Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Eprocure
Opening Date5 Nov 2019
Closing Date20 Nov 2019
Tender Amount₹ 1,67,29,000
Costs
EMD
₹ 1,68,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_RDTN_143918_1Bid Award Id
ViewTender No
A3/4972/2019, Date.31.10.2019Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Km 0/0 - 1/0
120
-
-
... More
Km 1/0 - 1/100
12
-
-
... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/100
22.5
-
-
... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
-
-
-
... More
Km 0/0 - 1/100
3300
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km 0/0 - 1/0
3000
-
-
... More
Km 1/0 - 1/100
300
-
-
... More
Provision for Km stone
1
-
-
... More
Provision for Hm stone
4
-
-
... More
Provision for Sign board
2
-
-
... More
Provision for Name board
1
-
-
... More
2.Strengthening of the road from Vazhaikurichi to Harijana colony road Km 0/0 - 1/050
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
189
-
-
... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0 - 1/0
45
-
-
... More
Km 1/0 - 1/050
2.25
-
-
... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/050
11.25
-
-
... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/050
11.25
-
-
... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
-
-
-
... More
Km 0/0 - 1/050
3150
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km 0/0 - 1/0
3000
-
-
... More
Km 1/0 - 1/050
150
-
-
... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
62.81
-
-
... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
6.08
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
6.08
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
48.46
-
-
... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
3.36
-
-
... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
3.31
-
-
... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
46.14
-
-
... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block)
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
77.13
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 175m
0.35
-
-
... More
Provision for Km stone
1
-
-
... More
Provision for Hm stone
4
-
-
... More
Provision for Sign board
2
-
-
... More
Provision for Name board
1
-
-
... More
3.Strengthening of the road from Sripuranthan to Arankottai road Km 0/0 - 2/100
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
378
-
-
... More
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
2268
-
-
... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0 - 1/0
60
-
-
... More
Km 1/0 - 2/0
60
-
-
... More
Km 2/0 - 2/100
6
-
-
... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
281.25
-
-
... More
Km 1/0 - 2/0
281.25
-
-
... More
Km 2/0 - 2/100
28.13
-
-
... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
-
-
-
... More
Km 0/0 - 2/100
7875
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km 0/0 - 1/0
3750
-
-
... More
Km 1/0 - 2/0
3750
-
-
... More
Km 2/0 - 2/100
375
-
-
... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
62.81
-
-
... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
6.08
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
9.32
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
70.66
-
-
... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
3.36
-
-
... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
3.31
-
-
... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
61.2
-
-
... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block)
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
108.81
-
-
... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
0.33
-
-
... More
Gravel filling between including cost and conveyance of gravel labour charges for filling, watering, compacting etc., complete
-
-
-
... More
1.50 M RCC slab Culvert @ Ch 150m
17.16
-
-
... More
Provision for Km stone
2
-
-
... More
Provision for Hm stone
8
-
-
... More
Provision for Sign board
2
-
-
... More
Provision for Name board
1
-
-
... More
4.Strengthening of the road from Moorthiyan to Nayaganaipriyal road Km 0/0-1/200
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
1350
-
-
... More
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
2160
-
-
... More
Picking the 5 cm to 10 cm old metalled and BT wornout surface including all labour charges etc.,
1118
-
-
... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0 - 1/0
90
-
-
... More
Km 1/0 - 1/200
18
-
-
... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/350, 0/600, 0/800 - 1/000
225
-
-
... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/200
45
-
-
... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
-
-
-
... More
Km 0/0 - 1/200
3600
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km 0/0 - 1/0
3600
-
-
... More
Km 1/0 - 1/200
600
-
-
... More
Provision for Km stone
1
-
-
... More
Provision for Hm stone
5
-
-
... More
Provision for Sign board
5
-
-
... More
Provision for Name board
1
-
-
... More
5. Strengthening of the road from T.Palur to Koothankudi road Km 0/0-1/500
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers.
3600
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
1080
-
-
... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km 0/0 - 1/0
150
-
-
... More
Km 1/0 - 1/500
75
-
-
... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
183.75
-
-
... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/500
112.5
-
-
... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
-
-
-
... More
Km 0/0 - 1/0
225
-
-
... More
Km 1/0 - 1/500
112.5
-
-
... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
-
-
-
... More
Km 0/0 - 1/500
4500
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
-
-
-
... More
Km 0/0 - 1/0
3000
-
-
... More
Km 1/0 - 1/500
1500
-
-
... More
Provision for Km stone
1
-
-
... More
Provision for Hm stone
6
-
-
... More
Provision for Sign board
3
-
-
... More
Provision for Name board
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements