Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Construction Material
Eprocure
Opening Date15 May 2024
Closing Date19 Jun 2024
Tender Amount₹ 2,04,97,940.66 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Pmgsy Iii 2022-2023 - Theni District - Andipatty Block - Package No. Tn19-43

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
Km. 1/150 - 2/0

1148.11

-

-

... More
Km. 2/0 - 3/0

1275.57

-

-

... More
Km. 3/0 - 4/0

1293.32

-

-

... More
Km. 4/0 - 5/0

1192.32

-

-

... More
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
Km. 1/150 - 2/0

469.69

-

-

... More
Km. 2/0 - 3/0

525.93

-

-

... More
Km. 3/0 - 4/0

534.37

-

-

... More
Km. 4/0 - 5/0

497.81

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).

-

-

-

... More
Km. 1/150 - 2/0

470.89

-

-

... More
Km. 2/0 - 3/0

533.06

-

-

... More
Km. 3/0 - 4/0

544.17

-

-

... More
Km. 4/0 - 5/0

513.87

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

-

-

-

... More
Km. 1/150 - 2/0

3139.22

-

-

... More
Km. 2/0 - 3/0

3553.78

-

-

... More
Km. 3/0 - 4/0

3627.88

-

-

... More
Km. 4/0 - 5/0

3425.71

-

-

... More
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).

-

-

-

... More
Km. 1/150 - 2/0

3139.22

-

-

... More
Km. 2/0 - 3/0

3553.78

-

-

... More
Km. 3/0 - 4/0

3627.88

-

-

... More
Km. 4/0 - 5/0

3425.71

-

-

... More
Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING]. Km. 1/150 - 1/300

562.5

-

-

... More
NEW TECHNOLOGY [WASTE PLASTIC]

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING USING WASTE PLASTIC].

-

-

-

... More
Km. 1/300 - 2/0

2576.72

-

-

... More
Km. 2/0 - 3/0

3553.78

-

-

... More
Km. 3/0 - 4/0

3627.88

-

-

... More
Km. 4/0 - 5/0

3425.71

-

-

... More
Construction of Hard Bed at Ch 2480-2500, 2530-2560, 4000-4100

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

119.88

-

-

... More
Hard bed @ Ch. 2530 - 2560

159.88

-

-

... More
Hard bed @ Ch. 4000 - 4100

439.88

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

11.86

-

-

... More
Hard bed @ Ch. 2530 - 2560

15.61

-

-

... More
Hard bed @ Ch. 4000 - 4100

41.86

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

11.86

-

-

... More
Hard bed @ Ch. 2530 - 2560

15.61

-

-

... More
Hard bed @ Ch. 4000 - 4100

41.86

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

47.06

-

-

... More
Hard bed @ Ch. 2530 - 2560

60.11

-

-

... More
Hard bed @ Ch. 4000 - 4100

151.46

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM)

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

18.02

-

-

... More
Hard bed @ Ch. 2530 - 2560

27.92

-

-

... More
Hard bed @ Ch. 4000 - 4100

97.22

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (DRY LEAN CONCRETE)

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

12.01

-

-

... More
Hard bed @ Ch. 2530 - 2560

18.61

-

-

... More
Hard bed @ Ch. 4000 - 4100

64.81

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 (Pavement Quality Concrete).

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

25.5

-

-

... More
Hard bed @ Ch. 2530 - 2560

38.25

-

-

... More
Hard bed @ Ch. 4000 - 4100

127.5

-

-

... More
Provision of Guard Stones

-

-

-

... More
Hard bed @ Ch. 2480 - 2500

22

-

-

... More
Hard bed @ Ch. 2530 - 2560

32

-

-

... More
Hard bed @ Ch. 4000 - 4100

102

-

-

... More
Construction of Wearing Coat with the length of 15 15 50 15 at Ch 1935 2348 3210 4815

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Exist.CC @ Ch. 1935

11.25

-

-

... More
Removal of Exist.CC @ Ch. 2348

11.25

-

-

... More
Removal of Exist.CC @ Ch. 3210

37.5

-

-

... More
Removal of Exist.CC @ Ch. 4815

11.25

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

-

-

-

... More
Wearing Coat @ Ch. 1935

19.13

-

-

... More
Wearing Coat @ Ch. 2348

19.13

-

-

... More
Wearing Coat @ Ch. 3210

63.75

-

-

... More
Wearing Coat @ Ch. 4815

19.13

-

-

... More
Provision of Guard Stones

-

-

-

... More
Wearing Coat @ Ch. 1935

17

-

-

... More
Wearing Coat @ Ch. 2348

17

-

-

... More
Wearing Coat @ Ch. 3210

52

-

-

... More
Wearing Coat @ Ch. 4815

17

-

-

... More
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km. 1/150 - 2/0

0.56

-

-

... More
Km. 2/0 - 3/0

1.69

-

-

... More
Km. 3/0 - 4/0

2.25

-

-

... More
Km. 4/0 - 5/0

2.81

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

770

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

130

-

-

... More
Provision for Name Board

1

-

-

... More
Provision for PMGSY Logo Board

3

-

-

... More
Provision for Sign Board (1 curve =2Nos)

26

-

-

... More
Provision for Chevron Sign Octogan Board (90cm)

2

-

-

... More
Provision for 60 cm Circle(Mandatory Sign Board)

4

-

-

... More
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker

28

-

-

... More
Provision for Citizen Information Board

1

-

-

... More
Provision for Maintenance Board

1

-

-

... More
Provision for KM Stone

3

-

-

... More
Provision for HM Stone

16

-

-

... More
Maintenance Towards the charges for routline maintenance of the bridge work executed under PMGSY as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1

-

-

... More
For the Second Year from the date of cpmpletion of work

1

-

-

... More
For the Third Year from the date of completion of work

1

-

-

... More
For the Fourth Year from the date of completion of work

1

-

-

... More
For the Fifth Year from the date of completion of work

1

-

-

... More
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.