Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date21 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 59,44,000
Costs
EMD
₹ 60,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
4 Nos Of Works In Arasur Panchayat In Sulur Block In Coimbatore District Under 15th Cfc ( Vp) 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_475504_1Bid Award Id
ViewTender No
1198/2024/A2 Date 09.08.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
For SDR
28.26
-
-
... More
For DMR not requiring blasting
35.33
-
-
... More
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
8.48
-
-
... More
RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete. 1.50m to 4.50m below G.L.
9.95
-
-
... More
0m to 1.50m below G.L.
3.71
-
-
... More
Up to 4.50m above GL From GL
7.1
-
-
... More
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete PLANE SURFACE Below G.L.
-
-
-
... More
0.00m to 3.30m (Plane surface)
2.99
-
-
... More
0.00m to 3.30m (Curved surface)
121.19
-
-
... More
0.00m to 3.30m (Circular Column )
1.48
-
-
... More
3.30m to 4.30m (Plane surface)
22.24
-
-
... More
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete.RTS rod
2.03
-
-
... More
Supply,Delivery and fixing of CI Manhole frame with cover of following size
2
-
-
... More
Supplying and fixing in position of RCC (1:1.5:3) in side access lader of following size using 20mm size HBS jelly including cost of all materials,
1
-
-
... More
Provision for supply & fixing of MS ladder including Painting etc. complete.
1
-
-
... More
Refilling with excavated earth including consolidatin etc. compete as directed by TWAD Bd officers
19.44
-
-
... More
Pain ting with two coats of best Plastic Emulsion paint including all cost of materials
55.67
-
-
... More
Supply of 7.5 HP (75 lpm x 125m) open well supmersible pump including cost and conveyance and all charges,etc.complete
1
-
-
... More
Cost and supply 7.5HP Panel Board
1
-
-
... More
Provision for erection of Submersible Motor
1
-
-
... More
2.Construction of 100000 litre capacity Sump with EPL at Trini garden. H /O Arasur.
-
-
-
... More
Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm. thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed .
-
-
-
... More
For Hard soil 0 to 2m
33.13
-
-
... More
For SDR
44.18
-
-
... More
For DMR not requiring blasting
55.22
-
-
... More
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
13.25
-
-
... More
RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete. 1.50m to 4.50m below G.L.
15.38
-
-
... More
0m to 1.50m below G.L.
4.77
-
-
... More
Up to 4.50m above GL From GL
10.67
-
-
... More
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete PLANE SURFACE Below G.L.
-
-
-
... More
0.00m to 3.30m (Plane surface)
4.23
-
-
... More
0.00m to 3.30m (Curved surface)
156.28
-
-
... More
0.00m to 3.30m (Circular Column )
1.29
-
-
... More
3.30m to 4.30m (Plane surface)
37.26
-
-
... More
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete.RTS rod
2.93
-
-
... More
Supply,Delivery and fixing of CI Manhole frame with cover of following size
2
-
-
... More
Supplying and fixing in position of RCC (1:1.5:3) in side access lader of following size using 20mm size HBS jelly including cost of all materials,
1
-
-
... More
Provision for supply & fixing of MS ladder including Painting etc. complete.
1
-
-
... More
Refilling with excavated earth including consolidatin etc. compete as directed by TWAD Bd officers
20.09
-
-
... More
Pain ting with two coats of best Plastic Emulsion paint including all cost of materials
81.18
-
-
... More
Earth work excavation in all strata for laying pipes including refillinig charges etc. complete as directed by TWAD Bd officers
19.8
-
-
... More
Refilling with excavated earth including consolidatin etc. compete as directed by TWAD Bd officers
19.8
-
-
... More
Cost and supply of 90mm 6KSC Pipes etc.,
30
-
-
... More
Laying and jointing of PVC Pipes etc.,
30
-
-
... More
Supply of 7.5 HP (75 lpm x 125m) open well supmersible pump including cost and conveyance and all charges,etc.complete
1
-
-
... More
Cost and supply 7.5HP Panel Board
1
-
-
... More
Provision for erection of Submersible Motor
1
-
-
... More
3.Construction of drainage from Kakkumalaiandavar kovil to Karupparayan kovil at West Arasur. H / O Arasur.
-
-
-
... More
Earthwork excavation for foundation in all classes of soils and sub-soils to full depth as may be directed, except hard rockrequiring blasting but including shoring strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing and surplus earth in all places shown by the departmental officers with initial leads and lifts etc.,including levelling the sites complete complying with standard specifications and as directed in hard stiff clay,stiff black cotton soil,hard red earth,shales, murrams,gravel,stoney earth and mixed with 50% fair size boulders and hard gravelly soils as per SS20B
147
-
-
... More
Cement concrete 1:4:8 mix using 40 mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials and labour charges for laying and curing etc.,complete complying with standard specifications and as directed
21
-
-
... More
Suppling and erecting shuttering for plane surface in foundation and basement for R.C.C beam column footing etc.,complete complying with standard specifications and as directed.
480
-
-
... More
Cement concrete 1:3:6 mix using 20 mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials and labour charges for laying and curing etc., complete complying with standard specifications and as directed
72
-
-
... More
Plastering with cement mortar 1:5 mix 20mm thickness including all cost and conveyance of all materials from approved quarry to site including curing etc.,complete complying with standard specifications and as directed.
90
-
-
... More
4.Strengthening to the road from Uthupalayam - Subrayampalayam road to Chettikuttai road. H / O Arasur.
-
-
-
... More
Clearing the scrub jungle including all labour charges for burrying and burning etc., complete.
979.2
-
-
... More
Supply and filling the collected gravel for Sub base and side Berms etc, complete.including all cost of materials and labour charges etc
136
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
382.5
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
2550
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
2550
-
-
... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
2550
-
-
... More
Road Marking with Hot Applied Thermoplastic compound with refctorising glass beads on Bituminous surface.
136
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements