Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date25 Jul 2024
Closing Date2 Aug 2024
Tender Amount₹ 29,97,000
Costs
EMD
₹ 29,970Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_463654_2Tender No
JJM 2024-25 A2/2018/2022Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
9.13
-
-
RCC in 1:11/2:3 using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department or footing below G.L. ( 1,50 to 4,50 below GL )
34.66
-
-
For Column and Brace upto G.L ( 0 to1,50 below GL )
2.53
-
-
For column and brace I 0 to 4.5m from GL
3.79
-
-
For column at, 4.51m to 7.32m from GL
2.97
-
-
For column at 7.32 to 10.98m from GL
3.38
-
-
For items above 10.98 m & up to 14.64 m from GL
15.59
-
-
For items above 14.64 m & up to 18.30 m from GL
7.29
-
-
A. PLANE SURFACES Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding Below GL
27.52
-
-
GL 0 to 3.30 M For column footing and GL Brace For Brace I
14.56
-
-
3.3. to 4.30 m
21
-
-
5.3. to 6.30 m
14.56
-
-
8.3. to 9.30 m
14.56
-
-
11.3. to 12.30 m
50.94
-
-
B. CURVED COLUMN For column Below GL For column GL 0 to 3.30M
112.21
-
-
3.3to 4.30M
12.13
-
-
SQUARE COLUMN For column ( 0m to 3.30m ).
24.96
-
-
SQUARE COLUMN For column ( 3.31m to 4.30m ).
5.6
-
-
For column ( 4.31m to 5.30m).
5.6
-
-
5.30 - 6.30m Level
4.64
-
-
6.30 - 7.30m Level
5.6
-
-
7.30 - 8.30m Level
5.6
-
-
8.30 - 9.30m Level
4.64
-
-
9.30 - 10.30m Level
5.6
-
-
10.30 - 11.30m Level
5.6
-
-
11.30 - 12.30m Level
0.56
-
-
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
68.5
-
-
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
176.4
-
-
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.
1
-
-
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
1
-
-
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
1
-
-
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
2
-
-
Supply & Fixing Cut Stone
1
-
-
65mm dia GI pipes for inlet connection.
75
-
-
65mm dia GI elbow
5
-
-
65mm dia GI Flange set
2
-
-
65mm dia GI coupling
8
-
-
80mm dia GI pipes
15
-
-
90mm dia PVC Threaded coupler
2
-
-
80mm dia GI Tee
2
-
-
80mm dia GI elbow
2
-
-
80mm dia GM Gate valve
3
-
-
80mm dia GI Flange set
2
-
-
80mm dia GI coupling
2
-
-
80mm dia GI Dummy
1
-
-
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
1
-
-
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
56.58
-
-
Providing hand rails over the roof slab by using 32mm GI pipe with 40mm x 6mm MS flat and fixed with 12mm dia fastner bolt 75mm long and as directed by TWAD officers
1
-
-
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
2.55
-
-
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
3.97
-
-
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
3.85
-
-
Cement concrete in 1:2:4 mix using 20 mm metal used for Wearing Coat including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
2.5
-
-
Brick Work in Cement Mortar 1:5 using Country Bricks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
1.41
-
-
Plastering with cement mortar 1:3mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
11.84
-
-
40mm Metal
0.19
-
-
20mm Metal
0.19
-
-
Rcc Precast rings
3
-
-
Ring and RCC Cover Slab
1
-
-
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with
2.72
-
-
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
0.84
-
-
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
0.73
-
-
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
0.59
-
-
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
1.88
-
-
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture.
3.38
-
-
Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete.
4.75
-
-
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
38.14
-
-
Flooring with Granolithic flooring to 25mm using CC 1:2:4 mix using 20mm thick inckuding all chargesetc.,
7.57
-
-
Painting the newly plastering wall surface with two coats of plastic Emulsion Paint including cost and conveyance of all materials and all other labour charges etc., complete.
40.15
-
-
Painting two coats with ready mix paint of approved colour and trade for doors & windows including cost and conveyance of all materials and all other labour charges etc., complete.
3.78
-
-
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
2.92
-
-
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
4.45
-
-
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
0.07
-
-
Supplying Steel Door and windows as per standard specification
1
-
-
Towards Labour charges for Fixing of Steel Doors
1.89
-
-
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accessaries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 18
2
-
-
Supply and fixing of 15w CFL Lamp (spiral lamp) for existing holder on wall etc complete.
1
-
-
Supply and fixing of 16amps DP Switch with metal clod of 500v with tube connection 32Amps and netural on suitable T.W Plug plante with supplying on reeper on Either side With PWD Earthen etc.
1
-
-
Supply and run of 2 of 6s.qm 84/100 pvc SC Unstrenthed on condition of 1100v grade in 25mm side GI Pipe lend with both ends with necssary angles etc
3
-
-
Supply and run of 2 of 6s.qm 84/103 pvc SC Unstrenthed on condition of 1100v on 7/70 GI Reducer with fuse service connection etc
12
-
-
Towards cost and supply of RCC Jolly of size 0.60*0.60m
1
-
-
Provision for Platform arrangements
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?