Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Eprocure
Opening Date17 Sep 2024
Closing Date19 Sep 2024
Tender Amount₹ 10,24,800 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
White washing two coats using shell lime including cost and conveyance and all labour charges etc

93.41

-

-

... More
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete

22.66

-

-

... More
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

25.73

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

97.89

-

-

... More
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete

18.33

-

-

... More
Provision For Electrification Works

-

-

-

... More
Wiring provision for Future Upgradation works with Smart class facility

1

-

-

... More
Light & Fan Point

6

-

-

... More
15Amps plug point

1

-

-

... More
LED Light

4

-

-

2

-

-

... More
Provision for Pedestal for Keeping

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

0.08

-

-

... More
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications

0.01

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

0.01

-

-

... More
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete

0.1

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

1.36

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete

1.44

-

-

... More
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,

0.9

-

-

... More
Provision for Cup Doards

-

-

-

... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.

1.35

-

-

... More
Repairs to Tiled Roof School Building at Manapatti PUES in Samuthiram Panchayat

-

-

-

... More
Chipping of concrete and roughening the surface

96.9

-

-

... More
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality including CW reepers -10Sqm

115.23

-

-

... More
Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thick including cost and conveyance and all labour charges etc

96.9

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

19

-

-

... More
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc

152.48

-

-

... More
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

28.74

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

123.56

-

-

... More
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete

15.11

-

-

... More
Provision For Electrification Works

-

-

-

... More
Wiring provision for Future Upgradation works with Smart class facility

1

-

-

... More
Light & Fan Point

6

-

-

... More
15Amps plug point

1

-

-

... More
LED Light

4

-

-

2

-

-

... More
Provision for Pedestal for Keeping

-

-

-

... More
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

0.08

-

-

... More
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications

0.01

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

0.01

-

-

... More
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete

0.1

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

1.36

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete

1.44

-

-

... More
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,

0.9

-

-

... More
Provision for Cup Doards

-

-

-

... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.

1.35

-

-

... More
Repairs to RCC Roof Kitchen Shed@ Manapatti PUES in Samuthiram Panchayat

-

-

-

... More
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm 50% New Tiles

18.9

-

-

... More
Chipping of concrete and roughening the surface

18.9

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

1.89

-

-

... More
Providing granolethic floor finish with ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum

18.9

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

9.9

-

-

... More
White washing two coats using shell lime including cost and conveyance and all labour charges etc

18.9

-

-

... More
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete

35.1

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

43.67

-

-

... More
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete

3.6

-

-

... More
Renovation to Boys Toilet @ Manapatti PUES in Samuthiram Panchayat

-

-

-

... More
Chipping of concrete and roughening the surface

7.34

-

-

... More
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.

6.71

-

-

... More
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials to site and all labour charges etc., complete.

18.57

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

1.45

-

-

... More
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

2.8

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

0.9

-

-

... More
White washing two coats using shell lime including cost and conveyance and all labour charges etc

0.9

-

-

... More
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office

1.27

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

34.2

-

-

... More
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete

4.8

-

-

... More
Supplying and fixing of RCC rings for Leach pit including all charges etc complete

-

-

-

... More
900mm Rings for Toilet

3

-

-

... More
600mm Rings for Urinal

3

-

-

... More
Supplying and fixing of cover slab including all charges etc complete

-

-

-

... More
900mm Cover Slab

1

-

-

... More
600mm Cover Slab

1

-

-

... More
Supply and Fixing of Indian type Water closet 580x440mm of approved quality

1

-

-

... More
Provision for water Supply Arrangements

-

-

-

... More
Supply and Providing 1000 Lit HDPE Tank

1

-

-

... More
Supply and Fixing of 20mm dia PVC pipe

60

-

-

... More
Supply and Fixing of 50mm dia PVC pipe

30

-

-

... More
Supply and Fixing of 20mm dia PVC Coupler

6

-

-

... More
Supply and Fixing of 20mm dia PVC Bend

3

-

-

... More
Supply and Fixing of 20mm dia PVC Tee

6

-

-

... More
Supply and Fixing of 50mm dia PVC Coupler

4

-

-

... More
Supply and Fixing of 50mm dia PVC Elbow

3

-

-

... More
Supply and Fixing of Water Tap

5

-

-

... More
Renovation to Girls Toilet@ Manapatti PUES in Samuthiram Panchayat

-

-

-

... More
Chipping of concrete and roughening the surface

15.22

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

2.28

-

-

... More
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.

15.09

-

-

... More
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials to site and all labour charges etc., complete.

17.2

-

-

... More
White washing two coats using shell lime including cost and conveyance and all labour charges etc

4.42

-

-

... More
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office

22.05

-

-

... More
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)

20.15

-

-

... More
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete

4.8

-

-

... More
Supplying and fixing of RCC rings for Leach pit including all charges etc complete

-

-

-

... More
900mm Rings for Toilet

3

-

-

... More
600mm Rings for Urinal

3

-

-

... More
Supplying and fixing of cover slab including all charges etc complete

-

-

-

... More
900mm Cover Slab

1

-

-

... More
600mm Cover Slab

1

-

-

... More
Supply and Fixing of Indian type Water closet 580x440mm of approved quality

2

-

-

... More
Provision for water Supply Arrangements

-

-

-

... More
Supply and Providing 1000 Lit HDPE Tank

1

-

-

... More
Supply and Fixing of 20mm dia PVC pipe

60

-

-

... More
Supply and Fixing of 50mm dia PVC pipe

30

-

-

... More
Supply and Fixing of 20mm dia PVC Coupler

6

-

-

... More
Supply and Fixing of 20mm dia PVC Bend

3

-

-

... More
Supply and Fixing of 20mm dia PVC Tee

6

-

-

... More
Supply and Fixing of 50mm dia PVC Coupler

4

-

-

... More
Supply and Fixing of 50mm dia PVC Elbow

3

-

-

... More
Supply and Fixing of Water Tap

5

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.