Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Building Construction
Eprocure
Opening Date30 Jun 2022
Closing Date29 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Karur District - Kulithalai Block - Infrastructure Development In Schools And Creating Public Utilities In Package No Tn 07 44 Under Agamt-ii 2021-22

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication

13.24

-

-

... More
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.

19.35

-

-

... More
Supplying and erecting centring for sides centering for soffits of rcc slabs of plane surface like lintels,beams etc, including strutting 3m high using mild steel sheeets of size 90cmx60cmxand BG 10 stiffened with M.S angles of size 25mmx25

63.15

-

-

... More
Above ground level

11.78

-

-

... More
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete

0.35

-

-

... More
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh

2.08

-

-

... More
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.

114.26

-

-

... More
plastering surface of rcc items such as slab, beam,sunshade with cement mortor 1:3 - 10mm thick including packing providing cement mortor beading for sunshades staircase, steps lands slabs etc, as directed by departmental officers etc, complete

7.2

-

-

... More
Plastering mix (one cement and four sand) 20mm thick including cost of labour charges etc completesdirected by departmental officers etc, complete complying with standard specifications.

17.9

-

-

... More
Supplying and fixing in position best Europeon Water Closet with all fittings and 10lit capacity flusing tank including cost and conveyance of all materials to site and all labour charges etc.

1

-

-

... More
Supplying and fixing in position Indian water closer of size 580x440mm white glazed earthen ware of approved quality with 'P' trap or 'S' trap confirming to IS:2556 -part XII with sand cushion and forming the closet using 40mm broken jelly in lime concrete flooring all round 1:2:5, 100m, thick and finishing the top to required slope and including giving necessary connection to cost iron soil pipes / pvc pipes by dismandeling brick masonry rcc concrete roof/floor slab and making good the disturbed portion to original condition without leakage etc., complete complyig with standard specification and as directed by departmental officers

1

-

-

... More
Supplying and fixing white glazed earthen ware Wash hand basin of size 550x400mm including cost and conveyance of all materials to site and all labour charges etc.

2

-

-

... More
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete

13

-

-

... More
Paving the floor with plain/design ceramic tiles (colour and shade as directed) of size 600 mm x 600mmx6mm in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement as

22.81

-

-

... More
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges

17.9

-

-

... More
Providing weathering course with best quality of brick Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thicknes

0.64

-

-

... More
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc

8.59

-

-

... More
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.

50.82

-

-

... More
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .

61.9

-

-

... More
Painting two coats of new iron work with best quality synthetic enamel paint of approved quality snd colour with priming coat including the cost all materials etc., Complete in all floors

5.4

-

-

... More
Fabricating Supply and fixing and position of MS doors with single leave the door outer frame will be 40x40x6mm ms MS angle intermediate stiffner will be 35x35x6mm with cross stiffner 25x25x5mm flats covered with 18gauge MS sheets with necessary hinges tower bolt aldrop length 30mm holdfastetc... completewith 1 coat of

5.4

-

-

... More
Towards supply and delivery of RCC Jolly specification

2

-

-

... More
Provision for Electrification etc., complete (a) Light point(SD17)

4

-

-

... More
Provision for Electrification etc., complete (b)Plug point(SD36)

4

-

-

... More
Provision for Electrification etc., complete (b) Light Fitting (SD87)

3

-

-

... More
Name of the Work : Providing Cycle Stand to the Govt. Higher Secondary school at Inungur H/O Inungur Panchayat.Kulithalai Union Karur District.

-

-

-

... More
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification

11.89

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.

13.67

-

-

... More
Supplying and fixing GI pipe 'B' class with all accessories etc., complete 80mm dia pipe

45.6

-

-

... More
Supplying and erecting centring for sides centering for soffits of rcc slabs of plane surface like lintels,beams etc, including strutting 3m high using mild steel sheeets of size 90cmx60cmxand BG 10 stiffened with M.S angles of size 25mmx25

9.18

-

-

... More
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site

10.99

-

-

... More
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.

9.87

-

-

... More
Plastering with cement mortor 1:5 (one cement and five Crushed stone sand (M-SAND)), 12mm thick in all floors including curing etc. complete

27.03

-

-

... More
Supplying and fixing tubular roof truss using pipe of size 60mmx40mmx2.60mm including priming coat etc. complete

495.61

-

-

... More
Painting new iron works such as steel doors windows, ventilators, windowbars, balustrades etc., with two coats of best approved first quality of synthetic enamel paint of approved colour ove complying with standard specification etc.

41.49

-

-

... More
Roofing with Galvanaised iron sheet 3mm thick including coat of "J" bolts and bitumen washer etc., complete

90.48

-

-

... More
Name of the Work : Construction of Kitchen shed at V.pudur PUM school H/O Vaigainallur Panchayat.Kulithalai Union Karur District.

-

-

-

... More
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification

21.5

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.

6.68

-

-

... More
Refilling the basement with excavated earth other than sand including etc complete

7.55

-

-

... More
Brick work in cement mortar 1:3 using country bricks of size 83/4"x41/4"x23/4" etc., complete., With W.P.C. 2%

21.87

-

-

... More
Supplying and erecting centring for sides and sofits including supports and sturtting upto 3.29m ht for plain surfaces including sturting etc., complete

54.61

-

-

... More
above ground level

58.43

-

-

... More
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete

1.23

-

-

... More
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh

11.56

-

-

... More
Flooring top finishing with Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete

38.39

-

-

... More
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.

165.35

-

-

... More
Plastering with cement mortor 1:3 10mm thick in all floors including curing etc., complete complying with standard specification and as directed rails and labour charges etc.,

30.94

-

-

... More
Providing weathering course with best quality of brick Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thicknes

2.03

-

-

... More
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC

29.11

-

-

... More
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc

30.94

-

-

... More
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.

71.17

-

-

... More
Painting two coats of approved Exterior emulsion paint over one priming coat of old wall surface including cleaning preparing the surface and curing etc. complete

89.04

-

-

... More
Painting new iron works such as steel doors windows, ventilators, windowbars, balustrades etc., with two coats of best approved first quality of synthetic enamel paint of approved colour ove complying with standard specification etc.

10.43

-

-

... More
Supplying and fixing following thickness of cuddapah slab for 50mm thick including conveyance etc complete

2.43

-

-

... More
Casting and fixing of RCC Precast slab -50mm thick in CC 1:2:4 using 20mm hbg jelly excluding cost of reinforcement gril inposition including moulding curing and finishing etc. complete complying with standard specifications.

1.44

-

-

... More
Supply of steel Door (0.90x2.10)

1

-

-

... More
Supply of steel Window (0.90x1.20)

4

-

-

... More
Supply of steel Ventilater (0.90x0.60)

1

-

-

... More
Provision for PVC 110mm dia Rain water down fall pipe

7.2

-

-

... More
Supply and fixing of Electrical Arrangements a) Light & Fan Point SD 17

2

-

-

... More
Supply and fixing of Electrical Arrangements b) Plug Point SD 36

2

-

-

... More
Supply and fixing of Electrical Arrangements c) main Switch SD 24

1

-

-

... More
Supply and fixing of Electrical Arrangements d) Service wire SD 64

15

-

-

... More
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.