Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Date10 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Strengthening To The Road From Kokkalai - Periyamanali To Kottapalayam Via Athikadu H/o Periyamanali Km 0/000 - 2/230 At Elachipalayam Block In Namakkal District With Five Year Maintenance Pkg.no . 01/ Nkl/nabard Ridf Xxx 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
KM 0/000 - 1/000

53.06

-

-

... More
KM 1/000 - 2/000

49.08

-

-

... More
KM 2/000 - 2/230

10.51

-

-

... More
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
KM 0/000 - 1/000

442.44

-

-

... More
KM 1/000 - 2/000

399.61

-

-

... More
KM 2/000 - 2/230

90.69

-

-

... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.

-

-

-

... More
KM 0/000 - 1/000

337.5

-

-

... More
KM 1/000 - 2/000

337.5

-

-

... More
KM 2/000 - 2/230

77.63

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

-

-

-

... More
KM 0/000 - 1/000

496.03

-

-

... More
KM 1/000 - 2/000

477.98

-

-

... More
KM 2/000 - 2/230

124.13

-

-

... More
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
KM 0/000 - 1/000

3968.23

-

-

... More
KM 1/000 - 2/000

3823.82

-

-

... More
KM 2/000 - 2/230

993

-

-

... More
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
KM 0/000 - 1/000

3968.23

-

-

... More
KM 1/000 - 2/000

3823.82

-

-

... More
KM 2/000 - 2/230

993

-

-

... More
Providing and laying Bituminious Macadam with hot Mix Plant Using Crushed stone Aggregates of Grading as Per Table 500.4 Premixed with Bituminous binder transforted to Ste Upto lead of 1000m laid over a Prevousely prepared surface with Paver finishes to the Required grade level and alignment and rolled to achieve the desired compaction as per Technical Specification clause 504

-

-

-

... More
KM 0/000 - 1/000

198.41

-

-

... More
KM 1/000 - 2/000

191.19

-

-

... More
KM 2/000 - 2/230

49.65

-

-

... More
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
KM 0/000 - 1/000

99.21

-

-

... More
KM 1/000 - 2/000

95.6

-

-

... More
KM 2/000 - 2/230

24.83

-

-

... More
Provision for Road Marking including all cost and conveyance labour and Material charge etc, Complete

446

-

-

... More
Ordinary Kilometer Stone (precast)

2

-

-

... More
200 m stone (precast)

9

-

-

... More
Guard Stone(precast)

50

-

-

... More
a. 60cm Equilateral tringle cautionary signboard

28

-

-

... More
b. 60cm Cricle (MANDATORY SIGN)

9

-

-

... More
RETAINING WALL

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

-

-

-

... More
Ch.400 - 440 (Right Side)

75.36

-

-

... More
Ch.600 - 696 (Left Side)

180.86

-

-

... More
Ch.1515 - 1548 (Left Side)

62.17

-

-

... More
Ch.1530 - 1605 (Right Side)

141.3

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.

-

-

-

... More
Ch.400 - 440 (Right Side)

6.28

-

-

... More
Ch.600 - 696 (Left Side)

15.07

-

-

... More
Ch.1515 - 1548 (Left Side)

5.18

-

-

... More
Ch.1530 - 1605 (Right Side)

11.78

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)

-

-

-

... More
Ch.400 - 440 (Right Side)

18.84

-

-

... More
Ch.600 - 696 (Left Side)

45.22

-

-

... More
Ch.1515 - 1548 (Left Side)

15.54

-

-

... More
Ch.1530 - 1605 (Right Side)

35.33

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Above Sill)

-

-

-

... More
Ch.400 - 440 (Right Side)

68.23

-

-

... More
Ch.600 - 696 (Left Side)

164.06

-

-

... More
Ch.1515 - 1548 (Left Side)

56.4

-

-

... More
Ch.1530 - 1605 (Right Side)

128.18

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill)

-

-

-

... More
Ch.400 - 440 (Right Side)

90.54

-

-

... More
Ch.600 - 696 (Left Side)

213.74

-

-

... More
Ch.1515 - 1548 (Left Side)

75.14

-

-

... More
Ch.1530 - 1605 (Right Side)

167.54

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill)

-

-

-

... More
Ch.400 - 440 (Right Side)

150.21

-

-

... More
Ch.600 - 696 (Left Side)

360.11

-

-

... More
Ch.1515 - 1548 (Left Side)

124.8

-

-

... More
Ch.1530 - 1605 (Right Side)

281.67

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

2.23

-

-

... More
For the Second Year from the date of cpmpletion of work

2.23

-

-

... More
For the Third Year from the date of completion of work

2.23

-

-

... More
For the Fourth Year from the date of completion of work

2.23

-

-

... More
For the Fifth Year from the date of completion of work

2.23

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.