Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Jan 2025
Closing Soon5 Feb 2025
Tender Amount₹ 1,89,50,000 
Notes
Download

Costs

Summary

Strengthening The Appadurai Thiruvai Amman Kovil To Esanakorai Thandankorai Road Km0/0-1.84 R 232 Package 4i Thiruvai Amman Kovil To Esanakorai Thandankorai Road Km0/0-1.84.r 232 Package 4

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KM 1/000-1/900

121.5

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. km 0/0-1/000

450

-

-

... More
KM 1/000-1/900

405

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.km 0/0 -1/00

3000

-

-

... More
KM 1/000-1/900

2700

-

-

... More
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete km 0/0 - 1/000

3000

-

-

... More
KM 1/000-1/900

2700

-

-

... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0-1/000

75

-

-

... More
KM 1/000-1/900

67.5

-

-

... More
Provision for Name Board Charges

1

-

-

... More
Provision for 60 Cm Equilaterak triangle cautionary signboard

9

-

-

... More
Provision for 60cm Circule Mandatory Sigh Board

2

-

-

... More
Provision for Chevron sigh 90cm octogon (Curves)

1

-

-

... More
Provision for Reflector (Near Culvert & Tree)- Star Sign sticker

10

-

-

... More
Provision for HM Stone

8

-

-

... More
Provision for KM Stone

1

-

-

... More
Provision for Photographic Charges

1

-

-

... More
Provision for Road Marker/ Road Stud With Lens Reflector

175

-

-

... More
Provision for Road Marking with Hot Applied ThermoplasticComponand With Reflectorising Glass Beads On Bituminous Surface

380

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-50- Ch-118m

179.52

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-50- Ch-118m

10.88

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-50- Ch-118m

16.32

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-50- Ch-118m

469.39

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-50- Ch-118m

237.49

-

-

... More
Wheep holes in Retaining Wall Ch-50- Ch-118m

36.55

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-200- Ch-300m

245

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-200- Ch-300m

14

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-200- Ch-300m

21

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-200- Ch-300m

585.35

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-200- Ch-300m

267.5

-

-

... More
Wheep holes in Retaining Wall Ch-200- Ch-300m

53.75

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-320- Ch-400m

196

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-320- Ch-400m

11.2

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-320- Ch-400m

16.8

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-320- Ch-400m

469.35

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-320- Ch-400m

214

-

-

... More
Wheep holes in Retaining Wall Ch-320- Ch-400m

43

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-415- Ch-446m

62.78

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-415- Ch-446m

4.65

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-415- Ch-446m

6.98

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-415- Ch-446m

152.72

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-415- Ch-446m

64.88

-

-

... More
Wheep holes in Retaining Wall Ch-415- Ch-446m

17.2

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-900- Ch-975m

192.38

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-900- Ch-975m

14.25

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-900- Ch-975m

21.38

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-900- Ch-975m

548.15

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-900- Ch-975m

302.06

-

-

... More
Wheep holes in Retaining Wall Ch-900- Ch-975m

40.85

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-1100- Ch-1130m

55.2

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-1100- Ch-1130m

4.8

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-1100- Ch-1130m

7.2

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-1100- Ch-1130m

210.99

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-1100- Ch-1130m

104.78

-

-

... More
Wheep holes in Retaining Wall Ch-1100- Ch-1130m

6.45

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B Retaining Wall Ch-1500- Ch-1565m

104.65

-

-

... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch-1500- Ch-1565m

9.1

-

-

... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .Ch-1500- Ch-1565m

13.65

-

-

... More
Centering charges for the wall sides and deck slab sides to site including labour charges Ch-1500- Ch-1565m

382.35

-

-

... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete Ch-1500- Ch-1565m

173.88

-

-

... More
Wheep holes in Retaining Wall Ch-1500- Ch-1565m

35.48

-

-

... More
Towards the charges for routline maintenance of the road work executed under NABARD XXX including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work

1.9

-

-

... More
For the Second Year from the date of completion of work

1.9

-

-

... More
For the Third Year from the date of completion of work

1.9

-

-

... More
For the Fourth Year from the date of completion of work

1.9

-

-

... More
For the Fifth Year from the date of completion of work

1.9

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.