Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date6 Dec 2024
Closing Date11 Dec 2024
Tender Amount₹ 20,00,000
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_508232_1Bid Award Id
ViewTender No
RocNo_2288_2024_A2_26_07_2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
3.46
-
-
... More
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
-
-
-
... More
For items 1.5m to 4.5m below GL
7.59
-
-
... More
For items 0 to 1.50m below GL
1.75
-
-
... More
For items 0m to 4.5m above GL
2.83
-
-
... More
For items 4.51m to 7.32m above GL
2.23
-
-
... More
For items 7.32m to 10.98m above GL
2.53
-
-
... More
For items 10.93m to 14.64 m above GL
11.35
-
-
... More
For items 14.64m to 18.30 m above GL
3.09
-
-
... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
-
-
-
... More
I) PLANE SURFACES
-
-
-
... More
Below G.L.
19.93
-
-
... More
Above G.L to 3.30
25.98
-
-
... More
5.30m to 6.30
12.02
-
-
... More
8.30 yo 9.30
12.02
-
-
... More
11.31 to 12.30
38.75
-
-
... More
Curved Surface
-
-
-
... More
0 to 3.30m from floor level
82.73
-
-
... More
Square column Below G.L.
6.48
-
-
... More
Ground level to 3.30 m
15.12
-
-
... More
Square column 3.31 to 4.30 m
4.8
-
-
... More
Square column 4.31 to 5.30m
4.8
-
-
... More
Square column 5.31 to 6.30m
4.08
-
-
... More
Square column 6.31 to 7.30m
4.8
-
-
... More
Square column 7.31 to 8.30m
4.8
-
-
... More
Square column 8.31 to 9.30m
4.08
-
-
... More
Square column 9.31 to 10.30m
4.8
-
-
... More
Square column 10.31 to 11.30 m
4.8
-
-
... More
Square column 11.31 to 12.30m
0.72
-
-
... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
176.27
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
3.85
-
-
... More
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
1
-
-
... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc.
-
-
-
... More
RCC 1:1.5:3 using 20mm HBG Stone
0.31
-
-
... More
Shuttering Charges by using MS Angle and MS Sheet
4.48
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
0.04
-
-
... More
Providing PVC Ventilation arrangement 2 nos mosquito proof nylon net with 65 mm GI pipe and spls as directed by the Departmental officers 1 m 65 mm Gi pipe, 4 nos 65 mm Gi elbow , 4nos cutting and 8 nos threading and 2 nos 65 mm GI tee
2
-
-
... More
Providing cut stone slab in CM 1:3 and as directed by Departmental officers
1
-
-
... More
Providing hand rails over the Roof slab by using 32 mm GI pipe with 40 mm *6 mm MS Flat and fixed with 12mm dia Fastner Bolt 75mm long and as directed by Deparemental officers
-
-
-
... More
Supply and delivery of 32mm GI Pipes 1(Medium) for Hand Rails over roof cover slab
-
-
-
... More
Vertical pipes at 0.45m spacing (3.142* 5.34m/ 0.45=38 nos)
34.2
-
-
... More
Horizontal pipes over Vertical pipes (3.142*5.34m=16.77m)
16.77
-
-
... More
Supply and delivery of MS Base plate 40*6 mm thick for Hand Rails at 0.45 m height (Horizontal) Weight 1.99 Kg/m =3.14*5.34 m=16.77 m
-
-
-
... More
Total Weight 16.77 m*1.90Kg=30.86 Kg
31.86
-
-
... More
Supply and delivery of MS Baase plate of 100*100*6 mm thick over cover slab for fixing of 32mm GI Pipes (Medium) Pipes vertical (approximately 0.750 grams for each)
38
-
-
... More
Supply and fixing of Anchor fastner bolt 12 mm dia of 75 mm long in the base plates
152
-
-
... More
Labour charges for Fabrication of MS flates and GI Pipes
-
-
-
... More
32 mm dia GI Pipes cutting charges
38
-
-
... More
32 mm dia GI Pipes Welding charges
76
-
-
... More
MS Plates cutting charges
38
-
-
... More
MS Plates Welding charges
38
-
-
... More
Pinting of Iron works
-
-
-
... More
MS Flates (40*6 mm) 80+12=92 mm
4.03
-
-
... More
32 mm dia GI Pipes Horizontal (3.142*16.77 m*0.034 m= 1.79 sqm) and 32 mm dia GI Pipes Vertical =38 nos*0.90 m*0.034m-1.16sqm(1.79+1.16= sundries
2.95
-
-
... More
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications
1
-
-
... More
Provision for pipe connection arrangements
-
-
-
... More
65mm GI pipe for over flow &1 *1
18
-
-
... More
65mm GI pipe for over flow &1 *1
18
-
-
... More
50mm dia GI scour pipe 1*1
18
-
-
... More
65mm dia GI pipe for delivery 1*1 pipe
18
-
-
... More
90mmX 80dia PVC threaded coupler
2
-
-
... More
65mm dia PVC threaded coupler
2
-
-
... More
65mm dia GI tee
5
-
-
... More
65mm dia GI 90◦ bend
9
-
-
... More
65mm dia GI coupler
9
-
-
... More
65mm dia GI union
1
-
-
... More
65mm dia GI elbow
1
-
-
... More
75 mm * 63mm PVC Reducer
1
-
-
... More
75mm*63mm PVC Reducer
1
-
-
... More
75mm X 63mm PVC threaded coupler
2
-
-
... More
75 mm PVC Reducer
1
-
-
... More
75x63 PVC reducer
1
-
-
... More
65mm dia GM gate valve
3
-
-
... More
50 mm dia GM gate valve
2
-
-
... More
50 mm dia GM Coupler
3
-
-
... More
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers.
44.41
-
-
... More
Provision for Soak pit as per sub estimate
-
-
-
... More
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
0.85
-
-
... More
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
0.05
-
-
... More
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
0.08
-
-
... More
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
0.79
-
-
... More
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
0.06
-
-
... More
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
1.91
-
-
... More
Provision for Fencing as per sub estimate
-
-
-
... More
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
1.23
-
-
... More
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour chagres for mixing, laying, cmpacting and curing etc., complete.
0.44
-
-
... More
Supply and erection of centering for sides and soffits including all labour charge
3.06
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
0.07
-
-
... More
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
0.19
-
-
... More
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring
4.86
-
-
... More
Supply & fixing of Barbed wire including all cost and conveyance etc., all complete
120
-
-
... More
Supply & fixing of CHAIN LINK 2"X2" USING GAUGE Galvanised Iron wire (of all sizes)all cost and conveyance etc., all complete M0408
30
-
-
... More
Provision for erection charges for Precast concrete vertical post including all labour charges etc complete.,
1
-
-
... More
Provision for Grill Gate including all cost and all labour charges Fabricating supplying and Erecting in position mild steel angle iron trusses /MS channels including all cost and conveyance of men and materials, complete complying with standard specification
87.55
-
-
... More
Provsion for Photo charges
1
-
-
... More
Provsion for Name Board
1
-
-
... More
Provision for Chlorinator as per sub estimate
-
-
-
... More
90mm dia PVC pipe
0.6
-
-
... More
63mm dia PVC pipe
0.6
-
-
... More
32mm dia PVC pipe
0.6
-
-
... More
63 x20mm PVC saddle
1
-
-
... More
90 x63mm PVC reducer coupler
1
-
-
... More
63mm x 50mm PVC reducer coupler
1
-
-
... More
PVC gate valve 90mm dia
1
-
-
... More
PVC gate valve 63mm dia
1
-
-
... More
32mm PVC Elbow
3
-
-
... More
32mm PVC End cap
1
-
-
... More
90mm PVC End cap
1
-
-
... More
Cost of brackets for PVC pipes
2
-
-
... More
Labour charges for fixing the PVC pipes and specials including all charges
1
-
-
... More
Provision sub Estimate for Distribution Pipe line
-
-
-
... More
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
491.4
-
-
... More
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers.
491.4
-
-
... More
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
-
-
-
... More
63mm 4KSCPVC Pipe including laying and jointing,
780
-
-
... More
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
-
-
-
... More
63mm 4KSCPVC Pipe laying & jointing
780
-
-
... More
63mm PVC Elbow
8
-
-
... More
63mm PVC Tee
8
-
-
... More
63mm PVC End Cap
8
-
-
... More
63mmPVC Ball Valve
8
-
-
... More
Provision sub Estimate for Pumping Pipe line
-
-
-
... More
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
189
-
-
... More
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers.
189
-
-
... More
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
-
-
-
... More
75mm 6KSCPVC Pipe including laying and jointing,
300
-
-
... More
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
-
-
-
... More
75mm 6KSCPVC Pipe laying & jointing
300
-
-
... More
75mm PVC Elbow
3
-
-
... More
75mm PVC Tee
3
-
-
... More
75mm PVC End Cap
3
-
-
... More
75 mmPVC Ball Valve
3
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements