Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 May 2024
Closing Date16 Jul 2024
Tender Amount₹ 5,00,62,000 
Notes
Download

Costs

Summary

Thoothukudi District - Pmgsy Iii-batch-i 2023-24 Package No Tn 25-124 Mrl16-palayamkottai- Aruppukottai Road To Sivagnanapuram Via Muthuramalingapuram,t

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km : 0/0 - 3/150 & 5/200 - 8/960

8596.05

-

-

... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
Km. 0/0 - 1/0

1036.78

-

-

... More
Km. 1/0 - 2/0

1031.86

-

-

... More
Km. 2/0 - 3/0

1074.29

-

-

... More
Km. 3/0 - 3/150

148.64

-

-

... More
Km. 5/200 - 6/0

826.25

-

-

... More
Km. 6/0 - 7/0

1060.66

-

-

... More
Km. 7/0 - 8/0

1076.93

-

-

... More
Km. 8/0 - 8/960

1018.8

-

-

... More
Construction of Embankment with gravel fly ash with gravel obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(Shoulder Strengthening)

-

-

-

... More
Km. 0/0 - 1/0

560.02

-

-

... More
Km. 1/0 - 2/0

552.34

-

-

... More
Km. 2/0 - 3/0

562.5

-

-

... More
Km. 3/0 - 3/150

84.38

-

-

... More
Km. 5/200 - 6/0

447.02

-

-

... More
Km. 6/0 - 7/0

559.46

-

-

... More
Km. 7/0 - 8/0

562.5

-

-

... More
Km. 8/0 - 8/960

540

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).

-

-

-

... More
Km. 0/0 - 0/1

62.22

-

-

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

-

-

-

... More
Km. 0/0 - 1/0

189.99

-

-

... More
Km. 1/0 - 2/0

189.1

-

-

... More
Km. 2/0 - 3/0

187.5

-

-

... More
Km. 3/0 - 3/150

31.51

-

-

... More
Km. 5/200 - 6/0

157.55

-

-

... More
Km. 6/0 - 7/0

187.78

-

-

... More
Km. 7/0 - 8/0

187.5

-

-

... More
Km. 8/0 - 8/960

184.43

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Medium Porosity

-

-

-

... More
Km. 0/0 - 1/0

3385.08

-

-

... More
Km. 1/0 - 2/0

3781.95

-

-

... More
Km. 2/0 - 3/0

3750

-

-

... More
Km. 3/0 - 3/150

630

-

-

... More
Km. 5/200 - 6/0

3151.17

-

-

... More
Km. 6/0 - 7/0

3755.62

-

-

... More
Km. 7/0 - 8/0

3750

-

-

... More
Km. 8/0 - 8/960

3688.33

-

-

... More
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).

-

-

-

... More
Km. 0/0 - 1/0

3816.33

-

-

... More
Km. 1/0 - 2/0

3849.68

-

-

... More
Km. 2/0 - 3/0

3750

-

-

... More
Km. 3/0 - 3/150

630

-

-

... More
Km. 5/200 - 6/0

3171.05

-

-

... More
Km. 6/0 - 7/0

3775.87

-

-

... More
Km. 7/0 - 8/0

3750

-

-

... More
Km. 8/0 - 8/960

3688.33

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

-

-

-

... More
Km. 0/0 - 0/1

414.75

-

-

... More
Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING].

-

-

-

... More
Km. 0/0 - 1/0

3816.33

-

-

... More
Km. 1/0 - 2/0

3849.68

-

-

... More
Km. 2/0 - 3/0

3750

-

-

... More
Km. 3/0 - 3/150

630

-

-

... More
Km. 5/200 - 6/0

3171.05

-

-

... More
Km. 6/0 - 7/0

3775.87

-

-

... More
Km. 7/0 - 8/0

3750

-

-

... More
Km. 8/0 - 8/960

3688.33

-

-

... More
NEW TECHNOLOGY [RBI]

-

-

-

... More
Providing, Laying and Spreading Base Course on a prepared surface, including mixing of 50% 22.4 mm Down Aggregate, 50% Stone Dust and 2.5% RBI -81 by mix in place with rotavator and grading with motor grader and compacting with 8-10 tonne Vibratory Compactor at OMC to the desired density as per specifications MoRTH 403.

