Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date20 Sep 2024
Closing Date26 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 11,170Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_485988_3Tender No
2841/2024/A2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dismantling of cement morter for flooring and dismantling and the deprises are clearing away from site and stacking materials at site useful for reuse etc complete
22.09
-
-
plastering with Cement Mortar 1:3 (One cement and Three sand), 10 mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
22.09
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
28.29
-
-
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (30% old & 70% New)
69.46
-
-
Supplying and painting the walls with Single coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
160.73
-
-
Black Board Paints two coats using Black Oxide including cost and conveyance of all materials to site and all labour charges etc comoplete
13.5
-
-
Supplying and painting two coats Old iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
37.08
-
-
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
70.62
-
-
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.k).
178.88
-
-
Providing Bala Paintings including cost and conveyance of materials and labour charges etc complete.
63.24
-
-
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in Suitable PVC rigid pipe consealed in wall and ceiling with PVC accessories in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch and making good of the consealed portion with suitable colour for PVC consealed light/Fan points (for electronic regulator) (5 points per Coil) SD 23
4
-
-
Wiring with 2x4 sqmm (56/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in Suitable PVC rigid pipe consealed in wall and ceiling with PVC accessories in flush with wall with 150x100x113mm switch box with 3mm thick hylum sheet for 15A 3 pin non interlocking wall socket with 15A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the consealed portion with suitable colour for PVC consealed Power Plug Point SD 40
4
-
-
Supply and fixing of 1200mm (48") AC Ceiling fan complete with stepped electronic 300W regulator with 1m down rod on the existing clamp SD 107
4
-
-
Supply and fixing of Single Box type 4'36 W flourecent fitting complete with electronic ballast with TW Round blocks on wall or ceiling with flu tube with PVC unsheathed copper leads from terminals to the fitting SD 87
4
-
-
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in Suitable PVC rigid pipe consealed in wall and ceiling with PVC accessories in flush with wall with 150x100x113mm switch box with 3mm thick hylum sheet for 5A 3 pin non interlocking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the consealed portion with suitable colour for PVC consealed PVC Plug Point SD 38
4
-
-
Supply and fixing of 5A 3pin and 2 pin combined flush type wall socket with 5A flush type switch consealed in suitable MS box in flush with wall SD 134
4
-
-
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
15.2
-
-
Sub Estimate for Providing Cupboard for Teachers
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.44
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
7.32
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
7.32
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
3.65
-
-
Providing Cupboard shutter with frame using termite/water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along the neccessary furniture fittings such as hydraulic hinges tower bolt handles multi purpose locks etc as directed by the departmental officers the design pattern water proof plywood laminate sheet and other materials should be got approved from the executive engineer before use on work
2.88
-
-
Sub Estimate for Providing Cupboard for Chappalrack
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.49
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
9.1
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
9.1
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
2.79
-
-
Sub Estimate for Providing Cupboard
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.81
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
12.29
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
12.29
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
9.45
-
-
Sub Estimate For Construction of Pedastal
-
-
-
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
0.34
-
-
Cement Concrete 1:4:8 (One cement, Five sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
0.11
-
-
Brick work in following Cement Mortar using Fly Ash Bricks of 230 x 110 x 70mm size conforming to IS: 12894-1989 Class designation not less 50 kg./ sq.cm. average compressive strength in cement mortar 1:5 for load bearing structures for foundation and basement and for superstructure including curing, etc., complete complying with standard specifiction.
1.13
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
5
-
-
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.k).
5
-
-
Supply Delivewry and Fixing in Position of 500 litre Capacity Sintex Tank including cost and conveyence of all materials to work site and labour all charges etc complete
1
-
-
Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works)
1
-
-
Supplying laying and jointing PVC Pipe Above ground level (External)got approved by the Executive Engineer before use on the works)
6
-
-
Renovation of South Facing Tiled Two Class Room Building in PUE School at Pachudaiyampalayam H/O Pachudaiyampalayam
-
-
-
Removing and Readjusting Mangalore Tiles over Ceiling tiles of Best quality including all labour for fixing but excluding the cost of etc., complete.for 10Sq.M ( Labour only )
125.12
-
-
Dismantling of Weathering Course and Pressed Tiles dismantling and the deprises are clearing away from site and stacking materials at site useful for reuse etc complete
108.12
-
-
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
108.12
-
-
Black Board Paints two coats using Black Oxide including cost and conveyance of all materials to site and all labour charges etc comoplete
39.6
-
-
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
100.67
-
-
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
133.16
-
-
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
20.42
-
-
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
21.16
-
-
Supply of Steel Window including cost and conveyence etc,complete
4
-
-
Supply of Steel door including cost and conveyence etc,complete
1
-
-
Labour Charges for Steel Window including cost and conveyence etc,complete
7.2
-
-
Providing Bala Paintings including cost and conveyance of materials and labour charges etc complete.
68.18
-
-
Sub Estimate for Providing Cupboard for Teachers
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.22
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
3.07
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
3.07
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
1.82
-
-
Providing Cupboard shutter with frame using termite/water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along the neccessary furniture fittings such as hydraulic hinges tower bolt handles multi purpose locks etc as directed by the departmental officers the design pattern water proof plywood laminate sheet and other materials should be got approved from the executive engineer before use on work
1.44
-
-
Sub Estimate for Providing Cupboard student
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.81
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
12.29
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
12.29
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
9.45
-
-
Sub Estimate for Providing Cupboard for Chappalrack
-
-
-
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
0.49
-
-
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
9.1
-
-
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
9.1
-
-
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
2.79
-
-
Renovation of Boys Toilet at PUE School at Pachudaiyampalayam H/O Pachudayampalayam
-
-
-
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
32.24
-
-
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
38.75
-
-
Cement Concrete 1:4:8 (One cement, Five sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
0.97
-
-
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
9.66
-
-
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements