Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 May 2024
Closing Date22 Jul 2024
Tender Amount₹ 13,13,85,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
in Km. 7/0 - 14/0

16800

-

-

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
in Km. 0/0 - 7/0

8746.37

-

-

... More
in Km. 7/0 - 14/0

8750

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Km 0/0 to 1/0

200

-

-

... More
Km 1/0 to 2/0

200

-

-

... More
Km 2/0 to 3/0

200

-

-

... More
Km 3/0 to 4/0

200

-

-

... More
Km 4/0 to 5/0

200

-

-

... More
Km 5/0 to 6/0

200

-

-

... More
Km 6/0 to 7/0

200

-

-

... More
Km 7/0 to 8/0

200

-

-

... More
Km 8/0 to 9/0

200

-

-

... More
Km 9/0 to 10/0

200

-

-

... More
Km 10/0 to 11/0

200

-

-

... More
Km 11/0 to 12/0

200

-

-

... More
Km 12/0 to 13/0

200

-

-

... More
Km 13/0 to 14/0

200

-

-

... More
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
Km 0/0 to 1/0

200

-

-

... More
Km 1/0 to 2/0

200

-

-

... More
Km 2/0 to 3/0

200

-

-

... More
Km 3/0 to 4/0

200

-

-

... More
Km 4/0 to 5/0

200

-

-

... More
Km 5/0 to 6/0

200

-

-

... More
Km 6/0 to 7/0

200

-

-

... More
Km 7/0 to 8/0

200

-

-

... More
Km 8/0 to 9/0

200

-

-

... More
Km 9/0 to 10/0

200

-

-

... More
Km 10/0 to 11/0

200

-

-

... More
Km 11/0 to 12/0

200

-

-

... More
Km 12/0 to 13/0

200

-

-

... More
Km 13/0 to 14/0

200

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Carted Earth)

-

-

-

... More
Km 0/0 to 1/0

1265

-

-

... More
Km 1/0 to 2/0

1244.08

-

-

... More
Km 2/0 to 3/0

1250.18

-

-

... More
Km 3/0 to 4/0

1289.79

-

-

... More
Km 4/0 to 5/0

1272.15

-

-

... More
Km 5/0 to 6/0

1255.58

-

-

... More
Km 6/0 to 7/0

1033.98

-

-

... More
Km 7/0 to 8/0

1065.81

-

-

... More
Km 8/0 to 9/0

1159.3

-

-

... More
Km 9/0 to 10/0

1144.96

-

-

... More
Km 10/0 to 11/0

1098.73

-

-

... More
Km 11/0 to 12/0

1152.01

-

-

... More
Km 12/0 to 13/0

1160.91

-

-

... More
Km 13/0 to 14/0

1108.1

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km 0/0 to 1/0

168.75

-

-

... More
Km 1/0 to 2/0

167.77

-

-

... More
Km 2/0 to 3/0

168.75

-

-

... More
Km 3/0 to 4/0

168.75

-

-

... More
Km 4/0 to 5/0

168.75

-

-

... More
Km 5/0 to 6/0

168.75

-

-

... More
Km 6/0 to 7/0

168.75

-

-

... More
Km 7/0 to 8/0

168.75

-

-

... More
Km 8/0 to 9/0

168.75

-

-

... More
Km 9/0 to 10/0

168.75

-

-

... More
Km 10/0 to 11/0

168.75

-

-

... More
Km 11/0 to 12/0

168.75

-

-

... More
Km 12/0 to 13/0

168.75

-

-

... More
Km 13/0 to 14/0

168.75

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density

-

-

-

... More
Km 0/0 to 1/0

570.56

-

-

... More
Km 1/0 to 2/0

560.87

-

-

... More
Km 2/0 to 3/0

569.74

-

-

... More
Km 3/0 to 4/0

562.5

-

-

... More
Km 4/0 to 5/0

569.69

-

-

... More
Km 5/0 to 6/0

575.01

-

-

... More
Km 6/0 to 7/0

578.48

-

-

... More
Km 7/0 to 8/0

565.92

-

-

... More
Km 8/0 to 9/0

571.77

-

-

... More
Km 9/0 to 10/0

575.78

-

-

... More
Km 10/0 to 11/0

567.4

-

-

... More
Km 11/0 to 12/0

573.26

-

-

... More
Km 12/0 to 13/0

562.5

-

-

... More
Km 13/0 to 14/0

586.52

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km 0/0 to 1/0

3803.74

-

-

... More
Km 1/0 to 2/0

3739.12

-

-

... More
Km 2/0 to 3/0

3798.25

-

-

... More
Km 3/0 to 4/0

3750

-

-

... More
Km 4/0 to 5/0

3797.99

-

-

... More
Km 5/0 to 6/0

3833.45

-

-

... More
Km 6/0 to 7/0

3856.56

-

-

... More
Km 7/0 to 8/0

3772.8

-

-

... More
Km 8/0 to 9/0

3811.81

-

-

... More
Km 9/0 to 10/0

3838.52

-

-

... More
Km 10/0 to 11/0

3782.64

-

-

... More
Km 11/0 to 12/0

3821.74

-

-

... More
Km 12/0 to 13/0

3750

-

-

... More
Km 13/0 to 14/0

3910.06

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km 0/0 to 1/0

3803.74

-

-

... More
Km 1/0 to 2/0

3750

-

-

... More
Km 2/0 to 3/0

3798.25

-

-

... More
Km 3/0 to 4/0

3750

-

-

... More
Km 4/0 to 5/0

3797.99

-

-

... More
Km 5/0 to 6/0

3833.45

-

-

... More
Km 6/0 to 7/0

3856.56

-

-

... More
Km 7/0 to 8/0

3772.8

-

-

... More
Km 8/0 to 9/0

3811.81

-

-

... More
Km 9/0 to 10/0

3838.52

-

-

... More
Km 10/0 to 11/0

3782.64

-

-

... More
Km 11/0 to 12/0

3821.74

-

-

... More
Km 12/0 to 13/0

3750

-

-

... More
Km 13/0 to 14/0

3910.06

-

-

... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Using Waste Plastic 6%)

-

-

-

... More
Km 0/0 to 1/0

190.19

-

-

... More
Km 1/0 to 2/0

186.96

-

-

... More
Km 2/0 to 3/0

189.92

-

-

... More
Km 3/0 to 4/0

187.5

-

-

... More
Km 4/0 to 5/0

189.9

-

-

... More
Km 5/0 to 6/0

191.67

-

-

... More
Km 6/0 to 7/0

192.83

-

-

... More
Km 7/0 to 8/0

188.64

-

-

... More
Km 8/0 to 9/0

190.59

-

-

... More
Km 9/0 to 10/0

191.92

-

-

... More
Km 10/0 to 11/0

189.14

-

-

... More
Km 11/0 to 12/0

191.08

-

-

... More
Km 12/0 to 13/0

187.5

-

-

... More
Km 13/0 to 13/900

176.75

-

-

... More
Mix Seal Surfacing Using Waste Plastic:-Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 510

-

-

-

... More
Km 0/0 to 1/0

3803.74

-

-

... More
Km 1/0 to 2/0

3750

-

-

... More
Km 2/0 to 3/0

3798.25

-

-

... More
Km 3/0 to 4/0

3750

-

-

... More
Km 4/0 to 5/0

3797.99

-

-

... More
Km 5/0 to 6/0

3833.45

-

-

... More
Km 6/0 to 7/0

3856.56

-

-

... More
Km 7/0 to 8/0

3772.8

-

-

... More
Km 8/0 to 9/0

3811.81

-

-

... More
Km 9/0 to 10/0

3838.52

-

-

... More
Km 10/0 to 11/0

3782.64

-

-

... More
Km 11/0 to 12/0

3821.74

-

-

... More
Km 12/0 to 13/0

3750

-

-

... More
Km 13/0 to 13/900

3535.06

-

-

... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81

-

-

-

... More
Km 0/0 to 1/0

5.62

-

-

... More
Km 1/0 to 2/0

5.62

-

-

... More
Km 2/0 to 3/0

5.62

-

-

... More
Km 3/0 to 4/0

5.62

-

-

... More
Km 4/0 to 5/0

5.62

-

-

... More
Km 5/0 to 6/0

5.62

-

-

... More
Km 6/0 to 7/0

5.62

-

-

... More
Km 7/0 to 8/0

5.62

-

-

... More
Km 8/0 to 9/0

5.62

-

-

... More
Km 9/0 to 10/0

5.62

-

-

... More
Km 10/0 to 11/0

5.62

-

-

... More
Km 11/0 to 12/0

5.62

-

-

... More
Km 12/0 to 13/0

5.62

-

-

... More
Km 13/0 to 14/0

5.62

-

-

... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803

-

-

-

... More
Km 0/0 to 1/0

200

-

-

... More
Km 1/0 to 2/0

200

-

-

... More
Km 2/0 to 3/0

200

-

-

... More
Km 3/0 to 4/0

200

-

-

... More
Km 4/0 to 5/0

200

-

-

... More
Km 5/0 to 6/0

200

-

-

... More
Km 6/0 to 7/0

200

-

-

... More
Km 7/0 to 8/0

200

-

-

... More
Km 8/0 to 9/0

200

-

-

... More
Km 9/0 to 10/0

200

-

-

... More
Km 10/0 to 11/0

200

-

-

... More
Km 11/0 to 12/0

200

-

-

... More
Km 12/0 to 13/0

200

-

-

... More
Km 13/0 to 14/0

200

-

-

... More
Providing and Fixing 'Logo' of PMGSY project

8

-

-

... More
Providing and Fixing Name Board project

2

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY project

2

-

-

... More
Providing and fixing 'Maintanence information Board' of PMGSY Project

3

-

-

... More
Providing and fixing of cautionary, mandatory and in formatory sign Board Providing and fixing of Retro Reflectorised Cautionary, Mandatory signs with definition plate made out of high intensity Grade prismatic sheeting coiformation to IRC-67:2010 & ASTM D, Type IVspecification and fixed over 1.5mm thick Aluminium sheet fixed on back support frame of 25mm x 25mm x3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm below ground level etc complete including 7years warrenty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 specification(as per MORT & spec. No. 801)

-

-

-

... More
90CM Equilateral Trainagle (Cautinary) Sign Board

28

-

-

... More
60CM Circular (Mandatory) Sign Board

42

-

-

... More
Chevron Signs 90Cm Octagon (Curves)

59

-

-

... More
Kilometre stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703

-

-

-

... More
i) Ordanary Kilometer Stone (Precast)

14

-

-

... More
ii) 200m Stone

56

-

-

... More
iii) Guard Stone

148

-

-

... More
NP3 Spun Pipe (28 Nos)

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

117.6

-

-

... More
RCC non Pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistent cement with 12mm HI - alimina lining with rubber rings joints.

168

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

6.44

-

-

... More
Protective Works Km 2/0 to 3/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

72

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

14.4

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

19.2

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

35.1

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

84.98

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

120

-

-

... More
Protective Works Km 5/0 to 6/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

67.5

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

13.5

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

18

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

32.4

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

68.86

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

120

-

-

... More
Protective Works Km 6/0 to 7/0

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

58.5

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

11.7

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

15.6

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing

27

-

-

... More
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall

42.6

-

-

... More
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7

120

-

-

... More
V shape Drain

-

-

-

... More
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side

-

-

-

... More
V Shape Drain- 0/0 to 14/0

2150

-

-

... More
Providing concrete for Plain/reinforced concrete in open foundations & Sub structure Nominal Mix 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers., compacting etc., complete complying with standard specifications as per drawings and technical specififcations clause 802, 803, 1202 & 1203 and as directed. Below Ground Level Footing:-

-

-

-

... More
V Shape Drain- 0/0 to 1/0

110

-

-

... More
V Shape Drain- 1/0 to 2/0

110

-

-

... More
V Shape Drain- 2/0 to 3/0

110

-

-

... More
V Shape Drain- 3/0 to 4/0

110

-

-

... More
V Shape Drain- 4/0 to 5/0

110

-

-

... More
V Shape Drain- 5/0 to 6/0

110

-

-

... More
V Shape Drain- 6/0 to 7/0

110

-

-

... More
V Shape Drain- 7/0 to 8/0

110

-

-

... More
V Shape Drain- 8/0 to 9/0

110

-

-

... More
V Shape Drain- 9/0 to 10/0

110

-

-

... More
V Shape Drain- 10/0 to 11/0

110

-

-

... More
V Shape Drain- 11/0 to 12/0

110

-

-

... More
V Shape Drain- 12/0 to 13/0

110

-

-

... More
V Shape Drain- 13/0 to 14/0

110

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Base Course)

-

-

-

... More
V Shape Drain- 0/0 to 1/0

60

-

-

... More
V Shape Drain- 1/0 to 2/0

60

-

-

... More
V Shape Drain- 2/0 to 3/0

60

-

-

... More
V Shape Drain- 3/0 to 4/0

60

-

-

... More
V Shape Drain- 4/0 to 5/0

60

-

-

... More
V Shape Drain- 5/0 to 6/0

60

-

-

... More
V Shape Drain- 6/0 to 7/0

60

-

-

... More
V Shape Drain- 7/0 to 8/0

60

-

-

... More
V Shape Drain- 8/0 to 9/0

60

-

-

... More
V Shape Drain- 9/0 to 10/0

60

-

-

... More
V Shape Drain- 10/0 to 11/0

60

-

-

... More
V Shape Drain- 11/0 to 12/0

45

-

-

... More
V Shape Drain- 12/0 to 13/0

45

-

-

... More
V Shape Drain- 13/0 to 14/0

45

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

-

-

-

... More
V Shape Drain- 0/0 to 1/0

60

-

-

... More
V Shape Drain- 1/0 to 2/0

60

-

-

... More
V Shape Drain- 2/0 to 3/0

60

-

-

... More
V Shape Drain- 3/0 to 4/0

60

-

-

... More
V Shape Drain- 4/0 to 5/0

60

-

-

... More
V Shape Drain- 5/0 to 6/0

60

-

-

... More
V Shape Drain- 6/0 to 7/0

60

-

-

... More
V Shape Drain- 7/0 to 8/0

60

-

-

... More
V Shape Drain- 8/0 to 9/0

60

-

-

... More
V Shape Drain- 9/0 to 10/0

60

-

-

... More
V Shape Drain- 10/0 to 11/0

60

-

-

... More
V Shape Drain- 11/0 to 12/0

45

-

-

... More
V Shape Drain- 12/0 to 13/0

45

-

-

... More
V Shape Drain- 13/0 to 14/0

45

-

-

... More
Towards the charges for routine maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

14

-

-

... More
For the Second Year from the date of completion of work

14

-

-

... More
For the Third Year from the date of completion of work

14

-

-

... More
For the Fourth Year from the date of completion of work

14

-

-

... More
For the Fifth Year from the date of completion of work

14

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.