-

-

-

... More
Km. 0/1 - 1/0

338.51

-

-

... More
Km. 1/0 - 2/0

378.2

-

-

... More
Km. 2/0 - 3/0

375

-

-

... More
Km. 3/0 - 3/150

63

-

-

... More
Km. 5/200 - 6/0

315.13

-

-

... More
Km. 6/0 - 7/0

375.56

-

-

... More
Km. 7/0 - 8/0

375

-

-

... More
Km. 8/0 - 8/960

368.84

-

-

... More
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km. 0/0 - 1/0

1.13

-

-

... More
Km. 1/0 - 2/0

2.81

-

-

... More
Km. 5/200 - 6/0

3.94

-

-

... More
Km. 6/0 - 7/0

1.13

-

-

... More
Km. 8/0 - 8/960

1.13

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

1382

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

180

-

-

... More
Provision for Name Board

1

-

-

... More
Provision for PMGSY Logo Board

5

-

-

... More
Provision for Sign Board (1 curve =2Nos)

36

-

-

... More
Provision for Chevron Sign Octogan Board (90cm)

2

-

-

... More
Provision for 60 cm Circle(Mandatory Sign Baoard)

4

-

-

... More
Metal Bracket with type IX Flotoscent Prismatic reflective Sheeting

28

-

-

... More
Provision for Citizen Information Board

2

-

-

... More
Provision for Maintenance Board

2

-

-

... More
Provision for KM Stone

6

-

-

... More
Provision for HM Stone

28

-

-

... More
Construction of 1.5 m SPAN RCC Slab culvert at Ch 5210,

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Deck

2.36

-

-

... More
Removal of Abutment & Wings

12.75

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

86.41

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

7.62

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

10.16

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 5210,

51.12

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 5210,

29.12

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

0.35

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 5210,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 5210,

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5mCulvert @ Ch. 5210,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5mCulvert @ Ch. 5210,

9.25

-

-

... More
Construction of 3.0 m SPAN RCC Slab culvert at Ch 450,

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Pipes

15

-

-

... More
Removal of Body wall

2.1

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
3.0m Culvert @ Ch. 450,

91.61

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
3.0m Culvert @ Ch. 450,

8.09

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
3.0m Culvert @ Ch. 450,

10.78

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.For Footings as 4% Rate for Centering Works

-

-

-

... More
3.0m Culvert @ Ch. 450,

52.52

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works

-

-

-

... More
3.0m Culvert @ Ch. 450,

34.66

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
3.0m Culvert @ Ch. 450,

3.9

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
3.0m Culvert @ Ch. 450,

8.1

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
3.0m Culvert @ Ch. 450,

0.88

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
3.0m Culvert @ Ch. 450,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
3.0m Culvert @ Ch. 450,

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
3.0m Culvert @ Ch. 450,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
3.0m Culvert @ Ch. 450,

9.25

-

-

... More
Construction of 5.0 m SPAN RCC Slab culvert at Ch 1800,

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 1800

-

-

-

... More
Removal of Pipes

15

-

-

... More
Removal of Body wall

2.1

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

143.72

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

12.68

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

16.9

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
5.0mCulvert @ Ch. 1800,

88.19

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works

-

-

-

... More
5.0mCulvert @ Ch. 1800,

61.23

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications including centering and shuttering.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

22.75

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

2.08

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
5.0mCulvert @ Ch. 1800,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
5.0mCulvert @ Ch. 1800,

6

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
5.0mCulvert @ Ch. 1800,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
5.0mCulvert @ Ch. 1800,

13.27

-

-

... More
Construction of 2 x 5.0 m SPAN RCC Slab culvert at Ch 1150,

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Deck

36

-

-

... More
Removal of Abutment & Wings

12.75

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

186.95

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

16.5

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

22

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

110.59

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

65.29

-

-

... More
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

41.14

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

4.06

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

22.5

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

9.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
2 x 5.0mCulvert @ Ch. 1150,

10.43

-

-

... More
Construction of , 20, 30, 20 m Retaining wall at Ch 450, 1150, 1800

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

24

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

42

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

28

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

3.6

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

6.3

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

4.2

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

3.6

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

6.3

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

4.2

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

6

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

10.8

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

7.2

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

11.5

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

30.38

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

20.25

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

-

-

-

... More
Protective works@ Ch.450 - 470 LHS

13

-

-

... More
Protective works@ Ch.1150 - 1165 B/S

20

-

-

... More
Protective works@ Ch.1800 - 1820 RHS

13

-

-

... More
Construction of 20 mToe wall at Ch 3130

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Protective works@ Ch.3130 - 3150 RHS

17.85

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works@ Ch.3130 - 3150 RHS

2.55

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works@ Ch.3130 - 3150 RHS

2.55

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.3130 - 3150 RHS

3.9

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.3130 - 3150 RHS

8.1

-

-

... More
Construction of Wearing Coat with the length of 30 at ch 3120

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Exist.CC @ Ch. 3120

45

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

-

-

-

... More
Wearing Coat @ Ch. 3120

38.25

-

-

... More
Provision of Guard Stones

-

-

-

... More
Wearing Coat @ Ch. 3120

32

-

-

... More
Routine Maintenance after completion of work

-

-

-

... More
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.

-

-

-

... More
For the First Year from the date of completion of work

6.91

-

-

... More
For the Second Year from the date of completion of work

6.91

-

-

... More
For the Third Year from the date of completion of work

6.91

-

-

... More
For the Fourth Year from the date of completion of work

6.91

-

-

... More
For the Fifth Year from the date of completion of work

6.91

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.