
Chanage 2/0 -2/014

3.15

-

-

... More
Providing and laying tack coat over unprimed WBM surface using 4kg of bitumen binder for 10sqm area including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat bitumen a prayer etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Chanage 0/0 -1/0

3000

-

-

... More
Chanage 1/0 -2/0

3000

-

-

... More
Chanage 2/0 -2/014

42

-

-

... More
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18 cum of 13.2mm and 0.09cum of 11.2mm IRC – HBG metal with 14.60kg of bitumen for premix carpet and 0.9cum of 6.7mm IRC –HBC metal with 9.8 kg of bitumen for seal coat type A per 10 sqr. Metre including cost and conveyance of all materials to work site and stacking them to department gauge for pre measurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mint hot mix plant compacted by 8-10 tones power roller including all labour charges for spreading for premix carpet and seal coat. All hire charges and fuel charges for all plant and machineries all tools and plants employed etc., complete as per clause 509 of most specification and fuel charges for all plant and machineries all tools and plants employed etc., complete as per clause 509 of most specification

-

-

-

... More
Chanage 0/0 -1/0

3000

-

-

... More
Chanage 1/0 -2/0

3000

-

-

... More
Chanage 2/0 -2/014

42

-

-

... More
Collection and supply of U.S. gravel for Side berms from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc. complete

-

-

-

... More
Chanage 0/0 -1/0

90

-

-

... More
Chanage 1/0 -2/0

90

-

-

... More
Chanage 2/0 -2/014

1.26

-

-

... More
Supply and fixing of Name board

1

-

-

... More
Provision for kilometre stones

2

-

-

... More
Provision for Hectametre stones

8

-

-

... More
Provision for pipe Culvert Ch 242,368,494,639m

-

-

-

... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B

56.24

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications

8.6

-

-

... More
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

11.44

-

-

... More
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.

51

-

-

... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete

169.24

-

-

... More
supply and fixing of NP3 pipe, including cost and conveyance of all materials to site including hire amd labour charges etc complete.,

20

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

-

-

-

... More
Chanage 0/0 -0/380

17.6

-

-

... More
Provision for pipe Culvert Ch 1003m

-

-

-

... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B

14.06

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications

2.15

-

-

... More
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

2.86

-

-

... More
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.

12.75

-

-

... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete

42.31

-

-

... More
supply and fixing of NP3 pipe, including cost and conveyance of all materials to site including hire amd labour charges etc complete.,

5

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

-

-

-

... More
Chanage 0/0 -0/380

4.4

-

-

... More
Provision for pipe Culvert Ch 1409,1640,1875m

-

-

-

... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B

42.18

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications

6.45

-

-

... More
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

8.58

-

-

... More
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.

38.25

-

-

... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete

126.93

-

-

... More
supply and fixing of NP3 pipe, including cost and conveyance of all materials to site including hire amd labour charges etc complete.,

15

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

-

-

-

... More
Chanage 0/0 -0/380

13.2

-

-

... More
Provision for pipe Culvert Ch 2014m

-

-

-

... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B

14.06

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications

2.15

-

-

... More
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

2.86

-

-

... More
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.

12.75

-

-

... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete

42.31

-

-

... More
supply and fixing of NP3 pipe, including cost and conveyance of all materials to site including hire amd labour charges etc complete.,

5

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

-

-

-

... More
Chanage 0/0 -0/380

4.4

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.