Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date31 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 29,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:4:8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.

5.05

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers.

10.4

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.

1.75

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., completeMAT Concrete

10.08

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

7

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. For column upto G.L. Brace Beam Bottom

0.61

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B

0.91

-

-

... More
Cement concrete 1:4:8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.

0.82

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc.complete.

14.36

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc complete

0.38

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etccomplete.

2.62

-

-

... More
Refilling the foundation with excavated earth including watering and consolidation etc., complete.

62.47

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc complete.

14.84

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc complete.

1.3

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etccomplete.

20.36

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc complete

0.38

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc complete.

2.62

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Sq.Col.Cent. Rate 3.02 - 3.30

1.12

-

-

... More
Sq.Col.Cent. Rate 3.30 - 4.30

5.6

-

-

... More
Sq.Col.Cent. Rate 4.30 - 5.30

5.6

-

-

... More
Sq.Col.Cent. Rate 5.30 - 5.74

2.52

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.RCC Rate 3.02 - 4.50

0.69

-

-

... More
RCC Rate (4.50 - 5.74)

0.61

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

20.36

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete

0.38

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

2.62

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Sq. Col. Cent. Rate (6.04 - 6.30)

0.56

-

-

... More
Sq. Col. Cent. Rate 6.30 - 7.30

5.6

-

-

... More
Sq. Col. Cent. Rate 7.30 - 8.30

5.6

-

-

... More
Sq. Col. Cent. Rate 8.30 - 8.76

3.08

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

1.3

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

20.36

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete

0.38

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

0.77

-

-

... More
RCC Rate 9.00 - 9.30

1.54

-

-

... More
Third Brace beam 8.55-9.00

0.07

-

-

... More
Third Brace beam 9.00-9.30

0.25

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc 9.30-10.30

5.6

-

-

... More
Sq. Col. Cent. Rate 10.30 - 11.14

4.7

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

0.9

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

9.32

-

-

... More
Centering Rate plain surface (11.30 - 11.59)

8.49

-

-

... More
Centering 11.14 - 11.30

0.88

-

-

... More
Centering 11.30-11.59

1.67

-

-

... More
Floor slabCentering

4.65

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete

2.12

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

9.23

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

15.61

-

-

... More
Curv. Surface. Cent. Rate 0.00-3.30

32.78

-

-

... More
Curv. Surface. Cent. Rate 0.00-3.30

19.35

-

-

... More
Curv. Surface. Cent. Rate 3.30 4.30

13.44

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

4.77

-

-

... More
RCC Rate 13.50 - 14.75

5.02

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.

21.82

-

-

... More
Tank cover slab side wall curved 14.75-14.93

3.25

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete

0.29

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.

4.47

-

-

... More
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete.,

2

-

-

... More
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete.,

0.36

-

-

... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 one cement, one and half sane! and three aggregates using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.

1

-

-

... More
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.

1

-

-

... More
Providing cut stone slab in CM 1:3 etc., complete.,.45x.45x.15

0.03

-

-

... More
Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete.

223.39

-

-

... More
65mm dia GI pipes for inlet connection

17

-

-

... More
65mm dia GI pipes for over flow and RWH

15

-

-

... More
65mm dia GI pipes for delivery pipe.

18

-

-

... More
50mm dia GI pipes for scour pipe.

12

-

-

... More
65mm dia GI Tee

5

-

-

... More
65mm dia 90 Deg. Bend

2

-

-

... More
65mm dia GI Coupler

5

-

-

... More
65mm dia GI Union

2

-

-

... More
65mm dia GI Elbow

1

-

-

... More
50mm dia GI Union

2

-

-

... More
50mm dia GI Elbow

1

-

-

... More
65mm dia GM Gate Valve

2

-

-

... More
geophysical investigation charges

1

-

-

... More
drilling of 150mm dia borewell in hardrock areas anywhere in tamilnadu including transportation to the worksite in hardrock areas and developing the borewell over burden soil ref managing director, twad board, chennai,

18

-

-

... More
drilling of 150mm dia borewell in hardrock areas anywhere in tamilnadu including transportation to the worksite in hardrock areas and developing the borewell

43

-

-

... More
supply of 150mm od pvc casing pipe including transportation charges etc.,

18

-

-

... More
Borewell sub mercible pumpset 50 x 175 Mtr head 5.00 HP

1

-

-

... More
5.0 Hp panel board consist of following 1.Voltmeter and ammeter suitable for above pumpset

1

-

-

... More
4.00 sqmm submersible cable

58

-

-

... More
50mm UPVC pipe

48

-

-

... More
50mm GI Bend

2

-

-

... More
50mm GI Pipe

6

-

-

... More
50mm GI Flange Set

1

-

-

... More
50mm Non Return Valve

1

-

-

... More
Solvent Cement

1

-

-

... More
63AMS Main awitch

1

-

-

... More
PVC Insulation Tap

2

-

-

... More
75mm Pvc pipe 6ksc

1452

-

-

... More
Earth work excavation in hard stiff clay block cotton red earth shales murram fair sized boulders etc

1452

-

-

... More
63mm Pvc pipe 4ksc

929

-

-

... More
Earth work excavation in hard stiff clay block cotton red earth shales murram fair sized boulders etc

929

-

-

... More
erection of power pumps in borewell labour charges for erection of twin packer duplex type jet pumps in borewells upto 150 mm dia including fixing of suction pipe regulating valves with jet assembly upto a maximum depth of 30 m and delivery pipe valves pressure gauges upto the exterior wall of pump room and erection of panel board consisting of tpicn switches starter, voltmeter, ammeter, three indicator lamps capacitor and laying and jointing the cables and twin earthing as per ie rules etc., complete and testing the pumps and trail run for 10 days including signing of completion of reports as required by eb authorities and finishing the pipe holes including the foundation bolts, nuts and earth pits.

1

-

-

... More
Provision for Painting and Drawing

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.