Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Feb 2025
Closing Date7 Feb 2025
Tender Amount₹ 15,00,000
Costs
EMD
₹ 15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_522309_1Tender No
3136/2024/A2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Refiiling of Carted Earth Including cost and Conveyance
44.89
-
-
... More
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
11.08
-
-
... More
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement
9.7
-
-
... More
. B) Above Basement
11.1
-
-
... More
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement
49.55
-
-
... More
RCC SLABS,
149.7
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
2.3
-
-
... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement
14.56
-
-
... More
.II) superstructure Ground level
16.16
-
-
... More
Weathering course concrete (Brick jelly lime concrete) using 20mm Broken brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying, and finishing etc., complete
3.75
-
-
... More
Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification
51.36
-
-
... More
Plastering with cement mortar 1:3 mix to10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
107.48
-
-
... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
273.72
-
-
... More
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
52.58
-
-
... More
Fabrication and supply of mild Steel Doors and Windows of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
-
-
-
... More
i. Steel Door D1
2
-
-
... More
Jolly
4.5
-
-
... More
Window
2
-
-
... More
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete.
107.48
-
-
... More
Distemberinn two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
127.71
-
-
... More
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
146.39
-
-
... More
Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
13.8
-
-
... More
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
12
-
-
... More
Provision for Electrical Charges
1
-
-
... More
Provision for shelf aregements Charges
1
-
-
... More
Provision for Rain Water Harvesting Arrangements Charges
1
-
-
... More
Provision for Name Borad Charges
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements